Public Works Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date14 Mar 2024
Closing Date21 Mar 2024
Tender Amount₹ 1,02,28,000 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Making a temporary approach road to the structure with necessary machinery and equipment with necessary equipment ,necessary precautions and removing it again from the waterbody as directed ,etc complete.

200

-

-

... More
Removing of old sulphated lime wash/white or colour wash in multiple applications without causing damage to the below stone/brick/plastered surface. Scrubbing (not by scraping which leaves surfaces scarred and scratched ) with bristle brushes and hot water ( Care to be taken if  the surface is weak one it will break down). Hot water should be used if the limewash has an oil or tallow binder. Gentle cleaning with air abrasive tools can be used  if the wall surface is not very week.The final clean will almost invariably have to be carried out by hand scrubbing and rinsed with clean water on completion. The work should be done under supervision of a trained conservator.

681

-

-

... More
Manually removal of vegetation (major trees, climbing plants, creepers) from walls, columns, arches, floor etc in a skilled and careful manner, using appropriate tools and means and without causing any damage to the adjoining parts, including carrying and stacking the dismantled materials including lift/lower upto 11mtrs and lead upto 50 mtrs as directed by the engineer or architect in charge. The exposed surfaces will be coated with a paste made from ammonium sulphamate crystals or with "Tree killer" available in market. In this condition the root system may be left to absorb and die. Large sections of dead wood must not be left within the core. As they decay they will remove support and create voids and weaknesses in the wall. Pull off a well‐established mat of vegetation must be resisted. Tamping, grouting, pointing and resetting of brick / stones especially on wall top, must all be anticipated as remedial work

681

-

-

... More
Sterilizing treatment using Biocide: Masonry covered with algae, lichen, mosses, small plants, etc should be removed with knife blades, spatula and stiff bristle or soft wire brushes. Spray diluted solution of quaternary ammonium based biocide on surface of the masonry with out allowing to spray drift. Leave the treated area for at least one week than brush off as much dead growth as possible. Next again spray a solution of a proprietary biocide and incorporating tribute tin oxide in same manner and clean the surface

10.5

-

-

... More
Lime Mortar 1:1 ( 1 Slaked lime :1 fine sand)

5.5

-

-

... More
Lime Mortar 1:2 ( 1 Slaked lime: 2 Coarse Sand)

7.7

-

-

... More
Random rubble masonry with hard  stones in foundation and plinth  including levelling with lime concete (1 lime:3surkhi:6 coarse sand) with 40mm stone aggregate  upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1Coarse sand)

8

-

-

... More
Coursed rubble masonry  in first sort with hard  stones in foundation and plinth   including levelling with lime concete  upto plinth level with lime mortar 1:1:1(1Lime: 1Surkhi:1course sand)

5

-

-

... More
Masonry work (second sort) , in lime mortar 1:1:1 (1 lime : 1surkhi:1 coarse sand)

3

-

-

... More
Stone consolidation‐removing the loose/damaged stone and reconsolidating with new stone/reusable stone with lime mortar(1:3) wherever ncessary

4

-

-

... More
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of lime mortar 1:3 (1 lime: 3coarse sand) with joints finished flush.

40

-

-

... More
Recessed lime pointing 1:1:1 ( 1 Slaked lime:1 surkhi:1 fine sand)

50

-

-

... More
Providing and fixing stainless steel cramps of required size and shape for anchoring stone wall lining to the backing or securing adjacent stones in stone wall lining in lime mortar 1:2 (1lime : 2 coarse sand), including making the necessary chases in stone and holes in walls wherever required

10

-

-

... More
Providing and fixing copper pins 7.5 cm long 6 mm diameter for securing adjacent stones in stone wall lining in lime mortar 1:2 (1lime : 2coarse sand), including making the necessary chases

20

-

-

... More
Repairing of .5mm to 5 mm wide open joints / cracks in all types of sand stone masonry work including scrapping of loose jointing material from cracks. The inner side to be filled/pointed with polymer mixed lime mortar with wooden trowel and fixing grouting nipple from outer side as directed by Architect. Then apply polymer based lime mortar by injection grouting through 5mm diameter nozzle through the pre fix nipple up to total thickness of existing stone wall and removing the PVC nipple pipe, lime moratr of mix lime & sand 1:1 mix with polymer using katha or other additives to achieve require M 72.21 11. CRACK REPAIRS AND STRUCTURAL STRENGTHENING matching colour and including cost of all materials, labour, machinery, equipment, curing and cleaning the site as directed.

25

-

-

... More
Steel‐rod stitching incracked stone patties, beam,and lintels.Providing and fixing stainless steel rods of 90cms length of which 15cm on either side and cold bending at 90degrees. The stainless steel clamps to be fixed perpendicular to the crack by drilling in stone and fixing with cement and aradite mixture in such a way that the entire length of the rod is in complete contact of the stone and the bent ends are fully inserted in the cracked stone. Use 316 grade stainless steel charge per hole.steel rod charges are counted per kg.Holes with 6mm, 8mm, 10mm or 12mm dia.as per requirement of position.

20

-

-

... More
Dismantling tile work in floors and roofs laid in lime  mortar including stacking material within 50 metres lead For thickness of tiles

32.3

-

-

... More
Careful removal of existing deteriorated/ damaged/ weathered lime plaster without damaging the suurface below it. Caution: Workers have to wear helmet, safety belt and safety gloves Methodology : i. Erect scaffolding enabling the safe platform to work  ii. Use precise tools like scalpe etc, to remove the plaster iii. Take precaution such that surface below the plaster is not damaged.

20

-

-

... More
Providing protective coating of water repellent siloxane (transparent in color) through brush or spray untill complete impregnation over completely cleaned and dried stone or plastered surface to reduce the absorption of water.

50

-

-

... More
Retrofitting of the FOUNDATION WALL WITH PRESSURE Grouting and strengthening with specilized and as directed by the architect,etc complete.

50

-

-

... More
Retrofitting of the stone walls with lime mortar 1:3,removing the stones from damaged part of the walls,finishing the same with similler kind of stone masonry with using and necessary scaffolding, as directed by architect,etc complete.

25

-

-

... More
LINTELS 2.5X0.25X0.25

7

-

-

... More
DECORATIVE BUTTRESS MOTIEFS

24

-

-

... More
DECORATIVE CAPITAL HALF PORTION

8

-

-

... More
Providing and fixing fine chiseled stone trades & Risers of size 45cm X 30cm X 20cm width may be vary as per site condition fixed in Cement morter 1:4 etc. complete.

60

-

-

... More
PLATFORM /DECK 16M X18.2

-

-

-

... More
1.28 A) Excavation for foundation in hard murum and boulders including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete..BR.3 Page No. 102

36

-

-

... More
1.28 B) Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand Bd. E. 1 Page No. 287

7.2

-

-

... More
1.28 C) Providing uncoursed rubble trap /quartzite /gneiss stone masonary in cement mortar 1:5 for piers, abutments, wings, returns, head-walls, parapet etc. including bailing out of water, striking joints of the non exposed faces, pointing the exposed faces with cement mortar 1:3, scaffolding, watering to masonary and etc. complete.

76.8

-

-

... More
1.28 D) Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete.Bd.A.11 Page No. 263

160

-

-

... More
1.28 E) Providing and casting in situ cement concrete M-20 of trap/ granite/ quartzite/ gneiss metal for R.C.C.beams & lintels as per detailed drawings and designs, or as directed centering, formwork, compaction, and roughening the surface if special finish is to be provided and curing (excluding reinforcement) complete.

5.76

-

-

... More
1.28 F) FABRICATION: Providing and fixing mild steel grill railing weighing 20 kg / sqm.with PVC handrail cover and newel post for staircases, including fabricating, fixtures, drilling holes in concrete / other surface, erecting the grill work, necessary welding, fixing by nuts and bolts, fixing PVC handrail cover, with one coat of anticorrosive paint and two coats of oil painting with approved colour and shade, remaking the damaged surface, cleaning, etc. complete. Spec. No. : As directed by Engineer in charge.

52

-

-

... More
Dhunyachi chavi

-

-

-

... More
Removing the plants, vegetation and weeds- from the masonry walls & paving of the structure, cleaning of the all stone surfaces & maintaining them, as directed by architect,etc complete.

250

-

-

... More
Stone cleaning and surface preparation - all stone surface shall be dry and free from contamination such as oil, grease, loose particles, decayed matter, moss, algal growth, laitaince and all traces of mould realease oils and curing compound, lightly grit blasting the surface, cleaning of stone by pressure jet and applying protection of silicon Silaxane coating on it in two coats on dry surface of the stone.apply second coat when first coat gets dried, as directed by architect. etc complete.

500

-

-

... More
Retrofitting of the FOUNDATION WALL WITH PRESSURE Grouting and strengthening with specilized acralic,polymer modified morter under skilled supervision and as directed by the architect,etc complete.

10

-

-

... More
Structural repairs stone masonry-Retrofitting and structural repairs for stone masonry , specialized carving and dressing required to re-make existing carving on stone work cause due to weathering and man made interventions by skilled labour and under skilled supervision , as directed by architect, etc complete.

8

-

-

... More
Providing weathered pointing with lime mortar 1:3 for stone masonary incuding scaffolding % curing complete

100

-

-

... More
providing stone masonary work in cement mortar 1:3 with watering for substructure complete as per drawing and technical specifications- coursed rubble masonary (first sort)

50

-

-

... More
providing & applying required course of a water based UV resistant evercrete top sealant to protect natural stone, bricks, concrete & wooden structures from water intrusion and staining due to water panetration and algue formation etc. complete.

500

-

-

... More
dismantling the r.c.c work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed.

20

-

-

... More
Selfy points (Enter Maximum Rate 4,00,000/- per unit in Column No. 13)

2

-

-

... More
G.S.T 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.