Assam Rifles Tender

View complete overview of Manipur Assam Rifles Tender

Assam Rifles Tender

Works
Civil And Construction
Eprocure
Opening Date25 Jun 2018
Closing Date17 Jul 2018
Tender Amount₹ 74,81,298 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ for financial bid of Provision of security fencing for COB Sugnu of AR Bn at Kakching (Manipur).
Tender documents for technical bid of Provision of security fencing for COB Sugnu of AR Bn at Kakching (Manipur).
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

2000

-

-

... More
Excavating holes more than 0.10 cum & upto 0.50 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m for all kinds of soil.

800

-

-

... More
Providing and laying in position cement concrete of grade 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).

56.6

-

-

... More
Supply and fixing angle iron post & strut of size 65x65x6 mm including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.

13920

-

-

... More
Providing & fixing 10 mm dia, 75 mm long Nuts & bolts including washers complete @ 500 c/c.

391

-

-

... More
Supply and fixing 50x4 mm flat iron including cutting, hoisting, drilling holes and fixing in position and applying a priming coat of approved steel primer all complete.

2135.2

-

-

... More
Supply and fixing 8 mm dia mild steel bar including straightening, cutting, bending placing in position, inserted with chain link and tied with angle iron and flat iron with nut-bolts.

2370

-

-

... More
Providing and fixing GI chain link fabric fencing made of 4 mm dia GI wire of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in Charge.

4000

-

-

... More
Providing and fixing G.I. barbed wire fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately).

8000

-

-

... More
Material and labour for two or more coats painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade over one coat of red oxide primer on iron surface of angle iron posts, struts.

535.6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.