Tapi Irrigation Development Corporation Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Tapi Irrigation Development Corporation Tender
Eprocure
Opening Date30 Jul 2019
Closing Date5 Aug 2019
Tender Amount₹ 13,51,666 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 15,084Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_TIDC_467851_1Bid Award Id
ViewTender No
E Tender No 03 (3rd)Tender Authority
Tapi Irrigation Development Corporation ViewPurchaser Address
-Website
http://mahatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Item No.4 :-Providing casing embankment using selected pervious material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km for watering and lift upto 6 m.
1076
-
61.16
Item No.5 :-Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing etc.,complete with lead upto 50 m and all lifts.
348.15
-
647.33
Item No.6:-Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable rvater with solvent cement joints including cost of couplers, as per IS specification no. 4985 i 1988 excluding GST levied by CCI and GOM in all respect, inciuding transportation, freight charges, inspection charges, Ioading, unloading, conveyance to the departmental stores and stacking the sarne in closed shed duly protected from sun rays and rains including cost of jointing material i.e. solvent cement, etc" complete (selffittype to be jointed with cement solvent).
10
-
771.1
Item No.7:-Royalty Charges of Material
1180.39
-
141.34
Item No 8 :- Insurance on work portion 1%
1
-
4038.21
PART 2- Filling rain cuts on D/S portion of Nagan Medium Project Item No.9:- Cleaning cutting thorny shrubs bushes, grass as directed with 15m lead and lift up to 1.5m.
67270
-
2.12
Item No.10:- Cutting down trees including cutting trunks & branches and stacking the material as directed with 15 mtr. lead and lift up to 1.5 mtr. etc. complete including up roofing and refilling the pit with material as directed (excluding extra material required for refilling). (A) Girth between 30 cm to 60 cm
47
-
216.98
Item No.11:- Providing casing embankment using selected pervious material from approved borrow areas in layers of including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with lead upto1 km & lift upto 6 m.
2836.24
-
132.16
Item No.12:- Royalty Charges
2836.24
-
141.34
Item No 13 :- Insurance on work portion 1%
1
-
5276.48
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements