South Central Railway Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

South Central Railway - SCR Tender

Works
Civil And Construction
Bridge Construction
Ireps
+2Peddapalli, TelanganaWarangal Urban, Telangana
Opening Date27 Feb 2025
Closing Date21 Mar 2025
Tender Amount₹ 41,10,067.24 
Notes
Download

Costs

Summary

1.trd Modifications In Connection With Provision Of Subways To Facilitate Crossing of Railway Track At Identified Vulnerable Locations Between Pdpl-kzj Stations. 2. trd Modifications In Connection With Provision Of Subways To Facilitate Crossing Of railway Track At Identified Vulnerable Locations Between Asaf-pdpl Stations. 3. trd Modifications In Connection With Provision Of Subways To Facilitate Crossing Of railway Track At Identified Vulnerable Locations Between Bpq-asaf Stations. 4.proposed Trd Modifications In Connection With Replacement Of Existing Steel girders With Psc Slab At Br. No. 318 Dn, 366 Up, 245 Dn And 31dn Of Bpq-kzj section. 5.trd Modifications-provision Towards Trd Modifications In Connection with Proposed 3m Wide Fob At Lingampet Jagityal Station. 6. Proposed replacement Of Existing 2x2.20m Steel Girders With Psc Slabs For Br.no.161(dn) At km 251/26-28 Between Kzj-hsp Stations. 7. Proposed Replacement Of Existing 2x2.20m Steel Girders With Psc Slabs For Br.no.31(up) At Km 348/1-3 Between Hsp- opl Stations.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)

-

-

167652.16

... More
3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station. 3

-

-

6209.9

... More
3(c) Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc 4

-

-

4685.21

... More
3(e)Supply and erection of Guy rod assembly.

-

-

73495.52

... More
4(a)(i)Supply without Insulator and Erection of Single bracket assembly for conventional OHE.

-

-

200129.28

... More
8(a) (v)Supply and erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE.

-

-

268695.84

... More
8(b)(i)Supply without Insulator and erection of material for termination of Single conductor of Overhead equipment or terminating wire. 8

-

-

18686.16

... More
8(a) (xii)Marking of "Y" - Measurement at BWA locations. 9

-

-

624.56

... More
15(a)Supply and erection of all types of copper jumpers. 10

-

-

1958.08

... More
16(a)Supply and erection of structure bonds 11

-

-

4253.76

... More
16(b)Supply and erection of longitudinal bonds 12

-

-

3781.12

... More
16(c)Supply and erection of transverse and special bonds 13

-

-

4591.36

... More
16(aa)Drilling of holes 14

-

-

2700.8

... More
17(a)Supply and erection of Earth electrode. 15

-

-

24307.2

... More
31(a)Transfer of equipment from one mast or support to other. 16

-

-

47601.6

... More
31(k)(i)Dismantlement of OHE mast / structure by cutting. 17

-

-

23632

... More
31(n)Dismantling of guy rod 18

-

-

3814.88

... More
31(r)Dismantling of Cantilever assemblies including insulators. 19

-

-

4177.8

... More
31(s)Dismantling of fabricated steel & SPS

-

-

762.98

... More
31(t)(ii)Dismantling of regulating equipment with counter weight assembly for Conventional OHE

-

-

14348

... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station under power block.

-

-

6209.9

... More
32/4(a)(i)Erection of Single bracket assembly for conventional OHE under power block.

-

-

13368.96

... More
32/8(a) (v)Erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE under power block.

-

-

14348

... More
32/8(b)(i)Erection of material for termination of Single conductor of Overhead equipment or terminating wire under power block. 26

-

-

3308.48

... More
32/15(a)Erection of all types of copper jumpers under power block. 27

-

-

1958.08

... More
32/31(a)Transfer of equipment from one mast or support to other under power block. 28

-

-

47601.6

... More
32/31(k)(i)Dismantlement of OHE mast / structure by cutting under power block. 29

-

-

23632

... More
32/31(n)Dismantling of guy rod under power block. 30

-

-

3814.88

... More
32/31(r)Dismantling of Cantilever assemblies including insulators under power block. 31

-

-

4177.8

... More
32/31(s)Dismantling of fabricated steel & SPS

-

-

762.98

... More
32/31(t)(ii)Dismantling of regulating equipment with counter weight assembly for Conventional OHE under power block. 33

-

-

14348

... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a) 34

-

-

3098.16

... More
40Supply and erection of Number plates on existing masts.

-

-

2025.6

... More
3(a)Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS specifications

-

-

342450.06

... More
3(c) Supply of facricated steel work other than masts, TTC, Portals such as SPS, special fabricated steel etc.

-

-

53046.46

... More
4(ax)(i)Supply of insulators for item 4(a)(i)(iii) 38

-

-

170968.32

... More
8(bx)(i)Supply of insulators for item no 8(b)(i)/(ii)/(iii)/ (v)/(vi)/(vii)/(viii)/(ix)

-

-

30795.84

... More
1Supply of 40mmX6mm MS Flat

-

-

56000

... More
1 Supply and painting to counter weights for the relating OHE

-

-

2176

... More
2 Supply and painting on OHE masts and portals with black lettering on yellow background at each location including paint, brush, labour etc., (ERL,MRL, implantation, structure number {Km./Location}.

-

-

31360

... More
1(a)Preparation of Designs and drawings for OHE. 2

-

-

82087.44

... More
2(a) (i)Concrete for foundations and plinth in hard soil.

-

-

55298.88

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)

-

-

154755.84

... More
3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station. 5

-

-

2372.1

... More
3(b)Erection of fabricated steel work such as TTC, portals etc. 6

-

-

21473.89

... More
3(c) Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc 7

-

-

9760.86

... More
3(e)Supply and erection of Guy rod assembly.

-

-

36747.76

... More
4(a)(i)Supply without Insulator and Erection of Single bracket assembly for conventional OHE.

-

-

100064.64

... More
8(b)(i)Supply without Insulator and erection of material for termination of Single conductor of Overhead equipment or terminating wire.

-

-

18686.16

... More
9(a)Supply withour insulator and erection of anti creep with galvanised steel wire for conventional OHE 11

-

-

49914.16

... More
11(a) (i)Supply with out insulator and erection of 25 kV solid core cut-in insulator.

-

-

8575.04

... More
11(a) (ii)Supply without insulator and erection of 25 kV solid core suspension insulator. 13

-

-

7916.72

... More
15(a)Supply and erection of all types of copper jumpers. 14

-

-

979.04

... More
16(a)Supply and erection of structure bonds 15

-

-

3190.32

... More
16(b)Supply and erection of longitudinal bonds 16

-

-

2363.2

... More
16(c)Supply and erection of transverse and special bonds 17

-

-

2869.6

... More
16(aa)Drilling of holes 18

-

-

3207.2

... More
17(a)Supply and erection of Earth electrode.

-

-

13993.52

... More
31(f)Splicing and extension of Overhead conductors. 21

-

-

9317.76

... More
31(k)(i)Dismantlement of OHE mast / structure by cutting. 22

-

-

5908

... More
31(k)(ii)Dismantlement of upright of TTC / portals by cutting. 23

-

-

16880

... More
31(l)(i)Retrieval of traction masts, main masts, TTC uprights etc. 24

-

-

21100

... More
31(n)Dismantling of guy rod 25

-

-

1907.44

... More
31(r)Dismantling of Cantilever assemblies including insulators. 26

-

-

3342.24

... More
31(s)Dismantling of fabricated steel & SPS 27

-

-

381.49

... More
31(t)(iv)Dismantling of copper jumper

-

-

489.52

... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station under power block.

-

-

2372.1

... More
32/3(b) (i)Erection of fabricated steel work such as TTC, portals etc. under power block.

-

-

21473.89

... More
32/3(b)(ii)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc., under power block.

-

-

9760.86

... More
32/4(a) (i)Erection of Single bracket assembly for conventional OHE under power block.

-

-

6684.48

... More
32/8(b) (i)Erection of material for termination of Single conductor of Overhead equipment or terminating wire under power block.

-

-

3308.48

... More
32/9(a)Erection of anti creep with galvanised steel wire for conventional OHE under power block. 34

-

-

5317.2

... More
32/11(a) (i)Erection of 25 kV solid core cut-in insulator under power block. 35

-

-

2278.8

... More
32/11(a) (ii)Erection of 25 kV solid core suspension insulator under power block. 36

-

-

1367.28

... More
32/15(a)Erection of all types of copper jumpers under power block.

-

-

979.04

... More
32/27(a)Erection, testing and commissioning of 25 kV / 240 volts, 5 / 10/25/50 kVA LT supply transformer under power block

-

-

9950.76

... More
32/28Erection of 25 kV Drop out fuse switch.for all oil/dry type L.T.Supply transformerss of all capacities under power block 39

-

-

970.6

... More
32/31(a)Transfer of equipment from one mast or support to other under power block. 40

-

-

19040.64

... More
32/31(f)Splicing and extension of Overhead conductors under power block. 41

-

-

9317.76

... More
32/31(k)(i)Dismantlement of OHE mast / structure by cutting under power block. 42

-

-

5908

... More
31(k)(ii)Dismantlement of upright of TTC / portals by cutting under power block.

-

-

16880

... More
32/31(n)Dismantling of guy rod under power block. 45

-

-

1907.44

... More
32/31(r)Dismantling of Cantilever assemblies including insulators under power block. 46

-

-

3342.24

... More
32/31(s)Dismantling of fabricated steel & SPS under power block. 47

-

-

381.49

... More
32/31(t)(iv)Dismantling of copper jumper under power block.

-

-

489.52

... More
32/31(t)(viii)Releasing of plinth/pole mounted LT supply transformer under power block 49

-

-

14938.8

... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a) 50

-

-

1183.46

... More
33/3(b)Extra on erection rate for steel work done manually under item No. 3(b)

-

-

10732.3

... More
3(a)Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS specifications

-

-

130811.67

... More
3(b)Supply of fabricated steel work other than masts such as TTC's, portal sets (with all components) etc., as per latest RDSO drawings and IS specifications.

-

-

238550.84

... More
3(c) Supply of facricated steel work other than masts, TTC, Portals such as SPS, special fabricated steel etc.

-

-

110513.45

... More
4(ax)(i)Supply of insulators for item 4(a)(i)(iii) 55

-

-

142473.6

... More
8(bx)(i)Supply of insulators for item no 8(b)(i)/(ii)/(iii)/ (v)/(vi)/(vii)/(viii)/(ix) 56

-

-

15397.92

... More
9(ax)(i)Supply of insulator for item No.(9)(a), (b), (c) 57

-

-

15397.92

... More
11(ax)(i)Supply of insulators for item no 11(a)(i),(ii)

-

-

30795.84

... More
1 Supply of 40mmX6mm MS Flat

-

-

56000

... More
1Supply and painting to counter weights for the relating OHE

-

-

3264

... More
2Supply and painting on OHE masts and portals with black lettering on yellow background at each location including paint, brush, labour etc., (ERL,MRL, implantation, structure mumber {Km./Location}.

-

-

15680

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)

-

-

64481.6

... More
3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station. 3

-

-

5785.62

... More
16(a)Erection of structure bonds 4

-

-

37220.4

... More
16(b)Erection of longitudinal bonds 5

-

-

18905.6

... More
16(c)Erection of transverse and special bonds 6

-

-

28696

... More
16(aa)Drilling of holes 7

-

-

27008

... More
31(a)Transfer of equipment from one mast or support to other. 8

-

-

9520.32

... More
31(k)(i)Dismantlement of OHE mast / structure by cutting.

-

-

11816

... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station. 10

-

-

5785.62

... More
32/31(a)Transfer of equipment from one mast or support to other. 11

-

-

9520.32

... More
32/31(k)(i)Dismantlement of OHE mast / structure by cutting. 12

-

-

11816

... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a)

-

-

2886.48

... More
1 Supply and painting to counter weights for the relating OHE

-

-

544

... More
2 Supply and painting on OHE masts and portals with black lettering on yellow background at each location including paint, brush, labour etc., (ERL,MRL, implantation, structure number {Km./Location}.

-

-

3920

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)

-

-

64481.6

... More
3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.

-

-

5014.2

... More
16(b)Supply and erection of longitudinal bonds 5

-

-

18905.6

... More
16(c)Supply and erection of transverse and special bonds 6

-

-

28696

... More
16(aa)Drilling of holes 7

-

-

27008

... More
31(a)Transfer of equipment from one mast or support to other. 8

-

-

9520.32

... More
31(k)(i)Dismantlement of OHE mast / structure by cutting.

-

-

11816

... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station under power block. 10

-

-

5014.2

... More
32/31(a)Transfer of equipment from one mast or support to other under power block. 11

-

-

9520.32

... More
32/31(k)(i)Dismantlement of OHE mast / structure by cutting under power block. 12

-

-

11816

... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a)

-

-

2501.62

... More
1 Supply and painting to counter weights for the relating OHE

-

-

1088

... More
2 Supply and painting on OHE masts and portals with black lettering on yellow background at each location including paint, brush, labour etc., (ERL,MRL, implantation, structure number {Km./Location}.

-

-

3920



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.