The WCL has issued a formal invitation for competitive bids for the Western Coalfields Limited project, for Rehabilitation Of Chp-68 At Ukni Deep Ocm Of Ukni-junad Sub Area in Yavatmal, Maharashtra, with an estimated contract value of Rs. 77,99,460. The bid opening date for this tender is 23-01-2025 and the last date for bid submission is 10-02-2025. Interested bidders for Western Coalfields Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Western Coalfields Limited - WCL Tender
Opening Date23 Jan 2025
Closing Date10 Feb 2025
Tender Amount₹ 77,99,460
Costs
EMD
₹ 97,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WCL_326704_1Bid Award Id
ViewTender No
wn4650-civ- e060-2024-25 Date 23.01.2025Tender Authority
Western Coalfields Limited ViewPurchaser Address
-Website
http://http://www.westerncoal.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Painting on structural steel work with ready mixed paint New work (Two or more coats)
47.4
1750
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
49.32
742
-
... More
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet
148.5
127
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.29
9394
-
... More
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
38100
4
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
36.56
200
-
... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil
194.6
136
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, holsting, fixing in position and applying a priming coat of approved steel primer all complete. (labour Rate Only)
2549.68
36
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
15.72
7974
-
... More
Supplying of boulder & stone dust and filling in plinth (100cft and 40 cft dust for 100 cft finished. Details for boulder 100 Cum. cft (2.83 Cum)
14.07
2506
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
14.58
306
-
... More
Carrage of material including loading and unloading. Murrum, Building Rubish, Earth Lead 1.00 KM
255.17
186
-
... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
24.01
2792
-
... More
Total impact of GST for the purpose of CTC
1
-
-
... More
Supplying and filling in plinth with stone dust under floors, including watering, ramming, consolidating and dressing complete.
8.31
1445
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
47400
118
-