Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Rural Development Department - RDD Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date12 Sep 2024
Closing Date19 Sep 2024
Tender Amount₹ 5,54,433
Costs
EMD
0Document Cost
₹ 1,000Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SOLAP_1083369_27Bid Award Id
ViewTender No
02/2024-25Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://rdd.maharashtra.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item No. 4 : Providing hearting embankment using selected impervious soil from approved borrow areas in layers including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
-
-
-
... More
Including Watering & Consolidation By Other Than Mechanical Means .
807
111406
138.05
... More
Item No. 5 : Providing casing embankment using selected pervious material available directly from excavation , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, including watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor / excluding compaction etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
-
-
-
... More
A ) Top Shrunked Portion
-
-
-
... More
Including Watering & Compaction with vibratory compacter
124
9567
77.15
... More
Item No. 6 : Providing casing embankment using selected pervious material from approved borrow areas , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .
-
-
-
... More
Top Shrunked Portion - Including Watering & Compaction with vibratory compacter
99
18033
182.15
... More
U/S Berm & D/S Resectioning Including Watering & Consolidation By Other Than Mechanical Means .
469
80434
171.5
... More
Item No. 7 : Providing and constructing 200 mm thick dry rubble stone pitching using stones and stone chips from locally available, excavated materials including labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. Including 1 % Cess for labour welfare etc. complete .
757
34330
45.35
... More
Item No.8 : Providing and constructing 230 mm thick dry rubble stone pitching using stones and stone chips from approved source from borrow area including cost of all materials, labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. including 1 % Cess for labour welfare etc. complete .
644
128285
199.2
... More
Item No 9 : Providing and fixing information board of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with angle iron frame of size 35 X 35 X 3 mm with cross bracing of size 25 X 25 X 3 mm including painting with one coat of zinc chromate storing primer and two coats each of green/white back ground and back side grey store enameled bonded with red retro reflective sheet Engineering grade, border / letters / numeral / arrows coated with non pealable crystal clear protective transparent coat retaining 100% reflection including two angle iron post of size 50X50X5 mm of 3.65 m long inflated at bottom drilled on top and painted in white and black bonds of 30 cm with four numbers high strength of G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete in M-15 block of size 60 X 60 X 75 cm as directed by engineer-in-charge including 1 % Cess for labour welfare etc. complete .
1
6547
6547.25
... More
Item No.10 : Royalty Charges For Construction Material
-
-
-
... More
For Other Mineral
158.62
34302
216.25
... More
Item No.11 : 1 % Cess For Insurance
1
4659
4659
... More
Item No.12 : CGST 9 %
1
41932
41932
... More
Item No.13 : SGST 9 %
1
41932
41932