The AMCA has issued a formal invitation for competitive bids for the Municipal Corporation project, for Removing Of Chockup And Daily Maintainance Of Existing Drainage Line At Ward No. 11 Vishvasnagar, Harshanagar. in Aurangabad, Maharashtra, with an estimated contract value of Rs. 5,79,143. The bid opening date for this tender is 29-05-2019 and the last date for bid submission is 07-06-2019. Interested bidders for Municipal Corporation tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Municipal Corporation - AMCA Tender

Opening Date29 May 2019
Closing Date7 Jun 2019
Tender Amount₹ 5,79,143 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
FIXING OF SFRC FRAME AND COVER TO MANHOLE CHAMBER/ RECTANGULAR SFRC COVER AND FRAME IN C.C/ M-15 (CONCRETE 1:2:4 PROP.) ETC. COMPLETE. MJP DSR PAGE NO. (AS PER RATE ANALYSIS) ITEM NO. 22 CIRCULAR HD 540/630MM WITH FRAME.

20

10540

527

... More
PROVIDING & SUPPLYING STEEL FIBER REINFORCED CONCRETE [S.F.R.C.] FRAME & COVER HEAVY DUTY/ MEDIUM DUTY OF RECTANGULAR OF CIRCULAR IN SHAPE OF APPROVED MAKE INCLUDING LOADING, UNLOADING, TRANSPROTATION, ALL TAXES ETC. COMPLETE AS DIRECTED BY ENGINEER IN CHARGE. (20 TONES CAPACITY) MJP DSR PAGE NO. MJP/ DSR/

20

42120

2106

... More
REFIXING THE 60/80MM THICK FACTORY MADE PRECAST INTERLOCKING CEMENT CONCRETE PAVING BLOCK (EXCLLUDING COST OF PAVER BLOCK) OF APPROVED SIZE AND SHAPE INCLUDING LAYING PAVING BLOCKS IN POSITION OVER PREPARED 6 MM CRUSHED STONE METAL BED OF 50MM THICK INCLUDING TRANSPORTATION, CUSHANING. ETC. COMPLETE. PWD DSR PAGE NO. 58 ITEM NO. 172

39

4369

112.03

... More
200MM DIA SWG PIPE.

5

700

140.17

... More
RAISING THE MANHOLE CHAMBER WITH NECESSARY BRICK WORK IN CM 1:6 & PLASTER INCLUDING .. ETC.. COMPLETE (PER 30 CM.)

10

12160

1216

... More
FIXING STEEL FIBER REINFORCED CONCRETE [SFRC] COVER HEAVY DUTY/ MEDIUM DUTY OF RECTANGULAR OF CIRCULAR IN CC M-15 ETC. COMPLETE. AS DIRECTED BY ENGINEER IN CHARGE. MJP DSR PAGE NO. (AS PER SANCTIONED RATE OF AMC STORES) ITEM NO. RECT. 1000 X 700 X 75 HD SFRC COVER

15

1652

110.16

... More
DESILTING THE MANHOLE CHAMBERS/ SEWERAGE WORKS ETC. IN WET OR DRY CONDITION INCLUDING LIFT UPTO 1.50 M AS REQUIRED BEYOND WORK SITE, STACKING, SPREADING, INCLUDING NECESSARY GUARDING ETC. (ADD. RS. 18/ CUM FOR EVERY 1.50M ADDITIONAL LIFT)

71.26

49162

689.91

... More
PROVIDING & SUPPLING IN POSITIION STEEL FIBER REINFORCED CONCRETE [SFRC] COVER HEAVY DUTY/ MEDIUM DUTY OF RECTANGULAR OF CIRCULAR IN SHAPE OF APPROVED MAKE INCLUDING LOADING, UNLOADING, TRANSPORTATION, ALL TAXES ETC. COMPLETE. AS DIRECTED BY ENGINEER IN CHARGE. MJP DSR PAGE NO. (AS PER SANCTIONED RATE OF AMC STORS) ITEM NO. RECT. 1000 X 700 X 75 HD SFRC COVER 20 TONNES CAPACITY (WITHOUT FRAME)

15

19590

1306

... More
LOWRING, LAYING AND JOINTING IN PROPER GRADE AND ALIGNMENT STONEWARE PIPES WITH CEMENT JOINTS IN C.M. (1:1) PROPORTION OF FOLLOWING DIAMETERS INCLUDING COST OF CONVEYANCE FROM STORE TO SITE OF WORK JOINTING MATERIAL, LABOUR, GIVING SATISFACTORY HYDRAULIC TESTING ETC. COMPLETE. MJP DSR PAGE NO. SECTION. 9 DSR ITEM NO. 2, PAGE NO. 87, ITEM NO.

-

-

-

... More
PROVIDING ISI STANDARD PIPES INCLUDING ALL TAXES (CENTRAL AND LOCAL) INSPECTION CHARGES, RAILWAY FREIGHT, UNLOADING FROM RAILWAY WAGONS, LOADING INTO TRUCKS, TRANSPORT TO DEPARTMENTAL STORES, UNLOADING, STACKING ETC. COMPLETE. MJP DSR PAGE NO. SECTION 9, DSR ITEM NO. 1 PAGE NO. 87 ITEM NO.

-

-

-

... More
300MM DIA SWG PIPE.

5

1777

355.52

... More
TRANSPORT OF SURPLUS MATERIAL FROM WORK SITE TO ANY DISPOSAL PLACE AS DIRECTED BY ENGINEER IN CHARGE WITH LEAD OF -----KM INCLUDING AND STACKING ETC. COMPLETE. (MJP/ DSR/ 2011-12/LEAD CHART/ PAGE NO. 19) ITEM NO. LEAD OF 5.00KM FOR MANNUAR OR SLUDGE.

71.26

18229

255.82

... More
225MM DIA SWG PIPE.

5

757

151.58

... More
PROVIDING & REPAIRING TO EXISTING MANHOLE CHAMBER AFTER FIXING PIPES WITH NECESSARY BRICK WORK, BENCHING, CHANNELING PLASTERING ETC. COMPLETE. MJP DSR PAGE NO. AS PER ANALYSIS IT. NO.

15

10320

688

... More
EXCAVATION FOR FOUNDATION/ PIPE LINE TRENCHES IN SOFT ROCK & OLD CEMENT AND LINE MASONRY FOUNDATION ASPHALT ROAD INCLUDING REMOVING THE EXCAVATED MATERIAL UPTO A DISTANCE 50M BEYOND THE AREA AND LIFT AS BELOW, STACKING AND SPREADING AS DIRECTED BY ENGINEER IN CHARGE NORMAL DEWATERING, PREPARING THE BED FOR FOUNDATION AND EXCLUDING BACKFILLING ETC. COMPLETE. (BD-A-4/259) LIFT 0 TO 1.50M. MJP DSR PAGE NO. 39 ITEM NO. 5 LIFT O TO 1.50M.

3

1622

540.82

... More
225MM DIA SWG PIPE.

5

1358

271.69

... More
REFILLING AND THE TRENCHES AVAILABLE EXCAVATED STIFF WITH SOFT MATERIAL FIRST OVER PIPLE LINE AND THEN HARD MATERIAL IN 15 CM. LAYERS WITH ALL LEADS AND LIFTS INCLUDING CONSOLIDATION SURCHARGING, ETC COMPLETE. MJP DSR PAGE NO. 36 ITEM NO. 15

21.75

1505

69.2

... More
UPROOTING (REMOVING & DESILTING) FOLLOWING PIPE SWG/ RCC EXCLUDING COST OF NECESSARY EXCAVATION AND REFILLING OF THE TRENCHES, BREAKING THE JOINTS, LIFTING THE PIPES & STACKING TO THE PLACE AS DIRECTED BY ENGINEER IN CHARGE WITH ALL LEADS AND LIFTS INCLUDING CLEANING THE SURFACE ETC. COMPLETE. (I. NO. 12) MJP DSR PAGE NO. MJP/ DSR/ 2013-14/ ITEM NO. 1

-

-

-

... More
100MM DIA. TO 250MM DIA RCC/ SWG PIPE

5000

170000

34

... More
PROVIDING AND CONSTRUCTING BRICK MASONRY IN CEMENT MORTAR 1:6 FOR INSPECTION CHAMBER 90CM X 45CM INCLUDING 1:4:8 C.C. FOUNDATION, 1:2:4 C.C. CHANNELS/ HALF ROUND SWG PIPES, CHANNELS/ HALF ROUND GLAZED STONEWARE INTERCEPTING TRAP WITH RODING PIPE SET IN 1:4:8 CEMENT CONCRETE BLOCKS, WITH PLASTERING BRIOCK MASONRY INSIDE AND OUT SIDE WITH CEMENT MORTAR 1:4 AND INSIDE NEAT CEMENT FINISH INCLUDING 75MM THICK RCC COVER ETC. COMPLETE. SPEC.NO. BD.V.44 PAGE NO. 574. PWD DSR 2015-16 PAGE NO. 208 ITEM NO. 736.

5

43990

8798

... More
REMOVING FACTORY MADE PRECAST INTERLOCKING CEMENT CONCRETE PAVING BLOCK (EXCELLUDING COST OF PAVER BLOCKS) OF APPROVED SIZE & SHAPE INCLUDING LAYING PAVING BLOCKS IN POSITION OVER PREPARED 6MM CRUSHED STONE METAL BED OF 50MM THICK INCLUDING.. ETC. COMPLETE. PWD DSR PAGE NO. 167 ITEM NO. 662

39

1033

26.5

... More
PROVIDING AND CONSTRUCTING ON DRAINAGE LINE B.B. MASONRY CIRCULAR MANHOLE, CONCENTRIC CONE 0.90 MTRS. DIA AT BOTTOM AND 0.5 MTRS. DIA AT TIP AND UP TO A DEPTH OF 1.50 MTRS. WITH 23 CM THICK BRICK WORK IN C.M. 1:6 PROP. WITH 12MM THICK CEMENT PLASTER IN 1:4 WITH SMOOTH RENDERING 1:2:4 COPING & FIXING APPROVED MAKE AND QUALITY S.F.R.C. FRAME & COVER OF 56 CM DIA ETC. INCLUDING ALL NECESSARY EXCAVATION & 1:5:10 BED CC. ETC. ALL COMPLETE AS DIRECTED BY ENGINEER IN CHARGE (REBATE FOR EVERY DECREASE IN DEPTH OF 3 CM OR PART THERE OF RS. 1383/- PER 30 CM) MJP DSR PAGE NO AS PER RATE ANALYSIS ITEM NO. DEPTH -1.20 MTR

7

79940

11420

... More
EXCAVATION FOR FOUNDATION/ PIPE LINE TRENCHES IN EARTH, SOIL OF ALL TYPES, SAND, GRAVEL AND SOFT MURUM, INCLUDING REMOVING THE EXCAVATED MATERIAL UPTO A DISTACE 50 MTR. & LIFT AS BELOW, STACKING AND SPREADING AS DIRECTED, NORMAL DEWATERING, PREPARING THE BED FOR FOUNDATION AND EXCLUDING BACKFILLING ETC. COMPLETE. (BD-A-1/259) LIFT 0 TO 1.50M. MJP DSR PAGE NO. 33 ITEM NO. 1

16.5

2534

153.58

... More
100MM TO 250MM DIA. SWG PIPE.

5

163

32.76

... More
250MM DIA. TO 450MM DIA RCC/ SWG PIPE

2500

102500

41

... More
300MM DIA SWG PIPE.

5

280

56.09

... More
100MM TO 250MM DIA. RCC PIPE.

5

215

43.05

... More
RODDING AND REMOVING CHOCK UP OF EXISTING DRAINAGE LINE INCLUDING REQUIRED DEWATERING, DESILTING OF MANHOLES, DESILTING THE EXISTING DRAINAGE LINE USING RODDING, REMOVING & REFIXING MANHOLE COVER, PLUGGING DRAINAGE LINE STACKING THE SILT AS DIRECTED, CONTROLLING TRAFFIC, PROVIDING LANTERN, LIGHT ETC. IF REQUIRED PROVIDING CAUTIONARY/ WARNING TRAFFIC SIGN BOARDS, PROVIDING NECESSARY SECURITY ARRANGEMENTS, CLEANING SITE AFTER WORK, GETTING APPROVAL FOR CLEANING WORK ETC. COMPLETE. MJP DSR PAGE NO. AS PER ANALYSIS ITEM NO. 100MM DIA TO 250MM DIA RCC/ SWG PIPE.

-

-

-

... More
200MM DIA SWG PIPE.

5

700

140.17



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.