Rashtrasant Tukadoji Maharaj Nagpur University Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Rashtrasant Tukadoji Maharaj Nagpur University - RTMNU Tender

Works
Eprocure
Opening Date12 Apr 2018
Closing Date27 Apr 2018
Tender Amount₹ 17,25,757 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No. 2 : Removing the pitching including necessary excavation if required and stacking them neatly including all lead & lift , including 1 % cess on labour Welfare etc. complete .

-

-

-

... More
Barloni No.1

137

-

31.75

... More
Barloni No.2

171

-

31.75

... More
Item No.3 : Stripping Up to 10 cm depth in all kind of soil, Soft Murum hard murum, with all lead & Lift and depositing as directed by Engineer in charge including 1 % Cess on Labour Welfare etc.complete

-

-

-

... More
Barloni No.1

122

-

31.75

... More
Barloni No.2

238

-

31.75

... More
Item No.4 : Excavation in all kinds of Soils & Soft murum including boulders up to 0.6 m diameter (0.113cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
Barloni No.1

481

-

31.75

... More
Barloni No.2

209

-

31.75

... More
Item No.5 : Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
Barloni No.1

722

-

40.9

... More
Barloni No.2

387

-

40.9

... More
Item No.6 : Excavation in Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for COT / WW Bar & Flank Wall / Tail & Approach Channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
Barloni No.1

788

-

52.9

... More
Barloni No.2

450

-

52.9

... More
Item No.9 : Providing cut off trench filling using selected impervious soil from approved borrow areas including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
Including Watering & Consolidation by Mechanical Means .

-

-

-

... More
Barloni No.1

1991

-

109.3

... More
Barloni No.2

1046

-

109.3

... More
tem No. 8 : Providing hearting embankment using selected impervious material available directly from excavation in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
Including Watering & Consolidation By Other Than Mechanical Means .

-

-

-

... More
Barloni No.1

185

-

34.9

... More
Item No.9 : Providing hearting embankment using selected impervious soil from approved borrow areas in layers including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
Including Watering & Consolidation By Other Than Mechanical Means .

-

-

-

... More
Barloni No.1

220

-

88.75

... More
Item No. 10 : Providing casing embankment using selected pervious material available directly from excavation , laying in layers including cost of all materials, machinery, labour, all other operations such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, including watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor / excluding compaction etc., complete with all lead and lift excluding royalty charges including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
A ) Top Shrunked Portion

-

-

-

... More
Including Watering & Compaction with vibratory compacter

-

-

-

... More
Barloni No.1

752

-

55.6

... More
Barloni No.2

622

-

55.6

... More
B ) U/S Berm & D/S Resectioning

-

-

-

... More
Including Watering & Consolidation By Other Than Mechanical Means .

-

-

-

... More
Barloni No.1

1222

-

44.6

... More
Barloni No.2

704

-

44.6

... More
U/S Berm & D/S Resectioning Including Watering & Consolidation By Other Than Mechanical Means .

-

-

-

... More
Barloni No.1

103

-

109.1

... More
Barloni No.2

46

-

109.1

... More
Item No.12 : Removing dry silt from the drain with all lead & lift and depositing as directed including 1 % Cess for labour welfare etc. comp .

-

-

-

... More
Barloni No.1

158

-

31.75

... More
Barloni No.2

117

-

31.75

... More
Item No. 13 : Providing and constructing 200 mm thick dry rubble stone pitching using stones and stone chips from locally available, excavated materials including labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. Including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
A ) Available Material

-

-

-

... More
Barloni No.1

618

-

47.05

... More
Barloni No.2

770

-

47.05

... More
Item No.14 : Providing and constructing 230 mm thick dry rubble stone pitching using stones and stone chips from approved source from borrow area including cost of all materials, labour, hand packing / wedging stone chips, finishing etc., complete with all lead and all lifts excluding royalty of material. including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
A ) Borrow Material

-

-

-

... More
Barloni No.1

145

-

169.8

... More
Barloni No.2

939

-

169.8

... More
Item No15: Providing and fixing information board of 1.2 x 0.75 m prepared on 16 gauge M.S. sheet with angle iron frame of size 35 X 35 X 3 mm with cross bracing of size 25 X 25 X 3 mm including painting with one coat of zinc chromate storing primer and two coats each of green/white back ground and back side grey store enameled bonded with red retro reflective sheet Engineering grade, border / letters / numeral / arrows coated with non pealable crystal clear protective transparent coat retaining 100% reflection including two angle iron post of size 50X50X5 mm of 3.65 m long inflated at bottom drilled on top and painted in white and black bonds of 30 cm with four numbers high strength of G.I. bolts and nuts of size 10 mm dia. and 20 mm long sheet and angle iron post in one piece without joints including all taxes, conveying, fixing in ground with cement concrete in M-15 block of size 60 X 60 X 75 cm as directed by engineer-in-charge including 1 % Cess for labour welfare etc. complete .

-

-

-

... More
Barloni No.1

1

-

4518.85

... More
Barloni No.2

1

-

4518.85

... More
Item No.16: Royalty Charges For Construction Material

-

-

-

... More
Barloni No.1

35.67

-

141.34

... More
Barloni No.2

230.99

-

141.34

... More
Item No.17 : 1 % Cess For Insurance

-

-

-

... More
Barloni No.1

1

-

4895

... More
Barloni No.2

1

-

5328

... More
Item No.18: CGST 2.50 %

-

-

-

... More
Barloni No.1

1

-

13192

... More
Barloni No.2

1

-

11299

... More
Item No.19 : SGST 2.50 %

-

-

-

... More
Barloni No.1

1

-

13192

... More
Barloni No.2

1

-

11299



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.