Tourism And Cultural Affairs Department Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Tourism And Cultural Affairs Department Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Oct 2024
Closing Date16 Oct 2024
Tender Amount₹ 79,50,212
Costs
EMD
₹ 79,502Document Cost
₹ 1,180Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TCADM_1111477_1Bid Award Id
ViewTender No
etender/Notice 01/2024-25Tender Authority
Tourism And Cultural Affairs Department ViewPurchaser Address
-Website
http://mahatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete.(Item No.4)
62.55
580
36279
... More
Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete(Item No.5)
41.7
1509
62925.3
... More
Numbering the monument elements in proper order before lowering down with approved colour and shade as directed by Engineer in-charge, including ladder, scaffolding etc. complete. (Item No.6)
33
56
1848
... More
Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete. (Item No.7)
49.5
1710
84645
... More
Conducting scientific excavation in all types of soils including diging gently a layer of 1 to 5 cm at a time to protect the hidden antiquities seiving the excavated material separating antiquities and storing soil antiquities at suitable location as directed by research assistant / excavation incharge etc. complete (Item No.8)
3120.3
560
1747368
... More
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) By Manual Means (Item No.9)
504
249
125496
... More
Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.. (Item No.10)
32.76
8813
288713.88
... More
Providing/Re-setting Ashlar Fine Masonry of reuse-stones in lime mortar 1:1 in superstructure as per detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. (Item No.11)
20.79
6913
143721.27
... More
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with average size of stone 60 cm. x45 cm. x23 cm. in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.For face wall in wall (Item No.12)
8.91
43342
386177.22
... More
Providing Ashlar Arching of trap / granite stones in lime mortar 1:1, with size of stone 60 cm. x 45 cm. x 45 cm. . as per detailed specifications and drawings or as directed including the arch stones be of approved quality, colour, hard and free from defect of any kind, the arch stones in all cases of the entire thickness, the arch stones shall be dressed full and true to their proper shapes with the necessary summering, twist or winding and be set in fine mortar, the intrados, joints and beds to fair tooled and left full, the cast or keying course to be accurately fitted, at all horizontal joints the intrados to have a 2 cm. (¾″) chamfer, the face stone may be tooled or rock-faced with or without chamfer as directed, in arches up to 60 cm. (2ꞌ) in depth all stones shall be of the full thickness of the ring, arches to be built on proper centring, the bed joints shall be radial and the side joints shall be at right angles to the bed joints and the thickness of the joints shall not exceed 5 mm. (3/16″) preparing the lime mortar in lime miller, cantering/scaffolding, watering and all arch work when handed over to be perfectly clean and free from all mortar stains etc. complete. (Item No.13)
3.6
70778
254800.8
... More
Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete.(Item No.14)
119.79
8121
972814.59
... More
Providing 12 mm. thick Rough Cast Lime Plaster in single coat in lime mortar 1: 1½: in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete.(Item No.15)
798.6
846
675615.6
... More
Providing Fine Coat of Lime over rough cast plaster in superstructure, as per detailed specifications and drawings or as directed including the finishing coat is to be applied over rough cast plaster and well-polished with trowel, preparing the lime mortar, scaffolding and watering complete.(Item No.16)
798.6
545
435237
... More
Providing Lime Pointing to stone work in lime mortar 1:1 in plinth, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete (Item No.17)
528
371
195888
... More
Providing and fixing Teak Wood Panelled Door First Class (1.20 m. x 2.10 m.) with frame 100 mm. x 125 mm section and fully panelled shutters double leaf as per detailed specifications and drawings or as directed including the best quality and well-seasoned Moulmein teak, to be properly framed and mortised together, the head and stills being provided with horns 15 cm long, all parts set in masonry to be well coated with boiling coal tar, the styles, top, bottom, lock and frieze rails 38 mm (1½″) thick with fitted moulding or as specified, the panels 32 mm (1¼″) thick to be raised, feather-tongued in to styles and rails with beaded edges on both sides, each leaf to be hung with 3 brass butt hinges 125 mm. with brass screws, furnished with pair of aldrops 16mm. diameter & 300 mm. length, pair of patent handles 150 mm., pair of tower bolts 10 mm. dia. & 250 mm. length, tower bolt 10 mm. dia. & 200 mm. length, and pair of hooks & eyes 200 mm. all of brass etc. complete. (Item No.18)
43.2
17668
763257.6
... More
Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scraping, applying French polish, scaffolding if required etc. complete.(Item No.19)
109.44
862
94337.28
... More
Disposing off / conveying the dismantelled materials of stone masonry / brick masonry/ concrete/ debris/ excavated material / soil murrum / rubbish material or vegetation / grass / shrubs etc. from site to 5 Km as directed by Engineer incharge (Item No.20)
3274.05
262
857801.1