Rural Development Department Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Rural Development Department - RDD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Feb 2025
Closing Date10 Mar 2025
Tender Amount₹ 3,23,72,679 
Notes
Download

AI Insights

Bid Capacity
... View More
The bid capacity required is 1% of the tender value. Formulas for calculating price variations for each component are provided, including: 1. Labour Component: Vi = 0.85P [ K1 X L1 - L0 ] / 100 L0 2. Material Component: V2 = 0.85P [ K2 X M1 - M0 ] / 100 M0 3. POL Component: V3 = 0.85P [ K3 X P1 - P0 ] / 100 P0 4. Bitumen Component: V4 = QB ( B1 - Ba ) 5. HYSD and Mild Steel Component: V5 = S0 ( Sl1 - Sl0 ) X T / Sl0 The components and their respective percentages of the total cost of work are: 1. Labour Component - 33% 2. Material Component - 65% 3. POL Component - 2% 4. Bitumen Component - Actual 5. HYSD & Mild Steel Component - Actual 6. Cement Component - Actual 7. C.I. and D.I. Pipes Component - Actual The earnest money deposit (EMD) or bank guarantee should be valid for the bid validity period plus 30 days.
Technical Capacity
... View More
Every un-registered contractor should furnish along with the tender a statement showing previous experience and technical staff employed by him in the form of statement No.IV. No specific information is available regarding the required value and percentage of similar works completed.

Costs

  • EMD

    ₹ 1,61,863
  • Document Cost

    ₹ 2,360
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means

111.22

264

29401.01

... More
Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means

50.21

1371

68840.42

... More
Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.

120.43

1872

225463.02

... More
Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 10.0 to 19.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary)

10

233

2339.5

... More
Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete.

592.87

880

522051.68

... More
Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)

135.31

6560

887701.26

... More
( Ground Floor )

8.79

7101

62420.43

... More
( First Floor )

8.4

7164

60185.16

... More
( Second Floor )

4.63

7164

33173.49

... More
( Ground Floor )

133.42

8067

1076359.18

... More
( Ground Floor )

48.99

15074

738512

... More
( First Floor )

27.32

15214

415658.77

... More
( Second Floor )

9.68

15214

147275.88

... More
( Ground Floor )

71.13

13485

959227.17

... More
( First Floor )

34.66

13610

471724.33

... More
( Second Floor )

2.58

13610

35113.93

... More
( Ground Floor )

81.33

15231

1238741.3

... More
( First Floor )

57.95

15372

890818.99

... More
( Second Floor )

10.35

15372

159102.27

... More
( Ground Floor )

20

416

8329

... More
( First Floor )

15

416

6246.75

... More
( Ground Floor )

10.8

16945

183007.62

... More
( First Floor )

0.9

17102

15392.39

... More
( Second Floor )

8.62

17102

147424.84

... More
( Ground Floor )

3.07

13267

40730.76

... More
( First Floor )

3.07

13389

41106.69

... More
( Ground Floor )

2.52

15231

38382.25

... More
( First Floor )

2.03

15372

31205.57

... More
( Ground Floor )

29.7

94218

2798287.97

... More
( First Floor )

14.54

95115

1382979.37

... More
( Second Floor )

3.79

95115

360487.75

... More
( Ground Floor )

602.12

59

36006.78

... More
( First Floor )

548.84

60

33122.49

... More
( Second Floor )

50.08

60

3022.33

... More
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper.

1591.14

112

178605.47

... More
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper.

490.61

113

55586.11

... More
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per One Square Metre of vertical surface area covering 10 years guarantee on bond paper.

849.21

117

99782.18

... More
( Ground Floor )

30.3

184

5593.38

... More
Providing fly ash brick masonry with conventional / I.S. type fly ash bricks in C.M. 1:6 in foundation and plinth including bailing out water manually striking joints, racking out joints watering and scaffolding etc. complete.

9.07

7622

69137.44

... More
( Ground Floor )

156.69

7855

1230878.3

... More
( First Floor )

150.44

7926

1192470.18

... More
( Second Floor )

43.33

7926

343457.41

... More
( Ground Floor )

72.28

1076

77791.35

... More
( First Floor )

40.95

1086

44494.22

... More
( Ground Floor )

7.25

8787

63705.75

... More
( First Floor )

7.25

8866

64285.39

... More
( Ground Floor )

36.18

75

2740.64

... More
( First Floor )

33.57

76

2568.11

... More
( Ground Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

15

214

3219.75

... More
( First Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

15

216

3250.5

... More
( Ground Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

1322.79

306

405699.69

... More
( First Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

955.55

309

295838.28

... More
( Ground Floor )

10.35

802

8305.88

... More
( First Floor )

10.35

810

8385.05

... More
( Ground Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

15

406

6093.75

... More
( First Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

15

410

6150.75

... More
( Ground Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

486

677

329386.5

... More
( First Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

338.93

684

231878.96

... More
( Second Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

353.49

684

241837.45

... More
( Ground Floor )

408.48

658

269086.2

... More
( Ground Floor )

101.18

51

5200.65

... More
( First Floor )

97.61

51

5065.96

... More
( Ground Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

250.36

54

13744.76

... More
( First Floor )( With Sand - V.S.I.(Vertical Shaft Impact Crusher)Quality Artifitial Sand usded. )

195.22

55

10815.19

... More
( Ground Floor )

37.5

1285

48211.88

... More
( First Floor )

177.85

1297

230707.02

... More
( Second Floor )

10.35

1297

13426.02

... More
( Ground Floor )

32.15

1607

51666.66

... More
( First Floor )

24.42

1622

39619.01

... More
( Ground Floor )

207.99

1684

350369.55

... More
( First Floor )

160.63

1700

273159.35

... More
( Ground Floor )

12

1320

15844.8

... More
( First Floor )

12

1332

15994.8

... More
( Ground Floor )

190.63

4229

806183.8

... More
( First Floor )

94.78

4269

404639.52

... More
( Ground Floor )

1.5

1323

1985.48

... More
( First Floor )

25

1336

33403.75

... More
( Ground Floor )

1.5

156

234.45

... More
( First Floor )

25

157

3945

... More
( Ground Floor )

95.22

4607

438769

... More
( First Floor )

59.87

4651

278503.27

... More
( Ground Floor )

56.75

4384

248809.03

... More
( First Floor )

28.4

4426

125698.4

... More
( Ground Floor )

247.38

755

186846.11

... More
( First Floor )

123.18

762

93924.75

... More
( Ground Floor )

32.15

1284

41298.28

... More
( First Floor )

24.42

1296

31661.75

... More
( Ground Floor )

886.99

1467

1301702.17

... More
( First Floor )

588.48

1481

871803.7

... More
( Ground Floor )

170.13

9019

1534453.51

... More
( Ground Floor )

547.41

309

169396.02

... More
( First Floor )

338.93

312

105881.73

... More
( Second Floor )

352.97

312

110267.83

... More
( Ground Floor )

917.62

94

86623.33

... More
( First Floor )

654.35

95

62359.56

... More
( Ground Floor )

917.62

226

207886.81

... More
( First Floor )

654.35

228

149682.56

... More
( Ground Floor )

22.43

148

3340.95

... More
( Ground Floor )

3.6

100

362.52

... More
( First Floor )

3.6

101

365.94

... More
( Ground Floor )

6.39

10308

65871.32

... More
( Ground Floor )

22.3

1279

28539.54

... More
( First Floor )

14.8

1292

19121.6

... More
( Ground Floor )

27.66

4934

136488.27

... More
( First Floor )

6.6

4981

32878.23

... More
( Ground Floor )

43.56

2693

117344.11

... More
( First Floor )

33.12

2719

90069.84

... More
( Ground Floor )

43.96

1855

81576.57

... More
( First Floor )

37.76

1873

70737.7

... More
( Ground Floor )

19.44

3229

62788.28

... More
( First Floor )

15.12

3260

49301.03

... More
( Ground Floor )

11.52

3251

37461.89

... More
( First Floor )

8.64

3282

28364.26

... More
( Ground Floor )

25.2

3434

86548.14

... More
( First Floor )

16.2

3467

56167.83

... More
( Ground Floor )

60.3

5211

314250.44

... More
( First Floor )

55.95

5261

294358.55

... More
( Ground Floor )

7.02

9684

67984.14

... More
( First Floor )

3.24

9776

31676.51

... More
( Ground Floor )

67.32

1790

120546.56

... More
( First Floor )

59.19

1807

106997.76

... More
( Ground Floor )

2.88

9116

26256.53

... More
( First Floor )

2.88

9203

26506.8

... More
( Ground Floor )

10.35

4244

43927.99

... More
( First Floor )

10.35

4284

44346.65

... More
Providing and fixing 90 cm x 60 cm Granite plate engraving 10 cm. Height letter, figures including painting the lefters/figures with approved colour and shade complete

1

9049

9049.7

... More
Providing and fixing board displaying information, such as "Name of work, Tender cost, Name of Contractor, Work completion and liability period etc", having rectangular shape of 1.80m x 1.20m size made up of 4 mm aluminum composite pannel sheet with 0.5 mm skin thickness on either side bonded with white retro reflective sheeting of Class B (Type IV High intensity micro-prismatic grade sheeting-HIP) having pressure sensitive adhesive. Retro reflective sheeting with specified background, border and back side reto reflective symbols, letters, numerals, arrow as per IRC: 67-2012 Table No 8.3, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Class B (Type IV High intensity micro-prismatic grade sheeting-HIP) shall have 7 years written warranty from the manufacturer including the Digitally Printed areas with approved printing technology with sheeting manufacturer approved inks and laminated with UV overlay film and this warranty certificate in original should be submitted to the Engineer in charge by the contractor/supplier.

1

25816

25816.95

... More
( Ground Floor )

0.1

124730

12473.07

... More
( First Floor )

0.2

125918

25183.72

... More
( Ground Floor )

0.3

106954

32086.31

... More
( First Floor )

0.1

107972

10797.28

... More
( Ground Floor )

7.2

4207

30294.36

... More
( First Floor )

2.88

4247

12233.23

... More
( Ground Floor )

2.88

3417

9842.83

... More
( First Floor )

1.08

3450

3726.22

... More
( Ground Floor )

13.5

3511

47398.5

... More
( First Floor )

14.25

3544

50508.41

... More
( First Floor )

6

1194

7167.3

... More
( Ground Floor )

1

20455

20455.5

... More
( First Floor )

1

20650

20650.5

... More
( First Floor )

51.44

4205

216320.63

... More
( Ground Floor )

10.8

3346

36140.04

... More
( Ground Floor )

40

279

11162

... More
( First Floor )

40

279

11162

... More
( Ground Floor )

40

325

13008

... More
( First Floor )

40

325

13008

... More
( Ground Floor )

5

393

1967

... More
( First Floor )

5

393

1967

... More
( Ground Floor )

30

565

16962

... More
( Ground Floor )

2

1269

2538.6

... More
( Ground Floor )

5

510

2554.25

... More
( First Floor )

7000

11

80850

... More
( Ground Floor )

10

1185

11858

... More
( First Floor )

8

1185

9486.4

... More
( Ground Floor )

9

6035

54317.7

... More
( First Floor )

3

6035

18105.9

... More
( Ground Floor )

3

4210

12630.6

... More
( First Floor )

3

4210

12630.6

... More
( Ground Floor )

7

11760

82324.9

... More
( First Floor )

3

11760

35282.1

... More
( Ground Floor )

10

313

3136.5

... More
( First Floor )

2

313

627.3

... More
( Ground Floor )

10

903

9032

... More
( First Floor )

2

903

1806.4

... More
( Ground Floor )

6

602

3615.3

... More
( First Floor )

2

602

1205.1

... More
( Ground Floor )

60

636

38205

... More
( First Floor )

15

636

9551.25

... More
( Ground Floor )

20

343

6860

... More
( Ground Floor )

20

532

10658

... More
( Ground Floor )

23

1553

35731.65

... More
( First Floor )

15

1553

23303.25

... More
( Ground Floor )

6

2830

16981.2

... More
Providing soak pit of size 120cm x 120cm x 120cm including excavating and filling with brick-bats.

2

3096

6193.3

... More
Providing and laying concrete pipes of I.S.NP. class of 300mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete.

20

780

15609

... More
Providing and constructing Brick Masonry Inspection Chamber 60cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W. pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140Kilogramwith frame etc complete.

10

10003

100030

... More
Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W.pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140Kilogramwith frame etc complete.

5

11904

59524.5

... More
( Ground Floor )

2

1704

3409.2

... More
( First Floor )

2

1704

3409.2

... More
( Ground Floor )

15

1017

15263.25

... More
( First Floor )

8

1017

8140.4

... More
( Ground Floor )

1

54023

54023.5

... More
( Ground Floor )

1

95773

95773.7

... More
( Ground Floor )

75

436

32730

... More
( Ground Floor )

10.8

7872

85023

... More
( Ground Floor )

1.51

14878

22466.91

... More
( Ground Floor )

2.98

13290

39605.84

... More
( Ground Floor )

7.45

7699

57362.39

... More
Providing and fixing heavy duty inter locking concrete Rubber mould glossy paving blocks of 80 mm thickness of having a strength of 400 Kilogram/Sq.cm. of approved quality and shape on a bed of crushed sand of 25 to 30 mm thick including skirting joints and cleaning etc. complete. (using 100% crushed sand)

98

1499

146946.1

... More
Stamp Concrete of 100mm Thickness - Providing and Laying in-situ M30 Grade unreinforced plain cement stamp concrete of 100mm thickness pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate (natural sand / VSI grade finely washed crushed sand) Confirming to IS 383, as per mixed in a batching and mixing plant / non tilting mixer and weigh batcher as per approved mix design, admixtures, transporting to site in nagpur city with lead upto 20KM (on Inner Ring Road from Avasti nagar to wadi), spreading, laying with approved make pover, compacted and finished in a continous operation, finishing to lines and grades Also Providing, Placing and applying stamp powder which is light fast UV resistant pigment with appropriate chemical compounds of desired colour on base concrete after excess bleed water has evaporated using dry shake method @5kg per sqm. Including texturing, and covering with plastic sheet (min 200 micron thickness) and also applying two coats of UV-stable,30 % solids clear sealer @ 150 to 250 gms per sqm using surface roller and protecting from falling dust,dirt and curring by curring compound / by providing cement vata in cement Mortor 1 :8 @ 0.6m x 0.6m center to center, admeasuring 80mm at bottom and 40mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-incharge or Landscape architect etc. complete. (prior approval of superinteding Engineer will be necessary )

52

1729

89949.6

... More
Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. By Manual Means. ( Item used only when Quantity is below 10 Cu.m.)

18

314

5664.6

... More
Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed.

9

204

1840.95

... More
Supplying hard murum/ kankar at the road site, including conveying and stacking complete.

9

708

6376.95

... More
Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete.

9

22

198.45

... More
Spreading hard murum/ soft murrum/ gravel or kankar for side width complete

18

82

1491.3

... More
Providing dry rubble stone pitching 23 cm (about 9 ) thick including all material, quarry spalls, labour etc. complete.

3.6

542

1951.74

... More
Providing and laying in situ cement concrete M -30 with tremix treatment for 200 mm thickness for Concrete Road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20 mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) etc. complete with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete.

3.6

9288

33439.14

... More
Providing and casting in situ or precast tapering R.C.C. M-20 Semi Barrier type Kerb without gutter ( as per IRC 86 1983) embedded 125mm below ground level over M-10 PCC finished neatly with C.M. 1:2, setting the same in C.M. 1:2, including the required excavation in any strata and removing the excavated stuff any where in city and redoing the surface as specified and directed by Engineering In-charge. Using Concrete Batching and Mixing Plant

10

544

5444.5

... More
Providing and Constructing gabion structure 1 Meter high or required section made up of soft mechanically woven hexagonal shaped G.I. wire confirming to IS 16014:2012 having zinc plus PVC coating of overall diameter of 3.7 mm and tying lacing wire of 3.2 mm with edge wire confirming to overall diameter 4.4 mm edges being mechanically selvedge including placing in position, fitting neatly with trap stone rubble (15 to 23 cm) all loose ends to be securely tied (Excluding transportation) etc. complete. ( In Dry condition and for under water installation extra cost to be considered)

5

4520

22600.75

... More
( Ground Floor )

18

605

10890

... More
( Ground Floor )

30

569

17070

... More
( Ground Floor )

15

413

6195

... More
( Ground Floor )

12

811

9732

... More
( Ground Floor )

8.1

85

688.5

... More
( Ground Floor )

18

43

777.6

... More
( Ground Floor )

17.1

665

11371.5

... More
( Ground Floor )

17.1

775

13252.5

... More
( Ground Floor )

60

878

52707

... More
( Ground Floor )

60

1230

73830

... More
( Ground Floor )

4

18940

75763

... More
( First Floor )

4

18940

75763

... More
( Ground Floor )

4

18222

72888.8

... More
( First Floor )

3

18222

54666.6

... More
( Ground Floor )

7

6839

47876.5

... More
( First Floor )

8

6839

54716

... More
( Ground Floor )

7.2

1075

7741.8

... More
( First Floor )

7.2

1075

7741.8

... More
( Ground Floor )

5

19852

99261.75

... More
( First Floor )

3

19852

59557.05

... More
( Ground Floor )

4

16209

64836.6

... More
( First Floor )

4

16209

64836.6

... More
( Ground Floor )

1

44724

44724.1

... More
( First Floor )

1

44724

44724.1

... More
( Ground Floor )

4

17720

70883

... More
( First Floor )

3

17720

53162.25

... More
Royalty charge & Surcharge (211.95+4.23) for various materials {'Hard Murum', 'Natural Sand - Screened', 'Rubble'}

722.3

216

156146.81

... More
BASIC TEST OF AGGREGATE : Water Absorption, Specific Gravity,Impact Value, Crushing Value.

1

2730

2730

... More
BASIC TEST OF AGGREGATE: Sieve Analysis.

2

725

1450

... More
BASIC TEST OF AGGREGATE: Flakiness Index & Elongation Index.

1

895

895

... More
BASIC TEST OF CEMENT: Standard Consistancy, Fineness, Specific Gravity, Setting Time ( Initial & Final ), Compressive Strength, Soundness.

1

3960

3960

... More
FINE AGGREGATES: Fineness Modulus ( Sieve Analysis ),Silt & Clay Content

3

1450

4350

... More
STEEL BAR TESTING : Upto 16 mm (Set of 3 Bars)

3

1340

4020

... More
STEEL BAR TESTING : Above 16 mm (Set of 3 Bars)

3

1675

5025

... More
BRICKS: Water Absorption (Set of 5 Bricks), Compressive Strength( Set of 5 Bricks), Efflorescence (Set of 5 Bricks).

5

2285

11425

... More
CERAMIC TILES / VITRIFIED TILES : Water Absorption, Modulus of Rupture (Set of 6 Tiles)

4

1675

6700

... More
STONE/ RUBBLE : Crushing Value/Compressive Strength, Water Absorption & Specific Gravity,

1

2120

2120

... More
SOIL / MURUM : Sieve Analysis.

1

725

725

... More
SOIL / MURUM : Liquid limit & plastic Limit.

1

1230

1230

... More
ALUMINIUM SECTION : Thickness, Mass Per Running meter,

1

725

725

... More
CONCRETE : Compressive Strength OF C.C. Cube (Set of 3 cubes).

6

725

4350

... More
Concrete Mix Design (With all Tests on basic materials)

2

14445

28890

... More
MORTOR :Compressive Strength.( Set of 3 Cubes)

1

725

725

... More
CONCRETE PAVING BLOCKS: Compressive Strength , Water Absorption,(Set of 8 Blocks)

1

2620

2620

... More
SOIL / MURUM : Compaction Test ( Proctor Density ).

1

1955

1955



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.