Municipal Corporation Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Municipal Corporation - AMCA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date12 Aug 2024
Closing Date19 Aug 2024
Tender Amount₹ 4,19,607
Costs
EMD
₹ 4,196Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AMCA_1069201_1Bid Award Id
ViewTender No
CSMC/EE/DYENG/ZONE01/2024/776Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://aurangabadmahapalika.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge. normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete.(Bd-A-3/259) Lift 0 to 1 .5 M (SSR No. Section E Particular No - 3)
26
5476
210.62
Providing ISI standard stonewere pipes, joints, including all taxes(Central and local),inspection charges, railway freight, loading unloading from railway wagons, loading into trucks, transport to departmental stores/ stacking,etc.complete. MJP DSR item no 1 Page No 87 (250mm dia SWG pipe). (SSR No. As Per Market Rate Analysis)
130
66924
514.8
Lowering, laying and jointing in proper grade and alignment Stoneware pipes with cement joints in CM1:1 proportion following diameter including cost of conveyance from stores to site of works, cost of jointing material, labour, giving hydraulic testing, etc.complete MJP DSR page no . Section 9, DSR item no 2 page no 87 (250mm dia SWG pipe). (SSR No. As Per Rate Analysis)
130
22522
173.25
Providing and constructing on sewer, B. B. masonry circular manhole with concentric cone 0.9 M dia. at bottom and 0.5 M dia. at top and upto a depth of 1.0M with 23 cm brick work in CM 1:4 proportion smooth rendering, Rebate of 2300 per 30 cm 0.90m as per rate analysis. (1.5m depth) (SSR No. As Per Rate Analysis)
13
200993
15461
Refilling the trenches with available excavated stuff with soft material first over pipe line and then hard material in 15cm layers with all leads and lfts including consolidation, surcharging, etc. complete. (SSR No. As Per Rate Analysis)
156
13739
88.07
Providing steel fiber reinforced concrete (S.F.R.C.) frame, cover heavy duty/ medium duty of rectangular or circular in shape of approved make including loading unloading, transportation, all taxes etc. complete as directed by engineer in charge (as per 18 circular HD 540/630mm with frame. (SSR No. As Per Rate Analysis)
15
47820
3188
Repairing and Reconstructing/ Raising B.B. masonry circular manhole of 1.0m dia.without conical shape excluding excavation, brick masonry in CM 1:4 proportion 23 cm thick, plastering with smooth finish in CM 1:2 proportion, fixing S.F.R.C. frame and co ver (Excluding cost of SFRC Cover) including cost of all materials and labour, etc. complete.(SSR No. As Per Rate Analysis)
2.5
17535
7014
Fixing of SFRC frame and cover to manhole chamber / rectangular S.F.R.C. cover and frame in c.c. M-15 (concrete 1:2:4 prop) etc. complete (as per rate analysis) 22-circular HD 540/630 with frame. (SSR No. As Per Sanctioned Rate)
4
2628
657
Transportation of surplus material from work site to any disposal place as directed by the Engineer - in - charge with a lead of ___3.00____ km including and stacking etc. complete. (SSR No. As Per Rate Analysis)
20.8
5387
259.01
Royalty as per govertment of maharastra revenue and forest departmentsgazettle no 67 date 15 may 2015 ( charges for metal, sand, murum )…etc complete. (SSR No. As Per Rate Analysis)
14.82
3517
237.37