Public Works Department Tender

View complete overview of Manipur PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date23 Feb 2024
Closing Date29 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Surface drains in soil (Construction of unlined surface drain of average cross sectional area 0.4 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 to 309. Excavated materials to be used in embankment at site within a lead of 1000 meters.)

5650

-

-

... More
SH: Construction of Pipe Culvert)

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material i) Ordinary Soil a) Mechanical Means (Depth upto 3 m)

175.68

-

-

... More
Cement concrete 1:4:8 mix with stone aggregate 40mm nominal size in foundation upto a depth of 1.5 metres below ground/bed level and upto height of 1.5m above ground/bed level.

17.12

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixwd, placed in foundation and compacted by vibration including curing for 14 days)

65.64

-

-

... More
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing cement with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets a) NP-3 Pipe i) 900 mm dia

30

-

-

... More
Back filling behind abutment, wing walls and return wall complete as per drawing and technical specification a) Granular material

63.52

-

-

... More
SH: Construction of CC R/Wall 2.00 m height

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material i) Ordinary Soil a) Mechanical Means (Depth upto 3 m)

167.78

-

-

... More
Back filling behind abutment, wing walls and return wall complete as per drawing and technical specification a) Granular material

58.9

-

-

... More
Cement concrete 1:4:8 mix with stone aggregate 40mm nominal size in foundation upto a depth of 1.5 metres below ground/bed level and upto height of 1.5m above ground/bed level.

19.23

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications (a) Random Rubble Masonry

114.37

-

-

... More
Providing weep holes in brick masonry/plain/reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing force. Complete as per drawing and technical specifications

81.74

-

-

... More
Providing and laying of filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of Morth specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification

36.06

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.