South East Central Railway Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
South East Central Railway - SECR Tender
Machinery and Tools
Ireps
Opening Date19 Nov 2024
Closing Date13 Dec 2024
Tender Amount₹ 5,34,01,570.79
Costs
EMD
₹ 4,17,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Provision Of Additional Loop Line At Samnapur Station.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
CPM-GSU-18-NGP-2024-25-NAGPUR/SECR/DIVISION-GATI SHAKTI/SOUTH EAST CENTRAL RLYTender No
CPM-GSU-18-NGP-2024-25Tender Authority
South East Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying and linking of turnouts of all types including diamond crossings & Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on prepared ballast bed for New lines or during total closure of section at indicated location as per standard drawing, duly leading sleepers, rails, 4 switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete as directed by Engineer in-charge. 1 in 12 Turnouts
4
49331
197325.68
... More
Laying and linking of turnouts of all types including diamond crossings & Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on prepared ballast bed for New lines or during 5 total closure of section at indicated location as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete as directed by Engineer in-charge. Derailing Switch
1
9504
9504.47
... More
Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM 6 including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge.
3600
25
90936
... More
Loading Railway's ballast, collected at yard / depot into Railway's BOB / BKH / any other type of open wagon, using Mechanical Loader or any other method with all lead and lifts, as directed by Engineer in-charge.
3600
39
143568
... More
Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre- 8 defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms. Under Conditions not requiring Traffic Block:
3600
38
138132
... More
Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. 9 Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully. When distance of nearest quarry is more than 40 km and up to 50 km
3600
1142
4113144
... More
Cutting / cropping of rail of 60Kg - 90 UTS, manually and perfectly vertical with 10 contractor's labour, hacksaw blade and tools & plants - Note: 1.Manual cutting should be used only in emergencies with prior permission of sectional ADEN where machine cutting can not be arranged in time. 2. Cutting of Rails with blade and forcing to part by using other means to break the rails is prohibited. 3.Rails should be cut right through hacksaw blades only. In-situ situation
55
454
25009.6
... More
Manufacturing and Supply of Alumino thermic welding portions of 52Kg/60 Kg/60EI- R260 as approved by RDSO for welding of rails 52Kg/60Kg/60EI-R260 kg for 25mm gap by the process of AT welding along with complete accessories confirming to the specification laid down in Indian 11 Railway Standard specification No.IRST-19-2020 up to date correction slips with Single shot crucible fitted with Automatic Tapping Thimble, 3 pieces pre fabricated mould (Zircon washed) manually pressed using compressed air petrol/LPG pre heating for execution of welding of rail joint as directed by the engineer in charge at site. Note: 1. The accessories along with welding portion shall be supplied as per Annexure-I of the IRUSSOR - 2021. 2. Rate is inclusive of transportation of above to SSE/P.Way stores. For 60Kg 90 UTS Rails
150
2090
313510.5
... More
Spreading of ballast, from existing stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form 12 consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in- charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface.
3600
42
152496
... More
Linking of BG track (except at LC, Bridges and SEJs) with any type of rail section and sleeper of specified density, on ballast bed spread and compacted with suitable roller, over prepared formation including leading free rails/welded panels available along the alignment on to formation, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, 13 placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings tocorrect gauge & alignment, lubrication of fittings and fastenings with contractor's grease as per IRPWM standards with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed in Indian Railway Track Machine Manual for deployment of Tamping Machine. Note: 1.Rail cutting and Hole drilling shall be paid separately. 2.Spreading of ballast and compaction shall be paid separately under relevant item. For sleeper density of 1660 sleepers per km
1600
276
442736
... More
Construction of Sanded Dead End as per RDSO's Drawing no. RT-347 (with all 14 amendments) with brick-work using country bricks or CC bricks in mud mortar and filling with river coarse sand, surrounding rails and filling around. Note: Cost of brick and sand is not included in the rate.
2
10603
21206.32
... More
Working of the Railway Push Trolley by arranging one Head trollyman along with 3 trollymen as per Railway's rules and stipulations for conducting inspections by Railway officials and as 15 directed by Engineer in-charge. Note: 1) Labourers supplied should be of skilled in case of head trollyman and semiskilled in case of trollymen and capable of pushing trolley in all gradients, and levels duly observing all safety precautions as per the manual. 2) The labour engaged should be physically fit for strenuous work, literate and meeting prescribed medical category. For Half day (4 hours)
120
2127
255358.8
... More
Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, 16 unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. In all conditions and classifications of soil except rock
4000
101
407560
... More
Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, 17 unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. Soft rock not requiring blasting
500
238
119060
... More
Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, 18 unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. In hard rock requiring blasting
500
367
183715
... More
Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, 19 mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ2
15816.54
350
5536263.5
... More
EARTH WORK // Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
200
2161
437253.98
... More
CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in 2 position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
100
7226
731078.26
... More
REINFORCED CEMENT CONCRETE // CAST IN SITU // Providing and laying in position 3 specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : // 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources)
350
8364
2961428.65
... More
REINFORCED CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Foundations, footings, bases of columns, etc. for mass concrete
600
307
186913.33
... More
REINFORCED CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
1200
669
812780.14
... More
EARTH WORK // Earth work in excavation by mechanical means (Hydraulic excavator) 6 / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. // All kinds of soil.
400
286
116070.98
... More
REINFORCED CEMENT CONCRETE // STEEL REINFORCEMENT // Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. // Thermo-Mechanically Treated bars of grade Fe-500D or more.
42000
89
3808977.48
... More
CONCRETE WORK // CEMENT CONCRETE (CAST IN SITU) // Providing and laying in 8 position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : // 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
75
7365
558793.93
... More
REINFORCED CEMENT CONCRETE // FORM WORK // Centering and shuttering including strutting, propping etc. and removal of form for // Suspended floors, roofs, landings, balconies and access platform
120
766
93053.04
... More
CONCRETE WORK // CEMENT CONCRETE PRECAST // Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain 10 window sills, shelves, louvers, steps, stair cases, etc., including hoisting and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete. // 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20mm nominal size derived from natural sources)
125
9277
1173171.49
... More
CARRIAGE OF MATERIALS // By Mechanical Transport including loading,unloading and stacking // Earth // 5km 13
5000
271
1372994.1
... More
ROAD WORK // ROADS // Supplying and stacking at site. // Moorum
5000
888
4493021.4
... More
EARTH WORK // Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. // All kinds of soil 1.1.10.5 400.00 Tonne 193.03 77212.00 1.16 78107.66
5000
28
142382.7
... More
CARRIAGE OF MATERIALS // By Mechanical Transport including loading,unloading and stacking // Cement, stone blocks, G.I.. C.I., A.C., & C.C.pipes below 100 mm dia and other heavy materials // 5km
-
-
16
... More
CARRIAGE OF MATERIALS // By Mechanical Transport including loading,unloading and stacking // Cement, stone blocks, G.I.. C.I., A.C., & C.C.pipes below 100 mm dia and other heavy materials // Beyond 5 km upto 10 km per km
2000
13
27839.23
... More
CARRIAGE OF MATERIALS // By Mechanical Transport including loading,unloading and stacking // Steel // Beyond 10 km upto 20 km per km
4000
11
45400.61
... More
CARRIAGE OF MATERIALS // By Mechanical Transport including loading,unloading and stacking // Steel // Beyond 20 km per addl. km
85000
9
778173.3
... More
60kg New Rail 90 UTS 2
149.44
79650
11902896
... More
60kg 1:12 Curve Switch with Fitting (LHS) (T-4219) & CMS Crossing. 3
4
726253
2905013.6
... More
60 kg Normal PSC Sleeper (RT-2496) 4
2500
2484
6210925
... More
ERC MK-III (T-3701) 5
10816
68
737867.52
... More
GRSP Composite/Normal (T-6618) 6
5648
35
201633.6
... More
GFN Liner (T-3706) 7
10120
12
127512
... More
60 kg Normal Fish Plate with Nuts & Bolts (T-5916) 8
40
4236
169448
... More
Cost of glued joints 60 kg (T-2572) 9
30
13238
397152.6
... More
GJ clip/J clip (T-8258) 10
120
72
8659.2
... More
Cost of improved/SEJ complete with fittings 60kg (T-6922) 11
2
156548
313097.4
... More
Cost of SEJ PSC Sleeper (T-4149) 12
12
18269
219235.56
... More
SPL GRPS T-4159 for SEJ
4
2835
11340