Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Ordnance Factory Board

Thane, Maharashtra

  • Opening Date

    06 Aug 2019

  • Closing Date

    16 Sep 2019

  • Tender Amount

    Refer document

  • EMD

    ₹ 25,031

Summary

Annual Servicing & Maintenance Amc For Servicing And Maintenance Of 10 Nos. Of Forklifters (godrej-6 & Voltas-4) As Per Scope Of Work And Terms & Conditions Enclosed.

Documents
BOQ Items

No BOQs Available

{?sffi 7" EISCLOSUBE TG PR NO. 19R$49B8g1 BTD" zOIfisIzSLg / '/\./ JOB DESCRIPT!CIlrl: ANNUAL SERVICING & MAINTENANCE OF AMC FOR SERVICING AND MAINTENANCE OF 10 NOS. OF FORKI.IFTERS {GODREJ 6 &s VOLTAS 4} AS PER SCOPE OF WORK ANDTERMS & COND|TiO[{S.\,.,-' scCIFE (}r woRK " The period of corttract will be one year from the date of commencemeht of the supply order. The contractor has to place adequate workforce for the preventive and breakdown maintenance of L0 nos. farklifts {06 nos. Godrej & 04 nos. Voltas} at OFA and ensure at least 90% forklifts availability {09 forkrifts} in ail three shifts. Daily two technicians are to be deployed at OFA. The contractor has to comptete atl type of preventive as well as breakdown repair works by their workers. The preventive repair works include washing and cleaning of the forklifts, and general check-up, changing oils and filters, greasing replacing worn out solid rubber tyres. The breakdown repair works includes. minor refairs to engine, repalring and averhauling of sub-assemblies such as gear box, differential, radiators, steer axle, brake system & steering system etc. ! The contractor has to arrange depute persons for all electrical repairs such as overhauling of setf-starter, alternator, drive and.hydraulic motor, .ont*filr, wiring of all electrical system etc. The contractor has to arrange persons for minor welding works and soldering work of radiators, forklift chassis. Equipment for the same will be pravided by oFA. oFA will provide working sFace, electricity, washing area, compressed air and necessary tools. Any special tools other than that of commonly used to be arranged by the contractor if required. OFA will provide spare parts for repairing job, tyres, batteries, and consumables like oils, grease, cotton waste etc. ^til*kltft;;;;;;;;;;* *t" be brought to the repdir shed by forkrift operators of factory and after repairs the same will be tested UV ine same. The driving of forklifts by technicians of the contractor wilt be restricted to repair sheds. Contractors technicians will be allowed inside the factory during general shift working Contractors recnnicians tt.t ," ilUow factory security rules and the mntractor has to submit PVR of the technicians. , Required safety eguipment have to be provided by the contractor. 3. 5. 6. '7 u. g. lCI. L?. 13. ,]t 44 !!. Contd.......2 ,.r'- '' 4r', a No.02 1. Z. 3. 4. PaEe The work should be carried under the supervision of the MT section staff. The work is to be executed without hampering normal production. The firm's representative shauld visit the site before quoting to assess the job properly. The contractor will be responsible for safety of his workmen while they are on the job. He has to provide all safety instructions & safety equipment necessary for carrying out the job. Sr.GMIOFA shall not accept any.liabitity of compensation for any injury to the contractor's workmen For the purpose of entry for the contractor's supervisor and labourer inside the factory, it is the responsibility of the contractor to satisfy the security requirements of the persons, who will be engaged by the contractor for the above job. The General Manager/OFA reserves the right to cancef short close the contract if the work is not satisfactory/ progressed/ completed within stipulated date, mentioned in purchased order, subject to risk purchase action. lnspeetion will be carried out by both'lMT & user sectian representatives after completion of the job. The paymen"t will be done on monthly basis atter getting the satisfactory job completion certificate from the user section. No advance payment will be acceptable. GST & lncome Tax will be deducted as per preyalent rules. 5. 6. ] ft rl 140s48 I LTfi€JafiT ' !sJJ '*' r

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.