Rural Development Department Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Rural Development Department - RDD Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date13 Feb 2025
Closing Date21 Feb 2025
Tender Amount₹ 2,88,545
Costs
EMD
₹ 2,885Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HINGO_1149606_3Tender No
Open/EE/RWS/jjm/Elect/13/24-25Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://rdd.maharashtra.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M.S.Channel 75x40x6 mm
44
69
3076.92
... More
MS angle 50x50x6 mm
22
69
1538.46
... More
M.S.Flat 50 x 6 mm
24
65
1571.52
... More
11 kV Pin Insulators with G.I. Pins
3
108
325.98
... More
Strain Hardware for Dog0.1 or Equ.AAAC.
3
369
1109.73
... More
L.T.Dist.Boxes 25/63 KVA with MCCB
1
13497
13497
... More
L.As. 11 KV (Gapless type) with disconector
1
1458
1458.2
... More
H.T.Stay Set
4
807
3229.2
... More
G.I.Stay Wire 7/4mm(8 SWG)
25
71
1795.25
... More
Earthing Sets H.T
3
461
1385.1
... More
11KV H.G.Fuses
1
2356
2356.8
... More
11KV A.B. Switch, 400 A
1
11088
11088
... More
Danger Board in yard.
2
57
115
... More
G.I.Wire 8 SWG/ 6 SWG
25
71
1793.75
... More
G.I.Barbed Wire `A' type.
15
80
1205.1
... More
Concreting ration 1:3:6
2
3935
7870.2
... More
Painting/Hardware & support with numbering of pole
1
258
258.75
... More
DTC Metring with Box, single core L.T. XLPE cable (16 sq.mm., 120 mtr length) and other allied material.
1
13303
13303.92
... More
Sundries
1
885
885.5
... More
(Part A II ) PSC Pole 9 Mtr (200 KG)
5
2712
13560
... More
11 kv guarding channel MS 75x40
29
69
2027.97
... More
M.S.Channel 75x40x6 mm
34
69
2377.62
... More
MS angle 50x50x6 mm
20
69
1398.6
... More
11 KV V cross arm with clamp
3
862
2587.95
... More
11 KV Top fitting with clamp
3
122
368.55
... More
M.S. Flats(50 X 10mm)
11
65
720.28
... More
11 kV Pin Insulators with G.I. Pins
12
108
1303.92
... More
Disc Insulator 11 KV 70 KN
6
310
1860.06
... More
Strain Hardware for 55 Sq.mm AAAC
6
161
966
... More
AAAC 55 mm2
875
34
30222.5
... More
Sleve Joints
1
132
132.25
... More
H.T.Stay Set
2
807
1614.6
... More
G.I.Stay Wire 7/4mm(8 SWG)
20
71
1436.2
... More
Earthing Sets H.T
5
461
2308.5
... More
G.I.Barbed Wire `A' type.
20
80
1606.8
... More
Danger Board in yard.
5
57
287.5
... More
Concreting ration 1:3:6
5
3935
19675.5
... More
G.I.Wire 8 SWG/ 6 SWG
36
71
2583
... More
Black Bituminus Paint
2
97
195.5
... More
Red Oxide Paint for 2 coats
6
97
586.5
... More
Aluminium Paint for 1 coat
3
129
389.85
... More
G.I.Nut Bolts
25
111
2798
... More
Sundries
0.28
885
247.94
... More
Wedge connectors
0.1
-
0.01
... More
RABIT To RABIT or equivalent AAAC
7
131
918.61
... More
Erection cost on Material (15% Total Cost of Material)
1
37636
37636.32
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements