Municipal Corporation Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Municipal Corporation - AMCA Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date14 Sep 2022
Closing Date21 Sep 2022
Tender Amount₹ 1,45,972
Costs
EMD
₹ 1,460Document Cost
₹ 300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_AMCA_829671_2Bid Award Id
ViewTender No
AMC/DE/WW/Zone No.1,2,9/2022/241Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://http://aurangabadmahapalika.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc comp. Lift 0 to 1.50 M MJP/SSR/2021-22/Page no.43 I.No. 7
15
-
1118.7
Providing and supplying C.I.detachable joints suitable for A.C. pressure pipes manufactured as per IS- 1538 / 1993 standards of following class and diameter including cost o insurance, railway freight, wagon loading into truck, transproting to deparmental store, unloading, stacking and cost of rubber rings, nut bolts, excluding GST levied by GOI & GOM in all respect etc. complete. MJP/SSR/2021-22/Page no.75 I.No. 13
-
-
-
100 mm
10
-
353
Making cross connection to existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-in-charge for following diameters of existing pipeline, irrespective of diameter of branch line. ( The number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores) MJP/SSR/2021-22/Page no.60 I.No. 10
-
-
-
100 mm
2
-
2980.95
Providing double flanged Sluice Valves confirming to IS- 2906 / 14846 including worm gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. PN-1.0 ( without bypass arrangement) MJP/SSR/2021-22/Page no.132 I.No. 2(A)
-
-
-
100 mm
4
-
6835
150 mm
1
-
10251
Lowering laying and jointing in position following C.I. D/F Reflux Valves, Butterfly Valves and Sluice Valves including cost of all labour, jointing material, including nut bolts and giving satisfactory hydraulic testing, etc complete. (Sluice Valves) MJP/SSR/2021-22/Page no.135 I.No. 4
-
-
-
100 mm
4
-
2385.6
150 mm
1
-
3748.5
Removing existing cross connection and remaking the same etc complete (70%Rate of making cross connection.) MJP/DSR/2021-2022/Page no.60. I.No.10
-
-
-
100 mm
1
-
2086.67
150 mm
2
-
2561.48
Removing and refixing the half body of sluice valve including excavation, refilling, cost of rubber packing, nut bolts, with gate, gland rope, repair by welding etc complete (70 % Rate of laying Sluice valve) MJP/SSR/2021-22/Page no.135 I.No. 4
-
-
-
100 mm
2
-
1669.92
150 mm
2
-
2623.95
Providing and supplying ISI standard CI flanged / S& S specials including all statutory duties & taxes such as GST levied by GOI & GOM in all respect, railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store /site, unloading stacking etc. complete. MJP/SSR/2021-22/Page no.72 I.No. 6(C)
128.6
-
68
Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004. Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below. MJP/SSR/2021-22/Page no.82 I.No. 1
-
-
-
50 mm
60
-
330
Lowering, laying and jointing G. I. pipes and
specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. MJP/SSR/2021-22/Page no.82 I.No. 2
-
-
-
50 mm
60
-
75.6
Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc.complete. MJP/SSR/2021-22/Page no.45 I.no.15
63.9
-
88.2