Rural Development Department Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Rural Development Department - RDD Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date15 Feb 2025
Closing Soon1 Mar 2025
Tender Amount₹ 15,75,721
Costs
EMD
₹ 15,757Document Cost
₹ 5,700Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_JALGA_1150355_2Tender No
ZP/Jalgaon/02/TSP/OTSP/2025Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://rdd.maharashtra.gov.in/en
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item No. 4:-
Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.
700
165
115500
... More
Item No.5:-
Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete.
612.5
211
129237.5
... More
Item No.6:-
Excavation for foundation / pipe trenches by blasting in soft rock and old cement and lime masonry foundition asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.
262.5
629
165112.5
... More
Item No.7:-
Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete.
262.5
92
24150
... More
Item No. 8:-
Lowering, laying and jointing with P.V.C. pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, rubber ring, as per IS code, etc. complete (with cement solvent joint / ring fit joint).
90 mm pvc 4 kg pipe
2500
35
87500
... More
Item No.09:-
Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and excluding hydraulic testing etc. complete. (Rate for all class of valves.) Sluice valves PN - 1 --80 mm dia.
6
1947
11682
... More
Item No. 10:-
Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite /gneiss metal for foundation and bedding including bailing out water, form work,compaction, curing, etc. complete. (Cement 5.90 bags / cum) PCC (M 150) for levelling course PCC (M 150) for levelling course
80.55
5881
473714.55
... More
Item No. 11:-
Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete.
1216.05
92
111876.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%