Rural Development Department Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Rural Development Department - RDD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Feb 2025
Closing Date22 Feb 2025
Tender Amount₹ 8,86,867
Costs
EMD
₹ 8,869Document Cost
₹ 590Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RDPUN_1143758_23Tender No
ZP/PUNE/RWS/E-Tender/ 19 /2024-25Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://rdd.maharashtra.gov.in/en
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Item No.2 :- Excavation for foundation / pipe trenches in earth , soils of all types , sand , gravel , soft murum , hard murum , hard murum and boulders , including removing the excavated material upto a distance of 50 mtrs. beyond the area and lifts as below , stacking as directed by Engineer - in - charge , normal dewatering , excluding backfilling , etc. complete by all means.
152.82
206
31546.63
... More
Item No.3 :- Excavation for foundation / pipe trenches in earth , soils of all types , sand , gravel , soft murum , hard murum , hard murum and boulders , including removing the excavated material upto a distance of 50 mtrs. beyond the area and lifts as below , stacking as directed by Engineer - in - charge , normal dewatering , excluding backfilling , etc. complete by all means.
99.06
945
93674.11
... More
Item No.4 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction , etc. complete.
25.65
101
2595.78
... More
Item No.5 :- Lowering , laying and jointing in proper grade and alignment RCC pipes with collar joints in CM 1:1 proportion or socketed RCC pipes with rubber joints ( excluding cost of rubber ring or RCC collar ) , including cost of conveyance from stores to site of works , cost of jointing material , labour , giving hydraulic testing , etc. complete as directed by Engineer - in - charge as per IS 783-1985. 600 mm dia. RCC NP II class pipe
160
546
87472
... More
450 mm dia. RCC NP II class pipe
10
398
3982
... More
300 mm dia. RCC NP II class pipe
20
250
5016
... More
Item No.6 :- Providing and constructing B.B.
masonry circular manhole chamber without conical shape excluding excavation,RCC1:2:4 proportion,20 cm bedding brick masonry in CM1:4proportion,23cmthickfor2Mdepthfromtop, etc. complete as directed by Engineer - in - charge. Chamber of 1M Depth
2
18494
36988
... More
Chamber size 60 X 45 CM
20
8125
162500
... More
Item No. 7 :- Providing and laying in situ cement concrete M-150 of trap / granite / qurtzite / gneiss metal for foundation and bedding including bailing out water , form work , compaction , curing , etc. complete. PCC M - 150
21
6469
135851.1
... More
Item No. 8:- Refilling the trenches with available excavated stuff with soft material first over pipe line and then hard material in 15 cm layers with all leads and lifts including consolidation , surcharging , etc. complete .
151.2
101
15301.44
... More
Filling in plinth and floors / trenches with contractor's murum for bedding in 15 cm to 20 cm layers including watering and compaction,etc complete
20
1003
20060