Rural Development Department Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Rural Development Department - RDD Tender
Eprocure
Opening Date13 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 6,79,712 This is an estimated amount, exact amount may vary.
Costs
EMD
0Document Cost
₹ 200Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SOLAP_1137110_1Tender No
GPJUNONI/15thFC/ET/03/2024-25Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://rdd.maharashtra.gov.in/en
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling in Plinth and floor murum bedding in Trenches with approved murum for excavated material from foundation 15 cm to 20 cm Layer including watering ,ramming and compaction etc complete.
23.67
92
2177.64
... More
Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete.
26.83
5881
157787.23
... More
Refilling the trenches with available excavated Stuff with soft material first over pipeline and then hard material in 15 cm layer with all leads and lift including consolidation ,surcharging ,etc.complete
99.77
92
9178.84
... More
Providing ISI standard R.C.C. pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints,including all statutary duties and taxes such as GST levied by Gol and GoM in all respect, inspection charges, transport to departmental stores/site, unloading and stacking etc. complete as per IS-458/1988 300 mm NP II
Note : One collar should be supplied with each full length plain ended RCC pipe, cost including in rates below. One rubber ring should be supplied with each full length of socketed pipe, cost included in rates below. 300 mm NP II
263
741
194883
... More
Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, etc. complete as directed by Engineer-in-charge (For all class of pipes.) as per IS-783-1985. 300 mm NP II
263
228
59964
... More
Providing and constructing B.B Masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation BB Masonry in 1:5 proportion precast RCC frame and cover etc. complete as directed by Engineer -in-charge (A) As above of 90 x 60 cm internal size and depth up to 0.90 m with precast RCC slab cover
12
7386
88632
... More
Providing and Supplying in Standard Length of ISI Mark rigid Unplasticsed PVC pipes for potable water with solvent cement joints including cost of couplers as per IS specification no.4985/1988 including all local and central taxes, transportation ,foreign charges ,inspection loading, unloading, conveyance to the departmental store/site and stacking the same enclosed shed duly protected from sun rays and rains including cost of jointing material. i.e. solvent cement , etc.complete.
102
160
16320
... More
Add Royalty Charges
1
9018
9018
... More
Add 18% GST Charges
1
102285
102285.51
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements