Rural Development Department

Dhule, Maharashtra

  • Opening Date

    10 Sep 2019

  • Closing Date

    16 Sep 2019

  • Tender Amount

    ₹ 7,19,855

  • EMD

    -

Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Providing Ro Plant System , Shed And Allied Pipeline At Nyahalo Tal Dist Dhule (substation Adivasi Vasti Z P School Samor)

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items
ItemQuantityUnitsRateAmount
... more
Fully Auto fully FRP 1000 lph plant Raw water 1 (1 hp) sand filtration (frp vessel) Activated carbon filtration ,Micro filtration -2 no, High pressure pump Membrance 4040.4 No Toray / Dow/c s m FRP housing 4*80 1 no, Panel plc based/ eco panel, Flow meter 2 no, Pressure guage , Dosing pump 1 No, Online TDS meter 1 no floaty 1 no, auto flash 1 set, skeed , low pressure 1 no High pressure 1 no All pipe line for plant , Multi port valve operation which covers backwash and rising of vessel - SS 304 UV (Rate with Tax) As per rate approved by CEO ZP Dhule for 2018-19 RO Plant 1000 LPH FRP
1Nos- -
... more
Providing and fixing 3 ton water chiller
1Nos- -
... more
Providing and fixing water ATM card with as per table mentioned in terms and conditions as per specification Rate with GST and all other applicable taxes Water ATM Machine
1Ls- -
... more
B) Providing and constructing structural steel shade for RO Plant Room Providing structural steel work in rolled stanchions fixed with connecting plates or angle cleats as in main and cross beams, hip and jack rafters, purlins connecting to truss members and like as per detailed designs and drawings or as directerd by engineeer in charge including cutting, fabricating, hoisting, erecting , fixing in position , making riveted / bolted, welded connections and one coat of anticorrsoive paints and over it two coats of oil paintingetc comploet Providing and erecting 1.5 mtr high wire fencing with seven rows of barbed wire supproted ofn M s angle (50mm x 50 mm x 6 mm) at 2.5 meters, center to center including excavating pits for foundatin, fixing post in cement concrete of size 45 x 45 x 45 cm fastening the wire and painting the M S angels with one coat of red lead primer and two coats of painting etc complete
1Ls- -
... more
Providing and fixing corrugated galvanised iron sheets of 0.63 mm thick (24 B W G) for roofihng without wind tiles including fastening with galvanised iron screws awnd bolts, lead nad bitumen washers as per drawing etc complete (weight of 5.5 kg/sqm)
120Ls- -
... more
providing and fixing steel frame door of angle 40 x 40 x 5 mm with 16 mm dia mild steel bars horizontally at 10 cm c/c for ventilator portion including iron hold fast for the fixing shutters including welding, painting, finishing etc complete
3Ls- -
... more
Providing and fixing internal electrification like cable, board, switches , light etc as directed by engineer in charge
1Ls- -
... more
Add GST
1Ls- -
... more
C) Providing pipeline for RO Plant room Providnig and laying in trenches 20 mm dia CPVC pipe including necessary excavation , fittings, refilling trenches etc complete including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc complete 25 mm dia PVC 4 kg / cm 2
100Ls- -
... more
75 mm dia PVC 4 kg / cm2
60Ls- -
... more
Providing and supplying in standary lengths ISI mark rigid unplasticised PVC / CI pipes special suitable for above said pipe and subwork including all local and central taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to the department stores / sit and stacking the same in closed shed duty protected from sun rays and rains etc complete
1Ls- -
... more
Excavation for foundation / pipe trenches in soil / soft murum including removing the excavated material stacking as directed by engineer in charge normal dewatering, preparing the bed for foundation and excluding backfilling etc complete
18Ls- -
... more
Refilling the trenches with available excavated stuf with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation , surcharging etc complete
18Ls- -
... more
Providing and fixing HDP container syntex or alike one piece moulded water tank made out of high density polythiler and built corrugated inclduing of delivery upto destination hoisting and fixing of accessories such as inlet, outlet overflow pipe including of all tanks capacity between 200 to 1000 liters Water tank sintex
4000Ls- -
... more
Add GST
1Ls- -

‘ÖÖêÂÖÞÖÖ¯Ö¡Ö 1. ×®Ö×¾Ö¤êüŸÖᯙ †™üß ¾Ö ¿ÖŸÖá ´Öß ¾ÖÖ“Ö»µÖÖ †ÃÖæ®Ö ´Ö»ÖÖ ŸµÖÖ ´ÖÖ®µÖ †ÖÆêüŸÖ. ŸµÖÖ²ÖÖ²ÖŸÖ“Öß ´ÖÖ—Öß ÛúÖÆüß ‹Ûú ŸÖÛÎúÖ¸ü ®ÖÖÆüß. 2. ×®Ö×¾Ö¤êüÃÖÖê²ÖŸÖ ÃÖÖ¤ü̧ ü Ûú¸üÞµÖÖŸÖ †Ö»Öê»Öß ÛúÖÝÖ¤ü¯Ö¡Öê Æüß ÃÖ¾ÖÔ ÜÖ¸üß †ÃÖæ®Ö ŸµÖÖŸÖ ÛúÖÆüß ¤üÖêÂÖ †Öœüôû»µÖÖÃÖ ´Öß ¾µÖŒŸÖß¿Ö: •Ö²ÖÖ²Ö¤üÖ¸ü ¸üÖÆüß»Ö. 3. ´ÖÖ—Öß ×®Ö×¾Ö¤üÖ / ´ÖÖ®µÖ —ÖÖ»Öê»Öê ×þÖÛéúŸÖ ¤ü¸ü ¯Öã̧ ü¾ÖšüÖ †Ö¤êü¿Ö ×®ÖÝÖÔ×´ÖŸÖ —ÖÖ»µÖÖ“µÖÖ ×¤ü®ÖÖÓÛúÖ¯ÖÖÃÖæ®Ö ´Öß ‹ÛúÖ ¾ÖÂÖÖÔÃÖÖšüß ¯Öã̧ ü¾ÖšüÖ Ûú¸üÞµÖÖÃÖ ²ÖÖÓ×¬Ö»Ö ¸üÖÆüß»Ö. ¾Ö ŸÖÃÖÖ Ûú¸üÖ¸ü®ÖÖ´ÖÖ Ûú¹ý®Ö ¤êüÞµÖÖÃÖ ¤êüÜÖᯙ ²ÖÖÓ×¬Ö»Ö ¸üÖ×Æü»Ö. 4. ÛúÖµÖÖÔ»ÖµÖÖÛú›æü®Ö ¯Öã̧ ü¾ÖšüÖ †Ö¤êü¿Ö ¯ÖÏÖ¯ŸÖ —ÖÖ»µÖÖ¯ÖÖÃÖæ®Ö ´ÖÖ»ÖÖ“ÖÖ ¯Öã̧ ü¾ÖšüÖ 07 פü¾ÖÃÖÖ¯ÖµÖÕŸÖ Ûú ü̧ÞµÖÖÃÖ ²ÖÖÓ×¬Ö»Ö ¸üÖ×Æü»Ö. 5. ´ÖÖ»ÖÖ“ÖÖ ¯Öã̧ ü¾ÖšüÖ ×®Ö׿“ÖŸÖ Ûêú»Ö껵ÖÖ ×¾Ö×®Ö¤ìü¿ÖÖ¯ÖḮ ÖÖÞÖê (ïÖê×ÃÖ×±úÛêú¿Ö®Ö ¯ÖḮ ÖÖÞÖê) Ûú¸üÞµÖÖÃÖ ²ÖÖÓ×¬Ö»Ö ¸üÖ×Æü»Ö. •ÖÖ×Æü¸ü ‡Ô ×®Ö×¾Ö¤üÖ ÃÖã“Ö®ÖÖ ÝÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ ®µÖÖÆüôûÖê¤ü ŸÖÖ.¬Öãôêû וÖ.¬Öãôêû Æêü šüŒÛú¸ü²ÖÖ¯¯ÖÖ †Öפü¾ÖÖÃÖß ¾ÖßÖß ÃÖã¬ÖÖ¸üÞÖÖ ÛúÖµÖÔÛÎú´Ö †ÓŸÖÝÖÔŸÖ •Ö»Ö¿Ö㬤üßÛú¸üÞÖ ÃÖÆüµÖÓ¡Ö (R O System) ²ÖÃÖ×¾ÖÞÖê²ÖÖ²ÖŸÖ (ÃÖ²ÖÙêü¿Ö®Ö †Öפü¾ÖÖÃÖß ¾ÖßÖßŸÖ ×•Ö ¯Ö ¿ÖÖôêûÃÖ´ÖÖȩ̂ ü) ¤ü¸ü Æêü ‡Ô ×®Ö×¾Ö¤üÖ ¯Ö¬¤üŸÖß®Öê BOQ ±úÖò́ ÖÖÔŸÖ ³Ö¸üÞÖê †Ö¾Ö¿µÖÛú †ÖÆêü. ×®Ö×¾Ö¤üÖ¬ÖÖ¸üÛúÖ“Öê ®ÖÖ¾Ö- † ÛÎÓú ŸÖ¯Ö¿Öᯙ ØÛú´ÖŸÖ †õÖ¸üß †ÓÛúß 01 ÝÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ ®µÖÖÆüôûÖê¤ü ŸÖÖ.¬Öãôêû וÖ.¬Öãôêû Æêü šüŒÛú¸ü²ÖÖ¯¯ÖÖ †Öפü¾ÖÖÃÖß ¾ÖßÖß ÃÖã¬ÖÖ¸üÞÖÖ ÛúÖµÖÔÛÎú´Ö †ÓŸÖÝÖÔŸÖ •Ö»Ö¿Ö㬤üßÛú¸üÞÖ ÃÖÆüµÖÓ¡Ö (R O System) ²ÖÃÖ×¾ÖÞÖê²ÖÖ²ÖŸÖ (ÃÖ²ÖÙêü¿Ö®Ö †Öפü¾ÖÖÃÖß ¾ÖßÖßŸÖ ×•Ö ¯Ö ¿ÖÖôêûÃÖ´ÖÖȩ̂ ü) ×®Ö×¾Ö¤üÖ¬ÖÖ¸üÛúÖÓÃÖÖšüß ×»Ö±úÖ±úÖ ÛÎÓú 1 ŸÖÖÓסÖÛú ×»Ö±úÖ±úÖ ÃÖÖšüß ÃÖÖê²ÖŸÖ •ÖÖê›üÖ¾ÖµÖÖ“Öß †Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡Öê 1.†™üß ¾Ö ¿ÖŸÖá ´ÖÖ®µÖ †ÃÖ»µÖÖ²ÖÖ²ÖŸÖ“Öê ‘ÖÖêÂÖÞÖÖ¯Ö¡Ö ¯Öã̧ ü¾ÖšüÖ¤üÖ¸üÖ“µÖÖ »Öê™ü¸ü¯Öò›ü¾Ö¸ü ÃÖÆüß ¾Ö ׿֌ÛúÖ ÃÖÆü. 2.×®Ö×¾Ö¤üÖ ±úÖò́ ÖÔ ×±ú ¹ý.1000/- ¾Ö ‡ÃÖÖ¸üÖ ¸üŒÛú´Ö ¹ý.7200/- ›üß›üß ¯Ö¬¤üŸÖß®Öê ³Ö¸üÖ¾ÖµÖÖ“Öê †ÖÆêü. ¾Ö ×›ü ›üß ÃÖ ü̧¯ÖÓ“Ö / ÝÖÏÖ´ÖÃÖê¾ÖÛú, ÝÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ ®µÖÖÆüôûÖê¤üü ŸÖÖ ×•Ö ¬Öãôêû µÖÖ ®ÖÖ¾ÖÖ®Öê ÛúÖœüÖ¾ÖêŸÖ ¾Ö ×®Ö×¾Ö¤êüÃÖÖê²ÖŸÖ ÃÛòú®Ö Ûú¹ý®Ö †¯Ö»ÖÖê›ü Ûú¸üÞÖê †Ö¾Ö¿µÖÛú †ÖÆêü. 3.¾µÖ¾ÖÃÖÖµÖÖ“ÖÖ ˆ»»ÖêÜÖ †ÃÖ»Öê»Öê “ÖÖ»Öæ ´Öã¤üŸÖß“Öê ÃÖÓãÖÖ ®ÖÖë¤üÞÖß ¯ÖḮ ÖÖÞÖ¯Ö¡Ö / ¤ãüÛúÖ®Ö ®ÖÖë¤üÞÖß ¯ÖḮ ÖÖÞÖ¯Ö¡Ö ÃÖŸµÖ¯ÖÏŸÖ 4.×¾Ö×ÛÎúÛú¸ü ÛúÖµÖÖÔ»ÖµÖÖÛú›üß»Ö ×®Ö×¾Ö¤üÖ¬ÖÖ¸üÛúÖ“Öê •Öß‹ÃÖ™üß ®ÖÖë¤üÞÖß ¯ÖḮ ÖÖÞÖ¯Ö¡Ö ÃÖŸµÖ¯ÖÏŸÖ 5.†ÖµÖÛú¸ü ¯ÖḮ ÖÖÞÖ¯Ö¡Ö / ¯Öò®Ö ÛúÖ›Ôü 6. ¯Öã¾ÖÖÔ®Öã³Ö¾ÖÖ²ÖÖ²ÖŸÖ ŸÖ¯Ö¿Ö߻־ÖÖ¸ü ´ÖÖ×ÆüŸÖß (¯Öã¾ÖÖÔ®Öã³Ö¾Ö †ÃÖ»Ö껵ÖÖ ×®Ö×¾Ö¤üÖ¬ÖÖ¸üÛúÖÓ®ÖÖ ¯ÖÏÖ¬ÖÖ®µÖ ¤êüÞµÖÖŸÖ µÖê‡Ô»Ö) 7.ISO ´ÖÖ®ÖÖÓÛú®Ö ¯ÖḮ ÖÖÞÖ¯Ö¡Ö ØÛú¾ÖÖ SSI ¯ÖḮ ÖÖÞÖ¯Ö¡Ö †Ö¾Ö¿µÖÛú †ÖÆêü. 8.¯Öã̧ ü¾ÖšüÖ¤üÖ¸üÖ®Öê ÃÖ¤ü ü̧ ÛúÖ´ÖÖ“Öß ¯Öã¾ÖÔ̄ ÖÖÆüÞÖß Ûú¹ý®Ö ÛúÖ´ÖÖÃÖÖšüß »ÖÖÝÖÞÖÖ·µÖÖ ÃÖ¾ÖÔ ¾ÖßÖæÓ“Öß µÖÖ¤üß ÝÖÏÖ´ÖÃÖê¾ÖÛú ØÛú¾ÖÖ ÃÖ ü̧¯ÖÓ“Ö ÝÖÏÖ ¯ÖÓ ®µÖÖÆüôûÖê¤ü ŸÖÖ ×•Ö ¬Öãôêû µÖÖÓ“µÖÖ Ã¾ÖÖõÖ¸üß“ÖÖ ¤üÖÜÖ»ÖÖ ®Ö´Öæ¤ü Ûêú»Ö껵ÖÖ ×¤ü®ÖÖÓÛú ¾Ö ¾Öêôêû“ÖÖ ‘Öê‰ú®Ö ŸÖÖê ¤üÖÜÖ»ÖÖ ×®Ö×¾Ö¤êüÃÖÖê²ÖŸÖ ŸÖÖÓסÖÛú ×»Ö±úÖ±úÖ ÛÎÓú 1 ´Ö¬µÖê †¯Ö»ÖÖê›ü Ûú¸üÞÖê †Ö¾Ö¿µÖÛú ¸üÖ×Æü»Ö ¾Ö †Ö¸ü †Öê ´Ö×¿Ö®Ö ®Ö´Öã®ÖÖ ¤üÖÜÖ¾ÖÞÖê †Ö¾Ö¿µÖÛú ¸üÖ×Æü»Ö . ¯Öã¾ÖÔ̄ ÖÖÆüÞÖß †Æü¾ÖÖ»Ö ÃÖ¸ü¯ÖÓ“Ö ØÛú¾ÖÖ ÝÖÏÖ´ÖÃÖê¾ÖÛú, ÝÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ ®µÖÖÆüôûÖê¤ü ŸÖÖ ×•Ö ¬Öãôêû µÖÖÓ“µÖÖ Ã¾ÖÖõÖ ü̧ß“ÖÖ ×¾Ö×ÆüŸÖ פü®ÖÖÓÛúÖ“ÖÖ ×®Ö×¾Ö¤êüÃÖÖê²ÖŸÖ †¯Ö»ÖÖê›ü ®ÖÃÖ»µÖÖÃÖ †¯ÖÖ¡Ö Ûú¸üÞÖêŸÖ µÖê‡Ô»Ö. ¾Ö¸üᯙ ÃÖ¾ÖÔ †Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ü¯Ö¡ÖÖÓ“µÖÖ ¯ÖÏŸÖß .pdf format ´Ö¬µÖê ÃÛòú®Ö Ûú¹ý®Ö ×®Ö×¾Ö¤êüÃÖÖê²ÖŸÖ ÃÖÖ¤ü¸ü Ûú¸üÞÖê †Ö¾Ö¿µÖÛú †ÖÆêü. †®µÖ£ÖÖ ×®Ö×¾Ö¤üÖ¬ÖÖ¸üÛúÖÓ®ÖÖ †¯ÖÖ¡Ö Ûú¸üÞµÖÖŸÖ µÖê‡Ô»Ö. ×®Ö×¾Ö¤üÖ¬ÖÖ ü̧ÛúÖÓÃÖÖšüß ×»Ö±úÖ±úÖ ÛÎÓú 2 ¾µÖÖ¯ÖÖ¸üß / ¤ü¸üÖ“ÖÖ ×»Ö±úÖ±úÖ ÃÖÖšüß ÃÖÖê²ÖŸÖ •ÖÖê›üÖ¾ÖÞµÖÖ“Öß †Ö¾Ö¿µÖÛú ÛúÖÝÖ¤ǖ Ö¡Öê 1. ÃÖÖê²ÖŸÖ •ÖÖê›üÞµÖÖŸÖ †Ö»Ö껵ÖÖ Bid Of Quantity “Öß .xls ±úÖ‡Ô»Ö ´Ö¬µÖê ¯Öã̧ ü¾ÖšüÖ¤üÖ¸üÖ“Öê ®ÖÖ¾Ö ¾Ö ¤ü¸ü ®Ö´Öæ¤ü Ûú¹ý®Ö †¯Ö»ÖÖê›ü Ûú¸üÞÖê †Ö¾Ö¿µÖÛú ¸üÖ×Æü»Ö. (×®Ö×¾Ö¤üÖ¬ÖÖ¸üÛúÖ“Öê ®ÖÖ¾Ö ÃÖÆüß ¾Ö ׿֌ÛúÖ) •ÖÖ×Æü¸ü ‡Ô ×®Ö×¾Ö¤üÖ ÃÖæ“Ö®ÖÖ ÝÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ ®µÖÖÆüôûÖê¤üü ŸÖÖ.¬Öãôêû וÖ.¬Öãôêû ÝÖÏÖ´Ö¯ÖÓ“ÖÖµÖŸÖ ®µÖÖÆüôûÖê¤ü ŸÖÖ.¬Öãôêû וÖ.¬Öãôêû Æêü šüŒÛú¸ü²ÖÖ¯¯ÖÖ †Öפü¾ÖÖÃÖß ¾ÖßÖß ÃÖã¬ÖÖ¸üÞÖÖ ÛúÖµÖÔÛÎú´Ö †ÓŸÖÝÖÔŸÖ •Ö»Ö¿Ö㬤üßÛú

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.