Ministry Of Road Transport And Highways Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Ministry Of Road Transport And Highways - MORTH Tender

Works
Civil And Construction
Road Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date14 Oct 2024
Closing Date27 Feb 2025
Tender Amount₹ 3,63,59,000 
Notes
Download

AI Insights

Work Experience Requirements
... View More
The important information given under the technical capacity header which is specifically related to prior work experience includes: 1. Average Annual Turnover of Firm in last 3 Financial Years (from Consultancy Services): - Upto Rs. 10 Crores - More than Rs. 10 crores but less than/equal to Rs. 30 Crores - More than Rs. 30 crores but less than/equal to Rs. 60 Crores - More than Rs. 60 Crores 2. No. of key professionals on full time employment with the consultant (minimum for last one year): - 4 for Upto Rs. 10 Crores - 25 for More than Rs. 10 crores but less than/equal to Rs. 30 Crores - 40 for More than Rs. 30 crores but less than/equal to Rs. 60 Crores - 60 for More than Rs. 60 Crores 3. Max. no. of DPR/AE/IE/CSC/PMC consultancy assignments to be awarded to one particular consultant including ongoing consultancy services at a time: - 8 for Upto Rs. 10 Crores - 16 for More than Rs. 10 crores but less than/equal to Rs. 30 Crores - 30 for More than Rs. 30 crores but less than/equal to Rs. 60 Crores - 50 for More than Rs. 60 Crores 4. Max. no. of DPR consultancy assignments to be awarded to one particular consultant including ongoing consultancy services at a time: - 6 for Upto Rs. 10 Crores - 13 for More than Rs. 10 crores but less than/equal to Rs. 30 Crores - 24 for More than Rs. 30 crores but less than/equal to Rs. 60 Crores - 40 for More than Rs. 60 Crores 5. Maximum no. of DPR consultancy assignments to be awarded in one financial year to one particular consultant including ongoing consultancy services at a time: - 3 for Upto Rs. 10 Crores - 7 for More than Rs. 10 crores but less than/equal to Rs. 30 Crores - 12 for More than Rs. 30 crores but less than/equal to Rs. 60 Crores - 20 for More than Rs. 60 Crores 6. Weightage for prior work experience: - 75% weightage if the applicant firm has prepared the DPR/FS projects as a lead partner in a JV - 50% weightage if the applicant firm has prepared the DPR projects as the other partner (not lead partner) in a JV - 25% weightage if the applicant firm has prepared the DPR/FS projects as an associate 7. Similar project experience: - For 2-lane projects, experience of 4/6 lane also to be considered with a multiplication factor of 1.5 - For 4/6 laning projects, experience of 2 lane will be considered with a multiplication factor of 0.4, but only for those 2 lane projects whose cost of consultancy services was more than Rs.1.0 crore. Values like amount and percentage mentioned under the technical capacity header include: - Amount values: Rs. 10 Crores, Rs. 30 Crores, Rs. 60 Crores, Rs. 1.0 crore - Percentage values: 75%, 50%, 25%, 40%, 60%, 100% Also, average area variation as percentage of acquired private land, average delay in land acquisition and average use of new materials/waste materials/new technology used as percentage of total cost of civil works are considered with specific values and percentages.Similar work or eligible projects mentioned in the technical capacity experience include: - Experience in Design/Pavement Design of Highway Projects with a minimum aggregate length of 80 km. - Experience in Bridge Projects, including project preparation and design, with specific configurations such as 2/4 lane configuration bridges. - Experience in construction/construction supervision/preparation of DPR or feasibility reports of major tunnel projects, including those using NATM. - Experience as Team Leader or similar capacity in major tunnel construction/construction supervision projects or in preparation of DPR or feasibility reports of major tunnel projects. - Experience in handling major tunnel projects, including professional experience in major tunnel construction/construction supervision projects. - Tunnel/mineral and oil exploration projects - AEM survey for tunneling/mineral and oil exploration or any other similar work for an area of more than 2.7 sq km - Processing, Interpreting, generating 3D resistivity model of AEM survey’s raw data for tunneling/mineral and oil exploration or any other similar work for an area of more than 2.7 sq km - Major tunnel work (Rail/Road/Metro) - Highway projects, including preparation of Bill of Quantities, Contract documents, and documentation for major highway projects - Land Acquisition works of Government/Authority - Land Acquisition works in Highway/road sector - DPR consultancy related to the assignment for eligibility, with specific experience in: - Aggregate Length of DPR / Feasibility study of 2/4/ 6 lane projects - DPR for 2/4/6 laning projects each equal to or more than 40 % of indicative length of a package applied for (or Feasibility Study for 2/4/6 laning projects each equal to or more than 60 % of indicative length of a package applied for) - DPR of Bridge having length more than 200 m Values mentioned include: - Aggregate length of 80km, 150km, and 250km for highway projects - Area of more than 2.7 sq km - Percentage of share in Joint Ventures (JV), such as 30%, 50%, 70%, and 80% - Approx. Value of Services : (in INR/current USD) - Firm’s Average Turnover of last 5 years > 25 crore: 5 points - Firm Average Turnover of last 5 years 10 - 25 crore: 4 points - Firm Average Turnover of last 5 years > 5 but < 10 crore: 3 points - Cost of consultancy services was more than Rs.1.0 crore.

Costs

Summary

Consultancy Services For Preparation Of Dpr And Preconstruction Activity And Forest Diversion For Rehabilitation And Upgradation Of Existing Highway

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Quantity Surveyor/Documentation Expert

1

-

-

... More
Land Acquisition Expert

1

-

-

... More
Sub Professional Staff :

-

-

-

... More
Design Engineer

1

-

-

... More
Drafts Person

1

-

-

... More
Surveyor

1

-

-

... More
Support Staff (To be assessed by consultant as per requirment)

-

-

-

... More
Office Manager

2

-

-

... More
Typist

2

-

-

... More
Office Boy

1

-

-

... More
Transportation : Vehicle provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.

-

-

-

... More
For Conusltant: Innova or Equivalent (Not more than 2 years old)

6

-

-

... More
Duty Travel to Site (Fixed Costs) :

1

-

-

... More
Office Rent : (The rent cost includes maintenance, cleaning, repairs, etc. )

6

-

-

... More
Office Supplies, Utilities and Communication :

-

-

-

... More
Office Supplies Drafting

6

-

-

... More
Supplies Computer

6

-

-

... More
Running Costs

6

-

-

... More
Domestic & International Communication

6

-

-

... More
Office Furniture and Equipment (Rental) :

6

-

-

... More
Reports and Document Printing

-

-

-

... More
Monthly Report (3 Per Month)

2

-

-

... More
Inception Report & QAP

1

-

-

... More
Environment and Social Impact Screening Report

2

-

-

... More
Draft Feasibility Report

4

-

-

... More
Final Feasibility Report

4

-

-

... More
Strip Plan with L.A. Reports & Forest Reports

3

-

-

... More
Draft Environmental Assessment report & RAP

4

-

-

... More
Final Environmental Assessment report & RAP

4

-

-

... More
Draft Detailed Design Report & Drawings etc. (& Draft EMP)

4

-

-

... More
Draft Bidding Documents (& Draft EMP)

4

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. (& Final EMP)

6

-

-

... More
Final Bidding Documents

4

-

-

... More
Survey and Investigation :

1

-

-

... More
A. Investigation (Fixed Cost)

-

-

-

... More
Traffic Survey

6.04

-

-

... More
Socio-economic & Census Survey / Studies

6.04

-

-

... More
B. Net Work Survey and GPR :

-

-

-

... More
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.