Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Tourism And Cultural Affairs Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date15 Mar 2024
Closing Date22 Mar 2024
Tender Amount₹ 7,99,82,141
Costs
EMD
₹ 4,00,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TCADM_1035966_1Bid Award Id
ViewTender No
etender/Notice 32/2023-24Tender Authority
Tourism And Cultural Affairs Department ViewPurchaser Address
-Website
http://mahatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.
413.63
604036
1460.33
... More
Shifting & stacking properly of existing collapsed & Lowered stone members manual lite pillars, stone beam, stone karnasillass stone cap and other temple members in dry masonry including lifting, stones manually and striking lowering stone in proper order, numbering as directed by engineer incharge etc complete .(for lowering of any shape and size of columns, pedastals, bracket, beams, chajjas, karnashilla caps, other stone members of stone wall, etc.)
413.63
79416
192
... More
Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete. A) While lowering of members
1047.88
2515959
2401
... More
Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete. B) While restoring the members
1047.88
1334999
1274
... More
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Manual Means
470.12
112358
239
... More
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m.beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary backfilling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Manual Means
216.64
68024
314
... More
Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete.complete. (Lift from 1.5 to 3.0 m) By Manual Means .
54.16
22422
414
... More
Providing soiling using 80 mm size trap metal in 15cm. Layer including filling voids with sand/ grit ramming, watering complete.
83.46
218999
2624
... More
Providing and filling sand in foundation trenches/below Raft as per drawing and technical specifications etc. complete. (Coarse Sand and Gravel ) .
108.32
564980
5215.85
... More
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete.
180.53
3791
21
... More
Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete. for pile filling and pile caps For Plum Concrete. (30% Rubble Supply)
108.32
851503
7861
... More
Providing Dry Stone Masonry of trap / granite stones as per detailed specifications and drawings or as directed including in each course, headers hammer-dressed either height of the course are to be placed and to 1.5 metre (5ꞌ) apart, the stones need not be dressed, but should be as flat-bedded as possible, no stone shall be less in breadth or length than height and not joints shall be more than 12.5 mm. (½″), the work to be brought up with a better of not less than 1 in 12, etc. complete. (Size 1.4 x 0.9 x 0.9 m)
162.48
3914468
24092
... More
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone stone 90 cm x 60 cm x 30 cm in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
459.18
29679558
64636
... More
Providing/Re-setting Ashlar Fine Masonry of reuse-stones in lime mortar 1:1 in plinth as per detailed specifications and drawings or as directed including the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course, the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, bailing out water, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For GarbhaGriha Sabhamandap ardhamandap, plinth External and innernal face in wall
79.36
541524
6823.64
... More
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 150 cm x 90 cm x 90 cm in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pillars & Pillasters of Temple
36.34
1709070
47030
... More
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 75 cm x 75 cm x 75 cm in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pedestals of Temple.
17.98
848817
47209
... More
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 325 cm x 60 cm x 60 cm in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Stone Beams of Temple.
20.75
1523340
73414
... More
Providing Ashlar Fine Masonry of trap / granite stones in lime mortar 1:1 with size of stone 152 cm x 152 cm x 30 cm in superstructure as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Slabs, Ceilings of Temple.
179.89
11412131
63439.5
... More
Providing and fixing Stone Paving, Second Sort in lime mortar 1:1½, with size of stone 54 cm x 45 cm x 20 cm as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1″), the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete. For Pavement
342.85
3284845
9581
... More
Providing/Re-setting Stone Paving, Second Sort of reuse-stones in lime mortar 1:1½, per detailed specifications and drawings or as directed including the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.For Pavement
62.42
135388
2169
... More
Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.
61.92
568425
9180
... More
Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete.
30.32
294710
9720
... More
Carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chiselling & dressing on stone surface for grove and cuts at the stone surface after chisling a fine surface rate
10.62
9721081
915356.1
... More
Surface carving ornamental work including moulding, grove, chisseling & dresing the same part with fine finishing as per existing/similar type of work of on the stone surface of any type & size or as directed by engineer in charge etc. complete. The charges for chisscling & dressing on stone surface for ornamental carving work surface rate for as per market rate
454.94
4936108
10850.02
... More
Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete
160.8
58683
364.95
... More
Providing Fine Coat Of Lime over rough cast plaster in superstructure, as per detailed specifications and drawings or as directed including the finishing coat is to be applied over rough cast plaster and well-polished with trowel, preparing the lime mortar, scaffolding and watering complete. ( For Waterproofing of roof )
145.44
76501
526
... More
Providing and fixing Teak Wood Ledged Door (1.20 m. x 2.10 m.) with frame of 100 mm. x 125 mm section and Ledged shutters double leaf as per detailed specifications and drawings or as directed including the best quality and well-seasoned Moulmein teak, to be properly framed and mortised together, vertical boards of 38 mm (1½″) thick and 17 cm. (3″) width connected together by 3 horizontal ledges of 38 mm (1½″) thick and 7.5 cm. width screwed across the back of the door, the boards to be planed, tongued and grooved, each leaf hung with 3 iron strap hinges 125 mm. with iron screws, furnished with pair of aldrops 16mm. diameter & 300 mm. length, pair of patent handles 150 mm., pair of tower bolts 10 mm. dia. & 200 mm. length, tower bolt 10 mm. dia. & 200 mm. length, and pair of hooks & eyes 250 mm. all of irons etc. complete.
13.74
190250
13846.45
... More
Providing and applying priming coat over new wood and wood based surfaces, including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting, scaffolding etc. complete
27.48
934
34
... More
Providing and applying two coats of lead / zinc base oil paint / bituminous paint of approved colour and shade to new wood work and fiber boards including preparing the surface, knotting, scaffolding if necessary, excluding primer coat etc. complete.
27.48
2445
89
... More
Cleaning the Stone / Masonry surfaces with help of chemical treatment with mixture of Chemicals such as Liquid Ammonia, Non-ionic detergent, mineral turpentine, sodium gluconate etc. by scraaping the surface with brush and making the surfaces even with hand scrapping, and then applying two coats of Chemicals such as Wacker BS-290 and Wacker OH 100 for stone preservation with scaffolding etc. complete.
130.7
136737
1046.19
... More
Providing and grouting with lime and fine screened sand slurry in proporation of (1 : 1) with a proper jet pump pressure including cleaning and washing and packing the existing crack / holes in the brick or stone masnory with lime and finesand paste in proporation of (1:1) properly from down side, filling the slurry in cracks or holes including all necessary actions and required tools and machineries, scaffolding, curing etc. complete
68.12
7554
110.9
... More
Providing Un-coursed Rubble Masonry of trap / granite stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
85.05
815884
9593
... More
Providing Ashlar Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½ with size of stone 60 cm. x 30 cm. x 23 cm. in superstructure as per detailed specifications and drawings or as including the stones be of approved quality, colour, hard and free from defect of any kind, the faces exposed to view shall have fine dressed chisel draft, 25 mm. (1″) wide all around the edges and rough tooled between the drafts, and on all beds or joints, which shall not exceed 6 mm. (¼″), the stones shall be set in mortar, the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
60.75
2968488
48864
... More
Disposing / comveying old stone members scattred in the temple premses with loading, unloading and properly stacking within 1 km distance from the site as directed by the engineer in charge etc. complete
958.61
178301
186
... More
Preparing and carrying out videography, Documentary & Shooting of still photographs of Extra copies - 5" X 7" Size outdoor and indoor of roads, bridges, other structures and programme, including preliminarys survey, still shots moving shooting, necessary board for video shooting hiring of vehicle, equipment for video shooting, transportation of all equipment, persons, required for shooting, lighting arrangement as may be necessary, editing, mixing, titling, lettering, sounding including cost of coloured cassette of approved quality etc. complete
1
200000
200000
... More
Book Designing, Publishing and Printing: The work involves printing of a book / guidebook on the fort / monuments and its various aspects, which would provide authentic and precise tourism oriented information. This work involves important photographs of the site, art objects, antiquities, inscriptions etc., which would be useful for educating the masses of the rich cultural heritage of the site, region and state. providing 100 pages coloured books as directed by engineer in charge / ADA
500
325000
650
... More
Carrying out Chemical Analysis of Existing material used in the construction of Monument etc. complete
1
66040
66040