Seepz Special Economic Zone Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Seepz Special Economic Zone - SEEPZ Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date5 Aug 2022
Closing Date24 Aug 2022
Tender Amount₹ 2,10,15,000 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SHORE PILES Mobilization of HYDRAULIC ROTARY RIG MACHINE (minimum torque capacity of 180 KN-M) including drilling equipment,accessories,personnel to site,errection,commissioning and demobilization of the same after completion of work as per specification. Also include labour,hutment and allied equipment ect. All complete. Boring and Constructing Cast - In Situ bored piles in design mix concrete of M30 grade concrete by using Ready Mix concrete with Hydraulic Rotary rig machine , setting out cardinal point ,boring in overburden through whatever strata encountered upto rock all as directed by RCC Consultant and site in charge in soft soil , soft weathered rock ,weathered rock or locally encountered boulders including dewatering, placing concrete by tremie pipe method, compacting of concrete, withdrawal of steel casing, mobilization of rotary rig pile machine and other equipment necessary personal and erecting them ect.complete.On completion of pilling work demobilizing allthe equipment including cleaning and reinstating the site to original condition as acceptable by the site in charge.(Length of pile shall be measured from bottom of pile to cut off level ) 500 mm dia. @ 114 nos .

-

-

-

... More
114 nos.RCC piles - 9.75M length

1100

-

-

... More
Reinforcement Steel - Decoilling , strenghtening , cutting ,bending and placing inposition (lowering) at all levels and binding with approved quality GI binding wire (18 g GI / ms) .Quantity of steel as per structural drawing and including concrete cover blocks ect. complete.(only approved overlaps shall be measured).

64.6

-

-

... More
Removal and disposal of muck generated while pilling .

1

-

-

... More
Chipping of pile above the derive level for tie beam ect.

114

-

-

... More
Carrying out pile integrity test as per applicable IS Codes

30

-

-

... More
CAPPING BEAM Providing,batching, mixing,transporting through transit mixers, pumping and laying controlled REINFORCEMENT CEMENT CONCRETE of specified grade at Capping beam level. As per approved design mix using graded stone aggre-gate of 20mm and down,including plastisizers or retarders (if required),all leads and lifts,pumping using line pump or boom placer, mechanical mixing, Vibrating,scaffolding wherever necessary consolidation, finishing, curing,dewatering in all season etc. at all heights & levels all as per drawings, specifications as directed complete.(Excluding cost of all formwork ). (note : Cement concrete work: Concrete cast in-situ : Plain and reinforced Precast concrete : Plain and reinforced Prestressed concrete : Cast in-situ or pre-cast All these will have higher recycled content in it* Only PPC shall be used. Minimum 15% utilisation of fly ash by weight of cement. Material Certificate require from the manufacturar.)

-

-

-

... More
(i) In capping beam as indicated:M-30

20

-

-

... More
Plywood shuttering shall be considered for all horizonatl & vertical elements,beam soffit,corewalls, stairs,ramps,tanks,RCCpedestals Etc., (i)Capping beam

80

-

-

... More
Providing and fixing in position high yield strength deformed bar reinforcement with yield stress not less than Fe 500 D of various diameters for RCC capping beams. As per detailed design and drawing schedule including cutting, bending,hooking the bars, binding with 18 SWG GI wires including supporting as required and providing approved PVC cover blocks at all levels including all leads and lifts and all wastages etc.complete.

1.4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.