Municipal Corporation Of Greater Mumbai Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Municipal Corporation Of Greater Mumbai - MCGM Tender

Works
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date31 May 2024
Closing Date19 Jun 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Project Management Consultancy Services For The Work Of Mumbai Coastal Road Project Package A And B

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Project Director (Team Leader) (1nos) - Cost for Third year

12

-

-

... More
Project Director (Team Leader) (1nos) - Cost for Fourth year

12

-

-

... More
Project Director (Team Leader) (1nos) - Cost for Four and half year

6

-

-

... More
Deputy Project Director (1nos) - Cost for First year

12

-

-

... More
Deputy Project Director (1nos) - Cost for Second year

12

-

-

... More
Deputy Project Director (1nos) - Cost for Third year

12

-

-

... More
Deputy Project Director (1nos) - Cost for Fourth year

12

-

-

... More
Deputy Project Director (1nos) - Cost for Four and half year

6

-

-

... More
Resident Engineer (2nos) - Cost for First year

12

-

-

... More
Resident Engineer (2nos) - Cost for Second year

24

-

-

... More
Resident Engineer (2nos) - Cost for Third year

24

-

-

... More
Resident Engineer (2nos) - Cost for Fourth year

24

-

-

... More
Resident Engineer (2nos) - Cost for Four and half year

12

-

-

... More
Quality cum Material Expert (1nos) - Cost for First year

6

-

-

... More
Quality cum Material Expert (1nos) - Cost for Second year

12

-

-

... More
Quality cum Material Expert (1nos) - Cost for Third year

12

-

-

... More
Quality cum Material Expert (1nos) - Cost for Fourth year

12

-

-

... More
Quality cum Material Expert (1nos) - Cost for Four and half year

6

-

-

... More
Senior Cable Stay Bridge Design Expert (1nos) - Cost for First year

6

-

-

... More
Senior Cable Stay Bridge Design Expert (1nos) - Cost for Second year

12

-

-

... More
Senior Cable Stay Bridge Design Expert (1nos) - Cost for Third year

12

-

-

... More
Senior Cable Stay Bridge Design Expert (1nos) - Cost for Fourth year

12

-

-

... More
Senior Cable Stay Bridge Design Expert (1nos) - Cost for Four and half year

6

-

-

... More
Construction Safety Expert (1nos) - Cost for First year

6

-

-

... More
Construction Safety Expert (1nos) - Cost for Second year

12

-

-

... More
Construction Safety Expert (1nos) - Cost for Third year

12

-

-

... More
Construction Safety Expert (1nos) - Cost for Fourth year

9

-

-

... More
Construction Safety Expert (1nos) - Cost for Four and half year

3

-

-

... More
Senior Bridge Expert (1nos) - Cost for First year

6

-

-

... More
Senior Bridge Expert (1nos) - Cost for Second year

12

-

-

... More
Senior Bridge Expert (1nos) - Cost for Third year

12

-

-

... More
Senior Bridge Expert (1nos) - Cost for Fourth year

9

-

-

... More
Senior Bridge Expert (1nos) - Cost for Four and half year

3

-

-

... More
Chief Program Control Expert (1nos) - Cost for First year

6

-

-

... More
Chief Program Control Expert (1nos) - Cost for Second year

12

-

-

... More
Chief Program Control Expert (1nos) - Cost for Third year

12

-

-

... More
Chief Program Control Expert (1nos) - Cost for Fourth year

9

-

-

... More
Chief Program Control Expert (1nos) - Cost for Four and half year

3

-

-

... More
Chief Environmental Specialist (1nos) - Cost for First year

12

-

-

... More
Chief Environmental Specialist (1nos) - Cost for Second year

12

-

-

... More
Chief Environmental Specialist (1nos) - Cost for Third year

12

-

-

... More
Chief Environmental Specialist (1nos) - Cost for Fourth year

9

-

-

... More
Chief Environmental Specialist (1nos) - Cost for Four and half year

3

-

-

... More
Geotechnical Expert (1nos) - Cost for First year

12

-

-

... More
Geotechnical Expert (1nos) - Cost for Second year

12

-

-

... More
Geotechnical Expert (1nos) - Cost for Third year

12

-

-

... More
Geotechnical Expert (1nos) - Cost for Fourth year

9

-

-

... More
Geotechnical Expert (1nos) - Cost for Four and half year

3

-

-

... More
Contract Administrator / Expert Manager (1nos) - Cost for First year

12

-

-

... More
Contract Administrator / Expert Manager (1nos) - Cost for Second year

12

-

-

... More
Contract Administrator / Expert Manager (1nos) - Cost for Third year

12

-

-

... More
Contract Administrator / Expert Manager (1nos) - Cost for Fourth year

12

-

-

... More
Contract Administrator / Expert Manager (1nos) - Cost for Four and half year

6

-

-

... More
Disaster Management Expert (1nos) - Cost for First year

6

-

-

... More
Disaster Management Expert (1nos) - Cost for Second year

12

-

-

... More
Disaster Management Expert (1nos) - Cost for Third year

12

-

-

... More
Disaster Management Expert (1nos) - Cost for Fourth year

9

-

-

... More
Disaster Management Expert (1nos) - Cost for Four and half year

3

-

-

... More
Non-Key Staff Note: - the bidder are required to input the cost of Non-Key staff for second year after considering 3% escalation to the base price i.e. the cost of man-month of Non-key staff in first year). Similarly, For third Year, 6% escaltion to the base price. For Fourth Year, 9% escaltion to the base price. For Four and Half Year, 10.5% escaltion on the base price

-

-

-

... More
Assistant Resident Engineer (8nos) - Cost for First year

48

-

-

... More
Assistant Resident Engineer (8nos) - Cost for Second year

96

-

-

... More
Assistant Resident Engineer (8nos) - Cost for Third year

96

-

-

... More
Assistant Resident Engineer (8nos) - Cost for Fourth year

96

-

-

... More
Quality cum Material Engineer (2nos) - Cost for First year

12

-

-

... More
Quality cum Material Engineer (2nos) - Cost for Second year

24

-

-

... More
Quality cum Material Engineer (2nos) - Cost for Third year

24

-

-

... More
Quality cum Material Engineer (2nos) - Cost for Fourth year

24

-

-

... More
Cable Stay Bridge Design Engineer (2nos) - Cost for First year

12

-

-

... More
Cable Stay Bridge Design Engineer (2nos) - Cost for Second year

24

-

-

... More
Cable Stay Bridge Design Engineer (2nos) - Cost for Third year

24

-

-

... More
Cable Stay Bridge Design Engineer (2nos) - Cost for Fourth year

24

-

-

... More
Site Safety Engineer (4nos) - Cost for First year

48

-

-

... More
Site Safety Engineer (4nos) - Cost for Second year

48

-

-

... More
Site Safety Engineer (4nos) - Cost for Third year

48

-

-

... More
Site Safety Engineer (4nos) - Cost for Fourth year

48

-

-

... More
Site Safety Engineer (4nos) - Cost for Four and half year

24

-

-

... More
Electrical & Mechanical Engineer (2nos) - Cost for First year

12

-

-

... More
Electrical & Mechanical Engineer (2nos) - Cost for Second year

24

-

-

... More
Electrical & Mechanical Engineer (2nos) - Cost for Third year

24

-

-

... More
Electrical & Mechanical Engineer (2nos) - Cost for Fourth year

18

-

-

... More
Electrical & Mechanical Engineer (2nos) - Cost for Four and half year

6

-

-

... More
Manager Program Control (1nos) - Cost for First year

6

-

-

... More
Manager Program Control (1nos) - Cost for Second year

12

-

-

... More
Manager Program Control (1nos) - Cost for Third year

12

-

-

... More
Manager Program Control (1nos) - Cost for Fourth year

12

-

-

... More
Manager Program Control (1nos) - Cost for Four and half year

6

-

-

... More
Geotechnical Engineer (2nos) - Cost for First year

24

-

-

... More
Geotechnical Engineer (2nos) - Cost for Second year

24

-

-

... More
Geotechnical Engineer (2nos) - Cost for Third year

18

-

-

... More
Geotechnical Engineer (2nos) - Cost for Fourth year

12

-

-

... More
Geotechnical Engineer (2nos) - Cost for Four and half year

6

-

-

... More
Bridge Engineer (Special Bridges) (2nos) - Cost for First year

12

-

-

... More
Bridge Engineer (Special Bridges) (2nos) - Cost for Second year

24

-

-

... More
Bridge Engineer (Special Bridges) (2nos) - Cost for Third year

24

-

-

... More
Bridge Engineer (Special Bridges) (2nos) - Cost for Fourth year

18

-

-

... More
Bridge Engineer (Special Bridges) (2nos) - Cost for Four and half year

6

-

-

... More
Traffic and Transportation Engineer (1nos) - Cost for First year

12

-

-

... More
Traffic and Transportation Engineer (1nos) - Cost for Second year

12

-

-

... More
Traffic and Transportation Engineer (1nos) - Cost for Third year

9

-

-

... More
Traffic and Transportation Engineer (1nos) - Cost for Fourth year

9

-

-

... More
Utility Management Engineer (2nos) - Cost for First year

24

-

-

... More
Utility Management Engineer (2nos) - Cost for Second year

18

-

-

... More
Utility Management Engineer (2nos) - Cost for Third year

18

-

-

... More
Utility Management Engineer (2nos) - Cost for Fourth year

12

-

-

... More
Survey Engineer (4nos) - Cost for First year

48

-

-

... More
Survey Engineer (4nos) - Cost for Second year

48

-

-

... More
Survey Engineer (4nos) - Cost for Third year

36

-

-

... More
Survey Engineer (4nos) - Cost for Fourth year

36

-

-

... More
Quantity Surveyor (2nos) - Cost for First year

24

-

-

... More
Quantity Surveyor (2nos) - Cost for Second year

24

-

-

... More
Quantity Surveyor (2nos) - Cost for Third year

24

-

-

... More
Quantity Surveyor (2nos) - Cost for Fourth year

24

-

-

... More
Program management & Database engineer (5nos) - Cost for First year

30

-

-

... More
Program management & Database engineer (5nos) - Cost for Second year

60

-

-

... More
Program management & Database engineer (5nos) - Cost for Third year

60

-

-

... More
Program management & Database engineer (5nos) - Cost for Fourth year

60

-

-

... More
Program management & Database engineer (5nos) - Cost for Four and half year

30

-

-

... More
CAD Operator Civil (3nos) - Cost for First year

36

-

-

... More
CAD Operator Civil (3nos) - Cost for Second year

36

-

-

... More
CAD Operator Civil (3nos) - Cost for Third year

18

-

-

... More
CAD Operator Civil (3nos) - Cost for Fourth year

18

-

-

... More
CAD Operator Civil (3nos) - Cost for Four and half year

18

-

-

... More
CAD Operator Electrical (3nos) - Cost for First year

36

-

-

... More
CAD Operator Electrical (3nos) - Cost for Second year

18

-

-

... More
CAD Operator Electrical (3nos) - Cost for Third year

18

-

-

... More
CAD Operator Electrical (3nos) - Cost for Fourth year

18

-

-

... More
CAD Operator Electrical (3nos) - Cost for Four and half year

18

-

-

... More
CAD operator Signals & Telecommunication (1nos) - Cost for First year

3

-

-

... More
CAD operator Signals & Telecommunication (1nos) - Cost for Second year

3

-

-

... More
CAD operator Signals & Telecommunication (1nos) - Cost for Third year

6

-

-

... More
CAD operator Signals & Telecommunication (1nos) - Cost for Fourth year

6

-

-

... More
CAD operator Signals & Telecommunication (1nos) - Cost for Four and half year

6

-

-

... More
Environment/ Forest Expert (2nos) - Cost for First year

24

-

-

... More
Environment/ Forest Expert (2nos) - Cost for Second year

12

-

-

... More
Environment/ Forest Expert (2nos) - Cost for Third year

12

-

-

... More
Environment/ Forest Expert (2nos) - Cost for Fourth year

12

-

-

... More
Environment/ Forest Expert (2nos) - Cost for Four and half year

12

-

-

... More
Social Expert (1nos) - Cost for First year

12

-

-

... More
Social Expert (1nos) - Cost for Second year

6

-

-

... More
Social Expert (1nos) - Cost for Third year

6

-

-

... More
Social Expert (1nos) - Cost for Fourth year

6

-

-

... More
Social Expert (1nos) - Cost for Four and half year

6

-

-

... More
Project Management Software Engineer (4nos) - Cost for First year

48

-

-

... More
Project Management Software Engineer (4nos) - Cost for Second year

48

-

-

... More
Project Management Software Engineer (4nos) - Cost for Third year

48

-

-

... More
Project Management Software Engineer (4nos) - Cost for Fourth year

48

-

-

... More
Project Management Software Engineer (4nos) - Cost for Four and half year

24

-

-

... More
Support Staff Note: - the bidder are required to input the cost of Support staff for second year after considering 3% escalation to the base price i.e. the cost of man-month of Support staff in first year). Similarly, For third Year, 6% escaltion to the base price. For Fourth Year, 9% escaltion to the base price. For Four and Half Year, 10.5% escaltion on the base price.

-

-

-

... More
Office Manager (1nos) - Cost for First year

12

-

-

... More
Office Manager (1nos) - Cost for Second year

12

-

-

... More
Office Manager (1nos) - Cost for Third year

12

-

-

... More
Office Manager (1nos) - Cost for Fourth year

12

-

-

... More
Office Manager (1nos) - Cost for Four and half year

6

-

-

... More
Document Controller (2nos) - Cost for First year

24

-

-

... More
Document Controller (2nos) - Cost for Second year

24

-

-

... More
Document Controller (2nos) - Cost for Third year

24

-

-

... More
Document Controller (2nos) - Cost for Fourth year

24

-

-

... More
Document Controller (2nos) - Cost for Four and half year

12

-

-

... More
Accountant cum cashier (1nos) - Cost for First year

12

-

-

... More
Accountant cum cashier (1nos) - Cost for Second year

12

-

-

... More
Accountant cum cashier (1nos) - Cost for Third year

12

-

-

... More
Accountant cum cashier (1nos) - Cost for Fourth year

12

-

-

... More
Accountant cum cashier (1nos) - Cost for Four and half year

6

-

-

... More
Secretary (1nos) - Cost for First year

12

-

-

... More
Secretary (1nos) - Cost for Second year

12

-

-

... More
Secretary (1nos) - Cost for Third year

12

-

-

... More
Secretary (1nos) - Cost for Fourth year

12

-

-

... More
Secretary (1nos) - Cost for Four and half year

6

-

-

... More
Office Assistance/Computer operator (6nos) - Cost for First year

72

-

-

... More
Office Assistance/Computer operator (6nos) - Cost for Second year

72

-

-

... More
Office Assistance/Computer operator (6nos) - Cost for Third year

72

-

-

... More
Office Assistance/Computer operator (6nos) - Cost for Fourth year

72

-

-

... More
Office Assistance/Computer operator (6nos) - Cost for Four and half year

36

-

-

... More
Stenographer (5nos) - Cost for First year

60

-

-

... More
Stenographer (5nos) - Cost for Second year

60

-

-

... More
Stenographer (5nos) - Cost for Third year

60

-

-

... More
Stenographer (5nos) - Cost for Fourth year

60

-

-

... More
Stenographer (5nos) - Cost for Four and half year

30

-

-

... More
Office boy. (4nos) - Cost for First year

48

-

-

... More
Office boy. (4nos) - Cost for Second year

48

-

-

... More
Office boy. (4nos) - Cost for Third year

48

-

-

... More
Office boy. (4nos) - Cost for Fourth year

48

-

-

... More
Office boy. (4nos) - Cost for Four and half year

24

-

-

... More
Duty travel to Site (to be paid as per actuals within the Total Cost) Note: - The bidder are required to input the cost of vehicle per month for second year after considering 3% escalation to the base price i.e. the cost of vehicle per month for Duty travel Vehicles to Site in first year. Similarly, For third Year, 6% escaltion to the base price. For Fourth Year, 9% escaltion to the base price. For Four and Half Year, 10.5% escaltion on the base price

-

-

-

... More
AC Vehicles (5 Seater) (5nos) - Cost for First year

60

-

-

... More
AC Vehicles (5 Seater) (5nos) - Cost for Second year

60

-

-

... More
AC Vehicles (5 Seater) (5nos) - Cost for Third year

60

-

-

... More
AC Vehicles (5 Seater) (5nos) - Cost for Fourth year

60

-

-

... More
AC Vehicles (5 Seater) (5nos) - Cost for Four and half year

30

-

-

... More
Non-AC Vehicles (5 to 8 Seater) (5nos) - Cost for First year

60

-

-

... More
Non-AC Vehicles (5 to 8 Seater) (5nos) - Cost for Second year

60

-

-

... More
Non-AC Vehicles (5 to 8 Seater) (5nos) - Cost for Third year

60

-

-

... More
Non-AC Vehicles (5 to 8 Seater) (5nos) - Cost for Fourth year

60

-

-

... More
Non-AC Vehicles (5 to 8 Seater) (5nos) - Cost for Four and half year

30

-

-

... More
Hirecharges for 2 wheelers (20nos) - Cost for First year

240

-

-

... More
Hirecharges for 2 wheelers (20nos) - Cost for Second year

240

-

-

... More
Hirecharges for 2 wheelers (20nos) - Cost for Third year

240

-

-

... More
Hirecharges for 2 wheelers (20nos) - Cost for Fourth year

240

-

-

... More
Hirecharges for 2 wheelers (20nos) - Cost for Four and half year

120

-

-

... More
Hirecharges for Boats with operator, fuel etc. (2nos) - Cost for Second year

4

-

-

... More
Hirecharges for Boats with operator, fuel etc. (2nos) - Cost for Third year

6

-

-

... More
Hirecharges for Boats with operator, fuel etc. (2nos) - Cost for Fourth year

6

-

-

... More
Hirecharges for Boats with operator, fuel etc. (2nos) - Cost for Four and half year

4

-

-

... More
Rent for office accommodation Note: - the bidder are required to input the cost of Support staff for second year after considering 3% escalation to the base price i.e. the cost of man-month of Support staff in first year). Similarly, For third Year, 6% escaltion to the base price. For Fourth Year, 9% escaltion to the base price. For Four and Half Year, 10.5% escaltion on the base price.

-

-

-

... More
Rent for additional accommodation including cost of interiors, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services etc. paybale shall be - Cost for First year

12

-

-

... More
Rent for additional accommodation including cost of interiors, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services etc. paybale shall be - Cost for Second year

12

-

-

... More
Rent for additional accommodation including cost of interiors, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services etc. paybale shall be - Cost for Third year

12

-

-

... More
Rent for additional accommodation including cost of interiors, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services etc. paybale shall be - Cost for Fourth year

12

-

-

... More
Rent for additional accommodation including cost of interiors, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services etc. paybale shall be - Cost for Four and half year

6

-

-

... More
Cost of furnishing, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services, etc. payable for the rent free office space to be provided by the Client shall be: - Cost for First year

12

-

-

... More
Cost of furnishing, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services, etc. payable for the rent free office space to be provided by the Client shall be: - Cost for Second year

12

-

-

... More
Cost of furnishing, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services, etc. payable for the rent free office space to be provided by the Client shall be: - Cost for Third year

12

-

-

... More
Cost of furnishing, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services, etc. payable for the rent free office space to be provided by the Client shall be: - Cost for Fourth year

12

-

-

... More
Cost of furnishing, air conditioning as required, maintenance, cleaning, repairs, water charges, electricity charges, (including standby) security, insurance and other services, etc. payable for the rent free office space to be provided by the Client shall be: - Cost for Four and half year

6

-

-

... More
Hiring of Onsite Servers with Data Security Software, operating system, backup cloud etc. - Cost for First year

12

-

-

... More
Hiring of Onsite Servers with Data Security Software, operating system, backup cloud etc. - Cost for Second year

12

-

-

... More
Hiring of Onsite Servers with Data Security Software, operating system, backup cloud etc. - Cost for Third year

12

-

-

... More
Hiring of Onsite Servers with Data Security Software, operating system, backup cloud etc. - Cost for Fourth year

12

-

-

... More
Hiring of Onsite Servers with Data Security Software, operating system, backup cloud etc. - Cost for Four and half year

12

-

-

... More
Hiring space from Data Center - Cost for First year

12

-

-

... More
Hiring space from Data Center - Cost for Second year

12

-

-

... More
Hiring space from Data Center - Cost for Third year

12

-

-

... More
Hiring space from Data Center - Cost for Fourth year

12

-

-

... More
Hiring space from Data Center - Cost for Four and half year

12

-

-

... More
Subscription of Specialised Software for Project along with trained manpower Application Engineers & database administration - Cost for First year

12

-

-

... More
Subscription of Specialised Software for Project along with trained manpower Application Engineers & database administration - Cost for Second year

12

-

-

... More
Subscription of Specialised Software for Project along with trained manpower Application Engineers & database administration - Cost for Third year

12

-

-

... More
Subscription of Specialised Software for Project along with trained manpower Application Engineers & database administration - Cost for Fourth year

12

-

-

... More
Subscription of Specialised Software for Project along with trained manpower Application Engineers & database administration - Cost for Four and half year

12

-

-

... More
Hiring of Hardware (75nos) - Cost for First year

900

-

-

... More
Hiring of Hardware (75nos) - Cost for Second year

900

-

-

... More
Hiring of Hardware (75nos) - Cost for Third year

900

-

-

... More
Hiring of Hardware (75nos) - Cost for Fourth year

900

-

-

... More
Hiring of Hardware (75nos) - Cost for Four and half year

450

-

-

... More
Office Supplies, Utilities and Communications & Misc. charges Note: - the bidder are required to input the cost of Support staff for second year after considering 3% escalation to the base price i.e. the cost of man-month of Support staff in first year). Similarly, For third Year, 6% escaltion to the base price. For Fourth Year, 9% escaltion to the base price. For Four and Half Year, 10.5% escaltion on the base price.

-

-

-

... More
Office Supplies - Stationaries - Cost for First year

12

-

-

... More
Office Supplies - Stationaries - Cost for Second year

12

-

-

... More
Office Supplies - Stationaries - Cost for Third year

12

-

-

... More
Office Supplies - Stationaries - Cost for Fourth year

12

-

-

... More
Office Supplies - Stationaries - Cost for Four and half year

6

-

-

... More
Office Supplies - Others - Cost for First year

12

-

-

... More
Office Supplies - Others - Cost for Second year

12

-

-

... More
Office Supplies - Others - Cost for Third year

12

-

-

... More
Office Supplies - Others - Cost for Fourth year

12

-

-

... More
Office Supplies - Others - Cost for Four and half year

6

-

-

... More
Telephone (1nos) - Cost for First year

12

-

-

... More
Telephone (1nos) - Cost for Second year

12

-

-

... More
Telephone (1nos) - Cost for Third year

12

-

-

... More
Telephone (1nos) - Cost for Fourth year

12

-

-

... More
Telephone (1nos) - Cost for Four and half year

6

-

-

... More
Mobile Handset type A (50nos) - Cost for First year

600

-

-

... More
Mobile Handset type A (50nos) - Cost for Second year

600

-

-

... More
Mobile Handset type A (50nos) - Cost for Third year

600

-

-

... More
Mobile Handset type A (50nos) - Cost for Fourth year

600

-

-

... More
Mobile Handset type A (50nos) - Cost for Four and half year

300

-

-

... More
Mobile Handset type B (25nos) - Cost for First year

300

-

-

... More
Mobile Handset type B (25nos) - Cost for Second year

300

-

-

... More
Mobile Handset type B (25nos) - Cost for Third year

300

-

-

... More
Mobile Handset type B (25nos) - Cost for Fourth year

300

-

-

... More
Mobile Handset type B (25nos) - Cost for Four and half year

150

-

-

... More
Mobile Plan A (1nos) - Cost for First year

12

-

-

... More
Mobile Plan A (1nos) - Cost for Second year

12

-

-

... More
Mobile Plan A (1nos) - Cost for Third year

12

-

-

... More
Mobile Plan A (1nos) - Cost for Fourth year

12

-

-

... More
Mobile Plan A (1nos) - Cost for Four and half year

6

-

-

... More
Mobile Plan B (1nos) - Cost for First year

12

-

-

... More
Mobile Plan B (1nos) - Cost for Second year

12

-

-

... More
Mobile Plan B (1nos) - Cost for Third year

12

-

-

... More
Mobile Plan B (1nos) - Cost for Fourth year

12

-

-

... More
Mobile Plan B (1nos) - Cost for Four and half year

6

-

-

... More
Internet Lease Line (1nos) - Cost for First year

12

-

-

... More
Internet Lease Line (1nos) - Cost for Second year

12

-

-

... More
Internet Lease Line (1nos) - Cost for Third year

12

-

-

... More
Internet Lease Line (1nos) - Cost for Fourth year

12

-

-

... More
Internet Lease Line (1nos) - Cost for Four and half year

6

-

-

... More
Cost of Building Information Modeling

-

-

-

... More
Cost towards building of Building Information Model (BIM)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.