Seepz Special Economic Zone Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Seepz Special Economic Zone - SEEPZ Tender
Civil And Construction
Building Construction
Eprocure
Opening Date12 Jul 2023
Closing Date22 Jul 2023
Tender AmountRefer Documents
Costs
EMD
₹ 3,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SEEPZ_761383_1Bid Award Id
ViewTender No
E-OPT-11/162/2022-EOTender Authority
Seepz Special Economic Zone ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
REPAIR RENOVATION WORKS OF ROOM NO 24 BUILDING No B2 LOCATED SEEPZ STAFF COLONY ANDHERI EAST MUMBAI 400096
BOQ Items
REMOVAL OF THE DEBRIS:
Lowering down the debris obtained from breaking and removing the cement plaster/waterproofing, RCC, etc. by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site and carting away the same outside the building compound upto the municipal dump with all lead and lift complete as per the direction of Consulting Engineer / in-charge complete.
2
-
-
STRUCTURAL REPAIR, CIVIL REPAIR & CARPENTARY WORKS
-
-
-
STRUCTURE REPAIR WITH POLYMER BY FOLLOWING PROCESS: 1) Rust Remover
Brushing with wire rush and removing all rust scales from rebars & washing with water as required and providing and applying Rust Remover on existing exposed reinforcement bars
2) R.I. Coat
Providing and applying Rust Inhibition Coat / system to exposed rebars & also new rebars complete.
3) Bond coat
Providing and applying raw Polymer Bond Coat / system to all exposed concrete surface and rebars prior to polymer treatment complete.
4) P.M.M.
Providing and applying Polymer modified mortar in ratio 1:5:15 (1 part by weight of polymer: 5 parts by weight of cement: 15 parts by weight of Quartz sand) up to 25 mm thickness all complete as per the direction of Consulting Engineer / in- charge.
If thickness more than 25mm arrived then 2nd layer polymer needs to apply, after approval of consulting engineer Consulting Engineer / in-charge. For second layer rate considered 75% of quoted rate of entire polymer repair item.
10
-
-
INTERNAL PLASTER : - Providing internal 12mm thick Internal plaster confirming to IS:4031 (Part-4) 1988 and IS:383-1970 in a single coat using Cement mortar of proportion 1:4 containing special type of polymer additives about 0.4%, to all type of surfaces in all positions including scaffolding and racking out joints, hacking of concrete surface, watering, finishing, curing, scaffolding etc. complete.
40
-
-
DOOR & WINDOW FRAME:-
Providing and fixing machine cut machine polished 18 mm to 20 mm thick telephone black / Amba White / Cadbury brown / RBI red / Ocean Brown granite stone for treads and risers of steps and staircases of approved colour and shade with full moulding and three grooved line for the treads on bed of 1:4 Cement mortar including float filling joints with neat cement slurry curing polishing and cleaning etc. complete.
6
-
-
NEW FRP DOOR SHUTTERS:-
Providing and fixing fibre glass reinforced polyester door shutter 35 mm thick as per IS 14856 (2000) (Reaffirmed 2006) without ventilator including chromium plated fixtures and fastening with chromium plated handles on both sides, and other required fixture etc. complete.
7
-
-
NEW SHUTTERS OF KITCHEN TABLE & CUPBOARD:-
Providing and fixing shutter to wall cupboard made from 19 mm thick Teak particle board with approved coloured laminated face 1.5mm thick bonded with phenol formaldehyde synthetic resin B.W.P. grade including lipping beading iron oxidised fixtures and fastening and oil primer coat etc. complete along with required fitting to make shutters of kitchen table and cupboard. (Excluding cupboard frame).
5.5
-
-
PAINTING WORK
-
-
-
FLOORING COVERING DURING PAINTING:
Providing and covering entire flooring area during painting by mean of tarpaulin OR Jute Bardan to avoid paint stains & damages to the flooring and removing the same after completion of painting, etc complete.
45
-
-
WALL CARE PUTTY ON WALL & CEILING:
Providing and applying Two coats of wall care Putty of required thickness as per the site conditions on entire painting surface of Ceiling and Walls to prepare surface even and smooth of approved make, etc complete.
190
-
-
INTERNAL PRIMER:
Providing and applying priming coat on concrete/masonary/Asbestos Cement/plastered surfaces including scaffolding if necessary, preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and sand papering as required etc.complete.
190
-
-
INTERNAL PEARL/LUSTER PAINT:
Providing and applying pearl/luster finish paint of approved colour and shade to the existing plaster surface in two coats 1st coat with brush/rubber/spray with mineral turpentine 7 to 9%and Oil with roller 19 to 21%After 8 hours of activity Applying 2nd coat of wall finish Lustre with mineral turpentine 7 to 9% with brush and Oil with roller 19 to 21%after allowing dry for the period of 6 to 8 hours activity including scaffolding, preparing the surface. (excluding primer coat) etc. complete.
190
-
-
PRIMER FOR OIL PAINTING:
Providing and applying priming coat on old/new wood & wooden surfaces including scaffolding if necessary, preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter and sand papering as required etc.complete.
21
-
-
OIL PAINT (DOORS):
Providing and applying two coats of lead/zinc base oil paint/bituminious paint of approved colour and shade to old wood work and fiber boards previously painted including if necessary scaffolding, preparing the surface excluding priming coat etc. complete.
21
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements