NHPC Limited Tender

View complete overview of Manipur NHPC Tender

NHPC Limited - NHPC Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date3 Sep 2024
Closing Date24 Sep 2024
Tender Amount₹ 1,28,49,847 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for Repairing of Loktak-Leimatak road from Tiddim Gate to Pump House at Awang Bazar and road from Tiddim Gate to Bamboo Trash Rack, Loktak Project.
BOQ for Repairing of Loktak-Leimatak road from Tiddim Gate to Pump House at Awang Bazar and road from Tiddim Gate to Bamboo Trash Rack, Loktak Project.
Tender document for Repairing of Loktak-Leimatak road from Tiddim Gate to Pump House at Awang Bazar and road from Tiddim Gate to Bamboo Trash Rack, Loktak Project.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on prepared bituminous/granular surface cleaned with mechanical broom.

18166.96

-

-

... More
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using Viscocity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.) (i) Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75 tonnes/hour.

18166.96

-

-

... More
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) i) Case - I : Type A

18166.96

-

-

... More
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint confirming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ): Up to 10 cm in width

1086.2

-

-

... More
Plain/Reinforced cement concrete in Open foundation complete as per drawing and Technical Specifications: PCC Grade M25:PCC Grade M25 using batching plant & Concrete pump

140.08

-

-

... More
Maintenance of road during the 1st year (Date recognized from the completion date of defect Liability period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 1st year (Start date will be recognized from the completion date of defect Liability period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 1st year (Start date will be recognized from the completion date of defect Liability period of 01 Year).

1

-

-

... More
Maintenance of road during the 2nd year (Date recognized from the completion of 1st year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 2nd year (Date recognized from the completion of 1st year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 2nd year (Date recognized from the completion of 1st year maintenance period of 01 Year).

1

-

-

... More
Maintenance of road during the 3rd year (Date recognized from the completion of 2nd year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 3rd year (Date recognized from the completion of 2nd year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 3rd year (Date recognized from the completion of 2nd year maintenance period of 01 Year).

1

-

-

... More
Maintenance of road during the 4th year (Date recognized from the completion of 3rd year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 4th year (Date recognized from the completion of 3rd year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 4th year (Date recognized from the completion of 3rd year maintenance period of 01 Year).

1

-

-

... More
Maintenance of road during the 5th year (Date recognized from the completion of 4th year maintenance period of 01 Year). This item will be paid only after the maintenance of road as good as BOQ items 01 to 08 will be executed during the execution of the work and completion of the 5th year (Date recognized from the completion of 4th year maintenance period of 01 Year). This item will be paid only after the certification from EIC regarding fitness of the road after completion of 5th year (Date recognized from the completion of 4th year maintenance period of 01 Year).

1

-

-

... More
Add EPF @ 0.65%

1

-

-

... More
Add CESS @ 1.00%

1

-

-

... More
Add GST @ 18.00%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.