Public Works Department Tender
View complete overview of Manipur PWD Tender
Costs
EMD
₹ 2,06,500Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDM1_2317_1Tender No
EE/TBL/etender/2023-24/2 dt. 12.01.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://pwdmanipur.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Pipe Culvert
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I) Ordinary soil. A) Manual Means. Depth upto 3m
22.5
-
-
... More
Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row. (Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.) NP-3 Pipe
15
-
-
... More
Construction of Pucca Drain
-
-
-
... More
Earth work in excavation by mechanical means (Hydraulic Excavator)/manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 metres, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 metres. .
1132.8
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - F) 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size )
141.6
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - F) 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size )
29.5
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footing, bases of columns, etc for mass concrete.
3304
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - F) 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size )
413
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements