Water Resources Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Water Resources Department - WRD Tender

Services
Civil And Construction
Eprocure
Opening Date23 Sep 2024
Closing Date30 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

  • EMD

    ₹ 52,000
  • Document Cost

    ₹ 2,360
  • Tender Fee

    ₹ 500

Summary

Survey And Investigation Of Mahagaon Garra Lis Tah Aheri Dist Gadchiroli

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No.4 :-Block contour survey of 150mx30m grid (Not less than 5 raw data points distributed uniformly over a Hector) for irrigation projects using digital state of art DGPS, including transfer of entire data to computer system in different geo referential layer/themes using features of standard plotting Soft wares compatible with canal irrigation system design Software packages including contour plotting at specified interval and scale. The test print of the drawings hall be approved by Engineer-in-charge and the same shall be delivered in a CD format as well as hard copy in six numbers including one print on tracing paper, For Finalization of Command Area (Considering PDN Network Planning) As directed by the Engineer-in-charge.

4986

129636

26

... More
Item No.5 :-Providing permanent bench mark dressed stone of basalt, granite or gniess of size 30 cm X 30 cm X 45 cm at least 15 cm below the ground and embedding it to a depth of 30 cm in grade M-15 in situ concrete of size 90cm X 90 cm X 60 cm deep over 1 M deep foundation concrete of grade M-10 including excavation, concrete, providing and fixing dressed stone and backfilling the pit up to ground level with sand etc, complete, As directed by the Engineer-in-charge.

5

47504

9500.7

... More
Item No.6 :- Fixing precast RCC alignment blocks (piller) on alternative dam site finally approved of size 900 X 175 X 100 mm at 90 m interval including fixing in 1:3:6 (600X450X450 mm) cement concrete, excavation, backfilling and coloring etc, complete, with all lifts As directed by the Engineer-in-charge. (0.75 Kg)

45

42629

947.3

... More
Item No 7:- Core Drilling by calyx machine 25 m. deep, 1 no. for Pump House including collection of disturbed, undisturbed soil samples & water samples, conduction of Standard Penetration Test, visual classification at regular interval, necessary laboratory tests on soil/ rock/ water samples, wherever required & possible For SBC. As directed by the Engineer-in-charge

2

300000

150000

... More
Item No 8:- Planning & Designing of complete Lift Irrigation Scheme with details of drawings for civil, mechanical and electrical components necessary for construction, execution and commissioning of lift irrigation scheme including necessary RCC structural design with all necessary details of drawings for all pump house components, Rising Main as per annexure attached, details of switch yard, control panel, pump design etc. including all drawings and Design Notes vetting from CDO authority with all parameters etc. in 8 copies having attractive coverand binding as directed by engineer in charge etc. complete. (Tentative List of Drawings as per Annexure – VII attached)

1

3599999

3600000

... More
Item No 9:- Preparation and submission of Detailed Estimates of Civil Components of LIS for DPR Prepration etc. complete. As directed by the Engineer-in-charge

9

438039

48671

... More
Item No 10:- Preparation of draft/Final Report comprising of Technical, Financial economic feasibility and environmental aspects of the project including executive summery and detailed chapter on necessity and introduction of project existing and future traffic, design philosophy scope of work, summary of available cost estimates justification for rates adopted, key points of execution, salient features of projects, B.C. Ratio Calculation/ IRR Calculation and Reports Etc. Specification of major construction items etc. in 8 Copies complete As directed by the Engineer-in-charge.

1

379724

379724.3

... More
Item No 11:- Preparation, submission & Clearence of all necessary proposal For Administrative Approval inclusive of taking follow up for remarks, compliances, approval and clearances from various authorities up to SLTAC level etc. and Complete. As directed by the Engineer-in-charge

1

108803

108803



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.