Rural Development Department Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Rural Development Department - RDD Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date31 Jan 2024
Closing Date5 Feb 2024
Tender Amount₹ 78,96,537 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No 4 :- Providing and supplying Air Valves as per IS- 14845-2000 and MJP’s standard specifications of approved make and quality of following diameters including railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores, unloding and stacking excluding GST levied by GOI & GOM in all respect etc. complete Air valves 32 mm Dia

3

5727

1909

... More
Item No 5 :- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Earth Soil

252

41580

165

... More
Item No 6 :- Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. HMB

189

39916

211.2

... More
Item No 7 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Soft Rock

94.5

59459

629.2

... More
Item No 8 :- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. omplete by all means. Hard Rock

94.5

105717

1118.7

... More
Item No 9 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete.

90

8316

92.4

... More
Item No 10:- Lowering laying and jointing with SBR ruber gaskets C.I. S/S pipes of various classes with CI / MS specials of following diameter in proper position, grade and alignment as directed by Engineer-in-charge including conveyance of material from stores to site of work, including cost of jointing materials and rubber rings labour etc. complete. 150 mm dia DI K-7 Pipe

1000

77000

77

... More
Item No 11:- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) Sluice valves 100 mm Dia

2

4998

2499.2

... More
Item No 12:- Lowering, laying and fixing in proper alignment and position all types of C.I. air valves as directed by Engineer-in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc. complete. (for all class of valves) Air valves 32 mm Dia

3

920

306.9

... More
Item No 13:- Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -in- charge for following diameters of pipe lines (type design attached.) Foundation on Murum and Harder Strata.upto 150mm

3

18407

6135.8

... More
Item No 14:- Providing and laying in situ Cement Concrete of trap/ granite / quartzite /gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering,form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) a) 1:2:4 (M-150) grade for Thrust Blocks

22.03

150329

6824.4

... More
Item No 15:- Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.As above of 90 x 60 cm internal size and depth upto 1.2 M with precast R.C.C slab cover.

4

46745

11686.4

... More
Item No 16:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete

508.47

46982

92.4

... More
Item No 17:- Hydraulic testing of C.I./D.I. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position using water supplied by the contractor. 150 mm dia DI K-7 Pipe

1

8186

8186.2

... More
Sub-Work No.2 -RCC Sump 27000 LIT Designing (aesthetically), and constructing RCC ground service reservoirs / RCC sumps in M-300 mix. of required capacity including excavation in all types of strata, foundation concrete,container walls, bottom slab top RCC roof slab / or dome, 20 mm thick cement plaster with water proofing compound in CM1:3 proportion. to inside face of the container,including epoxy paint from inside including refilling and disposing of surplus stuff within lead of 50 M, all labour and material charges, for laying and jointing of pipe assembly for inlet, outlet washout,over flow and bye-pass arrangement consisting of C.I./ M.S.D/F. pipes, specials and valves of given diameters, providing and fixing accesso- ries such as Stainless Steel ladder inside andoutside, C.I. Manhole frame and cover, water top slab, B.B.masonry chamber for all valves, ventilating shafts, including giving satisfactory hydraulic test and water tightness test as per IS code and providing three coats of Acrylic emulsion with Silicon additives Paint to all expose surface of structure including roof surface etc. com- plete as per design data,criteria, obligatory requirements and detailed specifications.Antitermite treatment shall be given for under ground portion of structure Cost of 25,000 Ltr GSR

1

483748

483748

... More
For balance 2000 lit Rate is

2000

22960

11.48

... More
Add 10 forMMRDA

0.1

50670

506708

... More
Sub-work No.3- SWITCH ROOM (Siz- 2.50mX 2.50m) Item No 1 Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 1/259)

3.19

526

165

... More
Item No 2 Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259)

3.1

579

187

... More
Item No 3 Providing and laying in situ cement concrete in M – 15 (1:2:4) grade of trap /granite/quartzite/gneiss metal for foundation & bedding including bailing out water manually, form work compaction & curing, etc complete.

1.17

7973

6824

... More
Providing uncoursed rubble masonry of t rap / granite / quartzite /gneiss stones in cement mor tar 1:6 in foundation and plinth of innerwalls / in plinth of external walls including bailing out water manually , striking joints on un exposed faces and water ing etc.complete.

8.53

44617

5232.7

... More
Providing second class Burnt Br ick masonry wi th convent ional/ I.S.type br icks in cement mor tar 1:6 in superst ructure including striking joints, raking out joints, water ing and scaffolding etc. Complete

3.86

32142

8327

... More
Providing and casiting in situ CC of trap /granite/quartzite/gneiss metal of approved quality for R CC work as per detailed drawing and designs or as diredcted by Engineer – in- charge including normal dewatering, centering, fromwork,compaction, finishing the formed surface withCM 1:3 of sufficient minimum thickness to give a smooth and even surface wherever necessary or roughening if special finish to be provided and curing, etc complete.

0.94

9637

10244.3

... More
Providing internal cement plaster 20mm. thick in two coats in cement mortar 1:3 without neeru finish, to concrete, brick surface, in all positions including scaffolding and cur ing etc. complete.

14.83

6134

413.6

... More
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days nd keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.

18.7

12318

658.9

... More
Filling the plinth & floors Murum bedding in trenches with approved murum from excavatyed materials form foundation 15 cm. to 20 cm. layers including watering and compaction complete.

4.98

460

92.4

... More
Providing and laying cement concrete flooring 40 mm thick wi th M15 cement concrete laid to proper level and slope in alternate bays including compact ion, fi lling joints, marking lines to give the appearance of t i les of 30 cm x 30 cm or other size laid diagonally / square etc finishing smooth (wi th ext ra cement ) in any colour as directed and cur ing etc. complete. With Natural Sand

4.16

2311

555.5

... More
Providing and fixing frame wi th / wi thout ventilator of size as specified with Country cut teak wood for doors and windows including chamfering, rounding, rebat ing, iron holdfast of size 300mm x 40mm x5mm with oil paint ing, etc. complete

0.19

39137

201480.4

... More
Providing and fixing Count ry cut teak wood double or single leaf panelled shut ters, 35 mm thick style top and freze rail 95 x 35 thick with lock and bottam rail 195 x 25 mm thick and panels without ventilator as per detai led drawing excluding the door frame, stainless steel fixtures and fastening and finishing the wood work wi th oil paint ing 3 coats complete

1.76

17044

9662.4

... More
Providing and fixing Count ry cut teak wood windows wi th double leaf 25 mm thick planked shutters without ventilators as per detailed drawings including stainless steel fixtures and fastenings and finishingthe wood work wi th oil paint ing 3 coats etc. complete

0.54

3612

6689.1

... More
Providing flush grooved pointing with cement mor tar 1:3 for stone masonry work including scaffolding and curing etc. complete.

6.74

1275

189.2

... More
Providing and applying washable oil bound distemper of approved colour and shade to old/ new surfaces, in three coats including scaffolding, preparing the surface to receive the priming coat and finishing coat etc. complete.

35.83

1694

47.3

... More
Providing and fixing locking arrangement the standered qualityof lock for pump house, etc complete

1

1000

1000

... More
Providing and fixing in position steel bar reinforcement of various diamenters for RCC piles, caps, footing, foundation, slabs, beams, columns, canopies, staircases, newels,chjjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules, including cutting, bending, hooking he bars, binding with wires or tack welding and supporting as required, etc. complete.(including cost of binding wire)

0.09

9145

97206

... More
SUBWORK 2 :- PUMPING MACHINERY 5.00BHP Item No 1:- Providing, erecting and giving test of submersible monoblock pump set conforming to IS 8034 and motor conforming to IS 9283, with water proof winding. Pump shall be suitable for various delivery head and discharge with stainless steel shaft. Motor suitable for working on 415 V ± 10%, 3 Ph, 50 Hz A.c. Supply, with cable guard, thrust carbon/fiber bearing to withstand entire hydraulic thrust. The pump set shall be suitable for direct coupling, with suitable suction strainer. Pump should have suitable discharge out let as per Manufacturer's design. Antithrust stream lined non return valve shall be provided with the pump. 3 m submersible copper conductor cable in single /double run and 2 pairs of suitable size erection clamp 10 mm thick shall be provided with each pump.Submersible monoblock Pump set (with Bronze / Stainless steel(CF8M) Impeller) Horizontal / Vertical- up to 3 stages, Discharge, Q = 3.7 Lit/Sec, Head, H = 28 mtr

2

50077

25038.54

... More
Item No. 2 :- Supplying and erecting, Flat flexible submersible cable with, Copper Conductor, PVC insulated, and PVC sheathed. 3 core 2.5 sqmm

60

8340

139

... More
Item No.3 :- Supplying and erecting assembled DOL starter in provided cubical panel, with ON-OFF push buttons, no volt coil, over load element and required power and control wiring complete. Upto 7.5 HP

2

4580

2290

... More
Item No.4 :- Providing , installing & commissioning main control pannel board including V.meter & A. meter of suitable range single phase prevention 8 Nos. of phase indicater lamps with colour glass of 230 V rotary switch over load capacitor suitable for 7.50HP and 12.50BHP pump etc.complete. (Market rate)

1

32648

32648.51

... More
Item No. 5:- Providing, erecting Pressure gauge of required range complete with syphon tube, isolating cock suitable for 12 mm dia G.I. Pipe. Pressure gauge shall be installed as directed, with tapping on rising main. Pressure Gauge (100mm Dia)

2

1794

897

... More
Item No. 6:- Providing tools for pumping.

1

6815

6815

... More
Item No 7:- Main wiring work from M. S. E. B. cut out to the panel board 4 core x 16 sq mm 1100 grade with I. S. I. Mark standard / Aluminum armored cable (94.1 p.36)

10

1870

187

... More
Item No 8:- Providing pipe type earthing with 40mm. dia. G.l. pipe or 20 mm dia. G.l. Rod complete with all materials as per specification no. EA-EP

1

1575

1575

... More
Item No 9:- Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below. 50mm, Medium class

20

6600

330

... More
Item No 10:- Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. 50mm, Medium class

20

1584

79.2

... More
Item No 11:- Providing, erecting double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. 50mm Dia

2

10228

5114.3

... More
Item No 12:- Providing, supplying and erecting ISI mark CI D/F reflux valves (non-return valves ) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. Reflux valves as per I.S.5312 Part I (1984) 50mm Dia

2

8470

4235.3

... More
Item No 13:- Chain Pulley Block Providing, erecting triple spur gear type Chain Pulley Block suitable for capacity as below with 6 m lift complete with load chain and hand chain suitable for above lift, tested to 50% over load as per IS 3832 carrying lSI mark, 1 Tonne capacity

1

15322

15322

... More
Item No14:- Travelling Trolley Providing, erecting Travelling Trolley of capacity as below with 6 m lift, tested to 50% over load 1 Tonne capacity

1

12031

12031

... More
Item No 15:- Structural Steel Providing, installing and commissioning of track girders/ ISMB 150 Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting, etc. complete.

0.15

10502

70017

... More
SUBWORK 3:-Rising Main-HDPE PN 8 110mm=30m Item No 1:- Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. Note:- H.D.P.E. Pipes shall be as per latest IS Specifications Also HDPE pipes upto 110 mm Dia shall be in coil form 110 mm Dia HDPE Pipe 8Kg/sqcm

30

13020

434

... More
Item No 2:- of cost of pipes shall be considered for cost of PVC/HDPE specials for estimate purpose only.

13020

651

0.05

... More
Item No 3:- Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete PN -1 (Without by pass) Sluice valves 100 mm Dia

1

6835

6835

... More
Item No 4:- Providing and supplying ISI mark CI D/F reflux valves (non-return valves ) of following dia including railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental stores, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. Reflux valves as per I.S.5312 Part I (1984)Without by pass arrangement -PN -1 Reflux valves 100mm Dia

1

5713

5713

... More
Item No 5:- Providing and supplying Air Valves as per IS- 14845-2000 and MJP’s standard specifications of approved make and quality of following diameters including railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores, unloding and stacking excluding GST levied by GOI & GOM in all respect etc. complete.

1

1365

1365

... More
Item No 6:- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Earth soils

7.56

1247

165

... More
Item No 7:- Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. HMB

5.67

1197

211.2

... More
Item No 8:- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Soft Rock

2.84

1786

629.2

... More
Item No 9 - Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. omplete by all means. Hard Rock

2.84

3171

1118.7

... More
Item No10:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete.

2.7

249

92.4

... More
Item No 11:- Lowering, Laying and Jointing H. D. P. E./M.D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II 75mm Dia HDPE Pipe 8 Kg/sqcm

30

2310

77

... More
Item No 12:- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) Sluice Valve 50 mm Dia

1

2499

2499.2

... More
Item No 13:- Lowering laying and jointing in position following C.I.D/F Reflux valves Butterfly valves and sluice valves including cost of all labour joining material, including not bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of sluice valves) Reflux valves 50mm Dia

1

2499

2499.2

... More
Item No 14:- Lowering, laying and fixing in proper alignment and position all types of C.I. air valves as directed by Engineer-in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc. complete. (for all class of valves)

1

265

265.1

... More
Item No 15:- Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -in- charge for following diameters of pipe lines (type design attached.)

1

6135

6135.8

... More
Item No 16:- Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. As above of 90 x 60 cm internal size and depth upto 1.2 M with precast R.C.C slab cover.

3

35059

11686.4

... More
Item No 17:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete

15.28

1411

92.4

... More
Item No 18:- Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position. 75 mm Dia HDPE Pipe 8 Kg/sqcm

0.03

223

7442

... More
SUBWORK 4:-R.C.C. ESR 81000 Lit 14m SH Item No 1:- Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 metres centre to centre for ESR having capacity upto 500 cum and not more than 6 m c/c for ESRs having capacity above 500 Cum including excavation in all types of strata, foundation concrete, cement plaster with water proofing compound to the inside face of the container including refilling disposing off the surplus stuff within a lead of 50 metres, all labour and material charges including lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design, providing and fixing accessories such as M.S. ladder, C.I. manhole frame and covers, water level indicators, lightening conductor, G.I. pipe railing around walk way and top slab, providing spiral stair case from ground level to roof level, M.S. grill gate of 2 M height with locking arrangement of approved design, B.B. masonry chambers for all valves, ventilating shafts, providing and applying three coats of cement paint to the structure including roof slab, epoxy painting to internal surface and anti- termite treatment for underground parts of the structure and giving satisfactory water tightness test as per I.S. code. The job to include painting the name of the scheme and other details on the reservoir as per the directions of Engineer-in-Charge. 1)The design of the structure be in accordance with relevant I.S. specification (I.S. 3370 - 1965 or revised.) 2)The design shall satisfy the stipulations as per I.S. 1893 - 1984 and I.S. 13920 / 1993 for seismic force and I.S. - 11682/ 1985 for R.C.C. staging of overhead tanks. 3)For design having more than 6 columns, provision of internal bracing is obligatory. External bracings is also obligatory. 4)The entire structure shall be in M-300 mix only. 5)Plain round mild steel bars grade-I conforming to I.S. 432 part-I or high yield strength deformed bars conforming to I.S. 1786 or I.S. 1139 shall be used, grade-II mild steel bars will not be allowed. 6)Irrespective of the type of foundation proposed in the design, one set of bracing be provided at the ground level. 7)These rates include providing M.S. ladder for E.S.R.s upto 2 lakh litres capacity and providing spiral staircase for E.S.R. above 2 lakh litres capacity. 8)Staging shall have to be designed with stresses of M-200 concrete for ESR. However all RCC construction should be done in M-300. 9)These rates are including the cost of uplift pressure if any and entire dewatering during execution. In case of water logging area where water is stretch at shallow depth, extra provision of dewatering shall be made as per site condition. 10)All conditions given in the Member Secretary's Circular No. MJP / TS-I / 350 / 1668 dt. 2-8-97 and MJP / S-I / 350 / 2127 dt. 13-7-99 shall be strictly followed and additional cost, if any, due to these conditions is included in the rates mentioned below. 11)75% part rate shall be payable for reinforcement concrete and plastering items of containers of E.S.R. till satisfactory hydraulic testing for water tightness is given; and till that work shall be treated as incomplete. 12)The rates indicated in the table are excluding the cost of pipes, specials and valves required for inlet, outlet, washout, overflow and bypass arrangement. The scope of work, however, includes cost of erecting, laying and jointing of pipes and valves including cost of jointing materials upto 5 M beyond outer face of outermost column 13)For ESR upto 500 cum capacity C.I. double flanged pipes upto 300 mm dia shall be provided and C.I. specials shall be used. For ESR above 500 cum capacity C.I./M.S. pipe assembly with minimum 8 mm thickness upto 500 mm dia and minimum 10 mm thickness above 500 mm dia can be used with proper anti-corrosive epoxy treatment from inside and outside. 14)Below mentioned rates are for foundations with individual footing with bearing capacity of 20 tonnes per square metre. For raft foundations, these rates shall be increased by 7.5% where safe bearing capacity (SBC) is 5 MT per sqm and by 5% where SBC is more than 5 MT/sqm and upto 10 MT/sqm. This % of 5% or 7.5% is applicable for estimation of amount of lumpsum item of ESR. For extra item due to change from individual foundation to raft, actual increase in concrete and steel be paid as per relevant DSR item. 15)The rate shall be increased by 30% for bearing piles upto depth of 10 M and for further increased in depth by 5 M each, it shall be increased by another 10%. These rates are applicable where raft is not feasible. For pile foundations sulphate resistant cement shall only be used. Single pile for the column is not permitted, group of piles shall be designed with pile cap for each column of ESR. 16)The rates are applicable for staging height of 12 M. These rates shall be increased or decreased for per metre variation in this staging height as below 12 to 16 M staging - 2% per metre 16 to 20 M staging - 3% per metre 20 M and above - 4% per metre Rate for per Litre capacity for 75000 Ltrs

1

1845104

1845104

... More
Add cost for additional 6000 Ltrs

6000

80400

13.4

... More
Total Stagging Ht 14.00 M,Therefore decrease 2% Per Metre

0.04

77020

1925504

... More
Add for Seismic zone

0.05

100126

2002524.16

... More
Add for MMRDA Area

0.1

210265

2102650.37

... More
Item No 2:- Providing ISI mark GI. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Inlet,Outlet,Overflow G. I Pipe 100 mm. ( 12.40 kg./m ) Basic Price + Lowering = (785+129 = 914)

48

43872

914

... More
Item No 3:- Providing and supplying double flange sluice valves confirming for IS 2906/14846 including warn gear arrangement as per test pressure stainless steel spindle caps excluding GST levied by Gol and GoM in all respect , transportation etc complete. Sluice valves 125mm Dia

3

34128

11376

... More
SUBWORK5:- DistributionSystem(63mm=4039m,75mm=408m,90mm=146 Total=4593m)FHTC=26Nos. Item No 1:- Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete. Note:- H.D.P.E. Pipes shall be as per latest IS Specifications Also HDPE pipes upto 110 mm Dia shall be in coil form 63 mm Dia HDPE Pipe 6 Kg/sqcm

1321

163804

124

... More
75 mm Dia HDPE Pipe 6 Kg/sqcm

561

96492

172

... More
90 mm Dia HDPE Pipe 6 Kg/sqcm

607

148108

244

... More
110 mm Dia HDPE Pipe 6 Kg/sqcm

117

41418

354

... More
125 mm Dia HDPE Pipe 6 Kg/sqcm

311

150835

485

... More
Item No 2:- of cost of pipes shall be considered for cost of PVC/HDPE specials for estimate purpose only.

600657

30032

0.05

... More
Item No 3:- Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete PN - 1.6 (Without by pass arrangement) Sluice valves 65 mm Dia

3

18618

6206

... More
Sluice valves 80 mm Dia

3

20274

6758

... More
Sluice valves 100 mm Dia

1

9005

9005

... More
Sluice valves 125 mm Dia

1

11251

11251

... More
Item No 4:- Providing and supplying Air Valves as per IS- 14845-2000 and MJP’s standard specifications of approved make and quality of following diameters including railway freight, inspection charges, unloading from railway wagons, loading into truck, transportation upto departmental stores, unloding and stacking excluding GST levied by GOI & GOM in all respect etc. complete. Air valves 25mm Dia

7

8869

1267

... More
Item No 5:- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Earth Soils

630.07

103961

165

... More
Item No 6:- Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.. HMB

472.55

99802

211.2

... More
Item No 7:- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking as directed by Engineer-incharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Soft Rock

236.28

148667

629.2

... More
Item No 8:- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. omplete by all means Hard Rock

236.28

264326

1118.7

... More
Item No 9:- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete.

262.53

24257

92.4

... More
Item No 10:- Lowering, Laying and Jointing H. D. P. E./M.D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II 63 mm Dia HDPE Pipe 6 Kg/sqcm

1321

65389

49.5

... More
75 mm Dia HDPE Pipe 6 Kg/sqcm

561

29620

52.8

... More
90 mm Dia HDPE Pipe 6 Kg/sqcm

607

44735

73.7

... More
110 mm Dia HDPE Pipe 6 Kg/sqcm

117

9009

77

... More
125 mm Dia HDPE Pipe 6 Kg/sqcm

311

27368

88

... More
Item No 11:- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) Sluice Valve 65mm Dia

3

4128

1376.1

... More
Sluice Valve 80 mm Dia

3

5735

1911.8

... More
Sluice valves 100 mm Dia

1

2499

2499.2

... More
Sluice valves 125 mm Dia

1

3110

3110.8

... More
Item No 12:- Lowering, laying and fixing in proper alignment and position all types of C.I. air valves as directed by Engineer-in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc. complete. (for all class of valves) Air valves 25mm Dia

7

1678

239.8

... More
Item No 13:- Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -in- charge for following diameters of pipe lines (type design attached.) Foundation on Murum and Harder Strata. upto 150mm

7

42950

6135.8

... More
Item No 14:- Providing and laying in situ Cement Concrete of trap/ granite / quartzite /gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering,form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) A) 1:2:4 (M-150) grade for encasing

11.53

78693

6824.4

... More
Item No 15:- Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge. As above of 90 x 60 cm internal size and depth upto 1.2 M with precast R.C.C slab cover.

8

93491

11686.4

... More
Item No 16:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete

1285.72

118800

92.4

... More
Item No 17:- Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position. 63 mm Dia HDPE Pipe 6 Kg/sqcm

1.32

7203

5457.1

... More
75 mm Dia HDPE Pipe 6 Kg/sqcm

0.56

3061

5457.1

... More
90 mm Dia HDPE Pipe 6 Kg/sqcm

0.61

4969

8186.2

... More
110 mm Dia HDPE Pipe 6 Kg/sqcm

0.12

957

8186.2

... More
125 mm Dia HDPE Pipe 6 Kg/sqcm

0.31

2970

9550.2

... More
SUBWORK 6:- Misc Works(mseb Charges) Item No 1:- Providing & streching transmission line & making Additional electric load connection to Head works, including all charges as per MSEB rule

1

300000

300000

... More
SUBWORK 7:-Trial Run ( For 1 Month) Item No 1:- Commissioning, running and maintaining the scheme to quantities, rated capacity, including manning necessary personnel such as operator, valveman, etc. as per requirements of the scheme and who should also administer chemical dose for a period of 1 month for individual scheme and for regional scheme, together with training of personnel spared by MJP / Local Body and handing over the scheme to Local Body after completion of the above period as directed by Engineer-in-charge.Note: Required chemicals to be supplied by Department free of cost and electricity bill will also be paid by the Department. For single village without WTP For 1 Month 26244 x 01 Months Total For 1 Months

1

26244

26244

... More
Item.no:14 - ADD GST 18%

0.18

1204556

6691980.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.