Ministry Of Road Transport And Highways Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Ministry Of Road Transport And Highways - MORTH Tender

Works
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date19 Sep 2024
Closing Date24 Oct 2024
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Summary

Consultancy Service For Preparation Of Feasibility Study And Detailed Project Report For Construction Of Railway Over Bridge At Km 20 670 In Selu Town (l.c.no.99) On Deogaon Phata-selu-pathari Road Nh 548 B In Four Lane Configuration In The State Of

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge / Structural Engineer

6

-

-

... More
Material-cum-Geo-technical Engineer-Geologist

6

-

-

... More
Senior Survey / LA / Utility / Engineer

6

-

-

... More
Senior Geologist

6

-

-

... More
Environmental Specialist

3

-

-

... More
Quantity surveyor /Documentation Expert

6

-

-

... More
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants

1

-

-

... More
Duty Travel to Site (Fixed Costs)

1

-

-

... More
Office Supplies, Utilities and Communication ( Fixed Costs )

-

-

-

... More
Office Supplies Drafting

1

-

-

... More
Supplies computer

1

-

-

... More
Running Costs

1

-

-

... More
Domestic and International Communication

1

-

-

... More
Reports and Document Printing

-

-

-

... More
Inception Report & QAP

3

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Draft Feasibility Report

4

-

-

... More
Final Feasibility Report

6

-

-

... More
Strip Plan with L.A. Reports

6

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Draft Environmental Assessment report & RAP

4

-

-

... More
Final Environmental Assessment report & RAP

6

-

-

... More
Draft Detailed Design Report & Drawings etc.

4

-

-

... More
Draft EMP

4

-

-

... More
Draft Bidding Documents

4

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc

6

-

-

... More
Final EMP

6

-

-

... More
Final Bidding Documents

6

-

-

... More
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)

9

-

-

... More
LA & Clearances II Report

6

-

-

... More
Survey and Investigation

-

-

-

... More
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.

1

-

-

... More
Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology

1

-

-

... More
Investigation (Fixed cost)

-

-

-

... More
Road and Bridge Inventory

1

-

-

... More
FWD Test and Pavement Evaluation

1

-

-

... More
Roughness Survey

1

-

-

... More
Axle Load Survey

1

-

-

... More
Material Survey and Investigation

1

-

-

... More
Sub-grade Investigation

1

-

-

... More
Traffic Survey

1

-

-

... More
Socio-economic & Census Survey/ Studies

1

-

-

... More
Land Acquisition Studies

1

-

-

... More
Forest Department NOC

1

-

-

... More
Any other investigations/surveys

1

-

-

... More
NET WORK SURVEY AND GPR

-

-

-

... More
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority

1

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Cost of supply and fixing boundary pillars

-

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )

1

-

-

... More
Land acquisition Team including support staff and logistics/transportation

-

-

-

... More
Ex-Land revenue inspector/officer or equivalent

1

-

-

... More
EX-kanoogo/Girdwar or equivalent

1

-

-

... More
Ex-Patwari or equivalent

1

-

-

... More
Logistic for Land Acquisition Team

-

-

-

... More
computer including necessary peripherals

1

-

-

... More
printers

1

-

-

... More
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km

1

-

-

... More
Income Tax (Expariate)( as per prevaling Norms)

-

-

-

... More
Other Taxes / Duties (if any) Specify clearly

1

-

-

... More
Goods & Service Tax ( as per prevaling Norms)

1

-

-

... More
Sub Soil Investigation ( Boring)

-

-

-

... More
a) Boring in all type of soils ( Other than hard rock)

1

-

-

... More
b) Boring in Hard Rock

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.