Manipur University Tender
View complete overview of Manipur Manipur University Tender
Manipur University Tender
Civil And Construction
Building Construction
Eprocure
Opening Date11 Mar 2024
Closing Date19 Mar 2024
Tender Amount₹ 10,46,683
Costs
EMD
₹ 20,940Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MU_799925_1Bid Award Id
ViewTender No
MU/2(117)/2023-UE/1302Tender Authority
Manipur University ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing ,laying , spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the meterial with water at OMC in mechnical mixer (pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub- base/base course on a well prepared underbase and compacting withpower vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion, etc .
55.24
-
-
Preparing surface by brushing with wire brushes for remaining caked mud etc. sweeping with brooms and finally fanning the cleared surface with gunny bags to removed all loose dirt etc. (a) Water bound macadam surface new
388.65
-
-
Providing & applying evenly a priming/tack coat with bitumen (80/100). (a) 10 kg/10sqm
777.3
-
-
Providing and laying bituminous macadam of 50 mm as per clause 504.1 of "MOST" specification for base course with binder content @ 4% by weight of total mix including preparation of bases including filling of pot holes, cleaning the surface with wire brushes etc. and providing suitable edge supports heating of binder and aggregate handling of materials, screening, mixing, in hot mix plant conforming and transporting laying and finishing with paver finisher to the required level, grade and camber, rolling by power roller etc. complete including running expenses of all plants.
38.87
-
-
Providing & laying 12 mm thick Mix seal surfacing @ 0.18 cum per 10 sqm of road surface using bitumen for tack coat @ 5 kg per 10 sqm and for mixing @ 4.5 % to be done by Hot Mix plant and paver finisher.
388.65
-
-
Culvert
-
-
-
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5 metres including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 metres Loose/Soft Soil
19.03
-
-
Cement concrete 1:4:8 mix with stone aggregate 40 mm nominal size in foundation upto a depth of 1.5 metres below ground level and upto height of 1.5 m above ground/bed level.
2.38
-
-
Plain cement concrete M 15 mix with stone aggregate 20 mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 m below ground level and or 1.5 m above ground/bed level i/c formwork.
8.7
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
252.83
-
-
Reinforced cement concrete M 20 mix with stone aggregate 20 mm nominal size mechanically mixed and vibrated for reinforced concrete work in slab excluding steel reinforcement, but including centering and shuttering laid in position.
1.25
-
-