Rural Development Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Rural Development Department - RDD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date14 Sep 2024
Closing Date21 Sep 2024
Tender Amount₹ 40,80,598 
Notes
Download

Costs

  • EMD

    ₹ 50,000
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 500

Summary

Stbt To Road At Shirgaon Sheti Farm Towards Tiwandewadi Road Vr 137 Tal.ratnagiri

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No: 4) Spreading gravel,/hard murum/soft murum & stone dust over the rubble soling, oversize and size metal layer/ blandage on W.B.M. surface etc. complete. SSR 105/2.3

130.56

10314

79

... More
Item No:5) Compacting the 80 mm laterite metal layer upto 2.00m width with power roller, including necessary labour, materials and artificial watering etc. complete. Rate as per Rate as per जा.क्र.आरटीएन/PWD/DB/जन/दरसुची/सी-१५६/21/3894दि. १8/१०/२०२1

3264

65280

20

... More
Item No:6) Providing and constructing 50 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 100% crusher broken metal with conical crusher palnt, heating and spraying the bitumen of specified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with Static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, Including picking of existing WBM surface.. (VG-30 bulk bitumen rates are considered to arrive at rates) R.A.No 3

6528

1752717

268.49

... More
Item No.7:- Providing 20 mm thick premix bituminous carpet including supplying all materials, preparing and cleaning the base, heating bitumen applying tack coat at specified rate, mixing hot bitumen and chips laying the carpet layer and compacting etc complete R.A.No.4

6528

1217454

186.5

... More
Item No 8- Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. R.A.No.5

6528

544975

83.48

... More
Item No.09:- Providing and fixing name board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc',complete

1

7814

7814

... More
Item No.10:- Royalty Charges of Material

1

-

-

... More
80 mm Laterite Metal Royalty + surcharge (2%) = 211.95+4.23 = 216.18 per cum

261.12

56448

216.18

... More
Murum Royalty + surcharge (2%) = 211.95+4.23 = 216.18 per cum

130.56

28224

216.18

... More
Item No.11 :- Payment of testing charges if contractor produced authourised results

1

-

-

... More
BITUMEN a) Penetration, Softening Point, Flash & Fire Point, Specific Gravity

1

3290

3290

... More
AGGREGATE b) Sieve Analysis

1

725

725



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.