Maharashtra Natural Gas Limited Tender

... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Maharashtra Natural Gas Limited - MNGL Tender

Works
Eprocure
Opening Date7 Jul 2021
Closing Date27 Jul 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / Or as directed by Engineer–in–charge. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as-built drawings and 1 soft copy and 6 hard copies of pipe book) All the works shall be executed in accordance with the provision of contract including carrying out all temporary/ ancillary/ auxiliary works required for the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for precommissioning activities. Specified dia Thk (mm) Material Coating Type Length of each pipe (mm) NB

-

-

-

... More
250 6.4 API X-52 3 Layer PE Coating (Externally) Double random (approx. 11.5 m to 12.5 m)

2420

-

-

... More
150 6.4 API X-52 3 Layer PE Coating (Externally) Double random (approx. 11.5 m to 12.5 m)

30

-

-

... More
100 6.4 API X-52 3 Layer PE Coating (Externally) Double random (approx. 11.5 m to 12.5 m)

40

-

-

... More
Note: (I)This item shall be applicable for the underground steel grid main pipeline & branch pipeline, barred tees, insulating joints, bends, flanges & fittings, accessories etc. (i.e. including arrangement for making provision for tap-off on proposed steel grid main pipeline) and aboveground approach pipeline upto Insulating Joint (excluding installation of aboveground insulating joint) for various stations. (II)In above item, restoration works are excluded from contractor's scope, except certain restoration works detailed in clause no. 16C. (V) of 3a. Particular Job Specification under Vol.-I of III. Since restoration works for backfilled pipeline trench shall be done by the concerned authorities / Owner. (III)In above item, backfilling of pipeline trench by borrowed select soil duly approved by Owner / EIC shall be paid by separate item mentioned elsewhere in the SOR. (IV)Items except above are covered separately. The lengths of pipelines are tentative.

-

-

-

... More
PIPELINE LAYING / INSTALLATION in a built-up surface / Hard surface Raking up of hard surface of any type including metal, concrete, bituminous, tiled, brick lined soft rock which is breakable in pieces manually (without use of pneumatic machine) etc. All tiles/ slabs/ curb stones etc. removed during excavation shall be placed properly. The other activities are as per SOR sr no 1.0 to 4.0 Payment for cutting of hard rock, if any, is covered unders SOR no. 68

-

-

-

... More
250 6.4 API X-52 3 Layer PE Coating (Externally) Double random (approx. 11.5 m to 12.5 m)

2360

-

-

... More
150 6.4 API X-52 3 Layer PE Coating (Externally) Double random (approx. 11.5 m to 12.5 m)

40

-

-

... More
100 6.4 API X-52 3 Layer PE Coating (Externally) Double random (approx. 11.5 m to 12.5 m)

40

-

-

... More
Note: (I)This item shall be applicable for the underground steel grid main pipeline & branch pipeline including tap-off for distribution pipelines, valves, barred tees, insulating joints, bends, flanges & fittings, accessories etc. (i.e. including arrangement for making provision for tap-off on proposed steel grid main pipeline) and aboveground approach pipeline upto Insulating Joint (excluding installation of aboveground insulating joint) for various stations. (II)In above item, restoration works are excluded from contractor's scope, except certain restoration works detailed in clause no. 16C. (V) of 3a. Particular Job Specification under Vol.-I of III. Since restoration works for backfilled pipeline trench shall be done by the concerned authorities. (III)In above item, backfilling of pipeline trench by borrowed select soil duly approved by Owner / EIC shall be paid by separate item mentioned elsewhere in the SOR. (IV)Items except above are covered separately. The lengths of pipelines are tentative.

-

-

-

... More
Permission Liasioning /Follow-up : Liasioning & follow up for Permission with all the concerned authorities & boards viz Railways, NH, PWD, MIDC, Local Municipal, Panchyat, Electricity, REC, RES, Sewage water, Drinking water, Forest, Social Forestry, Owners of OFC, Traffic, Law & Order, Fire Brigade, Private Land Owner etc. for entire pipeline length and associated terminals (like SVs, tap-offs) alongwith associated work as per tender. Obtaining necessary NOC from authority after completion of work (Where ever applicable).

5515

-

-

... More
Laying of RCC Tiles : Providing single layer of RCC Tiles with supply of RCC Tiles to entire width of trench above Warning Mat placed in trench over the laid pipeline as per standard drawing, specification and instruction of Owner. (Rate to include cost of all labour, tools, tackles, equipment, hire charges & supply of all materials, etc.)

-

-

-

... More
For width of 10" pipeline trench

5110

-

-

... More
For width of 6" pipeline trench

90

-

-

... More
For width of 4" pipeline trench

100

-

-

... More
Barricading to comply with HSSE : Steel barricading of the trenches Cautionary Sign Boards and lighting arrangement shall be provided as per attched drawing no.MNGL/Plng./steel/04. The rates include barricading of trenches along with sign boards, lighting etc. and maintain the same till the back filling of the trench. Rates will be payable per metre of BARRICADING PROVIDED. If proper barricading is not provided, MNGL will barricade the trenches at the risks and costs of the CONTRACTOR and will levy penalty of twice the rate per unit for the relevant section of the pipeline apart from other actions as per contract.

5515

-

-

... More
RESTORATION OF ROADS Restoration of asphalt / concrete / red stone roads / pavement/Footpath/Paver block including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.

-

-

-

... More
Restoration of Asphalt road upto 10 cm thickness

600

-

-

... More
Restoration of Asphalt road beyond 10 cm upto 20 cm thickness

150

-

-

... More
Restoration of Concrete road upto 10 cm thickness

200

-

-

... More
Restoration of red stone road / footpath / pavement/ Paverblock upto 4 cm thickness

50

-

-

... More
BORROWED FOREIGN SELECT SOIL FOR BACKFILLING Additional work over and above item 1.0 for supply of specified and approved quality of borrowed foreign soft graded soil / sand in place of available excavated material and / or other suitable soil as per applicable standards / specifications, including backfilling of excavated trench for specified length after laying and padding of pipeline, including transportation of such special backfill material over all distances, complete. Note - Please see note against item no. 26

50

-

-

... More
BORROWED LOCAL SELECT SOIL FOR BACKFILLING Additional work over and above item 1.0 for supply of specified and approved quality of borrowed local soft graded soil / sand in place of available excavated material and / or other suitable soil as per applicable standards / specifications, including backfilling of excavated trench for specified length after laying and padding of pipeline, including local transportation of such special backfill material over all distances, complete. Note - Soil obtained from within 10 km radius of work-site(s) shall be considered as local soil otherwise the soil will be considered as foreign soil for above item no. 25.0

1500

-

-

... More
CROSSING OF STEEL PIPELINE BY JACKING/ BORING / HDD / OPEN CUT / THROUGH HUME- PIPES By Boring - Complete work of the other road crossings (between the limits as defined at site and decided by Engineer-in-charge) including supply of casing pipe duly coal tar expoy coated of mininum 300 micron of size 400 mm NB x 6.4 mm thk, 300 mm NB x 6.4 mm thk, 200 mm NB x 6.4mm thk., confirming to API 5L Gr. B / IS:3589 or equivalent ERW pipe including handling, loading, transportation, unloading to Contractor's own stock yard/ work site. Pre-construction survey and making of crossing drawing based on site visit and getting their approval from concerned Authority/ Engineer-in-charge prior to start the execution of work. Preparation of required length of carrier pipeline welded string including all other works as mentioned in item no. 1.0 above and specification/ drawings. Insertion of carrier pipeline welded string including all other works as mentioned in item no. 1.0 above and as per specification/ drawings. Insertion of carrier pipe in casing pipe after abvoe ground pretesting at specified test pressure and supply & installation of casing insulators as per specification/ drawings. Insatllation of vent and drain assembly, fixing of end seals, backfilling and restoration as original of the facilities crossed and performing all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 above) and as per specification, approved procedure, drawing etc. and instruction of Engineer-in-charge and provision of contract document, getting NOC from all concerned Authority of the facilities crossed.

-

-

-

... More
Installation of casing pipe by jacking/ boring/ for rail/ road and other unspecified crossings in all type of sub-soil condition including soft / hard rock and open cut for adjacent service road, canal, minor nature of water channel, utility line crossing (if any) wherever required for all depth in all type of soils and terrrain for carrier pipe insertion . All other Contractor supplied materials like casing insulators and casing end seals as per enclosed specification/ drawings, materials for casing vents and drain assembly etc. including supply of all other materials, equipments, consumables, manpower, welding including visual inspection of all weld joints.

-

-

-

... More
Road Crossing By Boring and Jacking Method : Road Crossings at various locations by Boring and Jacking Method (including supply of casing pipe) along with laying of 4'' Steel Pipe for MDPE if necessary as decided by EIC at site as per concerned authority requirement.

-

-

-

... More
Line pipe detail 10" NB, 6.4 mm thk API X-52 pipe, C.S. by Jacking Boring (including supply of 600 mm OD x 6.4mm Wall thk. casing pipe) along with laying of 4'' steel Pipe for MDPE if necessary

50

-

-

... More
Line pipe detail 6" NB, 6.4 mm thk API X-52 pipe, C.S. by Jacking Boring (including supply of 450 mm OD x 6.4mm Wall thk. casing pipe) along with laying of 4'' steel Pipe for MDPE if necessary

10

-

-

... More
Line pipe detail 4" NB, 6.4 mm thk API X-52 pipe, by Jacking Boring (including supply of 450 mm OD x 6.4mm Wall thk. casing pipe) along with laying of 4'' steel Pipe for MDPE if necessary

50

-

-

... More
Road Crossing By Open Cut Method : Road Crossings at various locations by Open cut Method along with laying of MDPE upto 180 mm Dia if necessary as decided by EIC at site as per concerned authority requirement.Depth of Line at crossing shall be as mentioned in Tender.

-

-

-

... More
Line pipe detail 10" NB, 6.4 mm thk API X-52 pipe, C.S. by open cut method along with laying of MDPE upto 180 mm Dia if necessary

240

-

-

... More
Line pipe detail 6" NB, 6.4 mm thk API X-52 pipe, C.S. by open cut method along with laying of MDPE upto 180 mm Dia if necessary

10

-

-

... More
Line pipe detail 4" NB, 6.4 mm thk API X-52 pipe, C.S. by open cut method along with laying of MDPE upto 180 mm Dia if necessary

10

-

-

... More
Water body Crossing By Open Cut Method : water/ canal/ nallah/ drain/ channel Crossings at various locations by Open cut Method along with laying of MDPE upto 180 mm Dia if necessary as decided by EIC at site as per concerned authority requirement.Depth of Line at crossing shall be as mentioned in Tender.

-

-

-

... More
Line pipe detail 10" NB, 6.4 mm thk API X-52 pipe, C.S. by open cut method along with laying of MDPE upto 180 mm Dia if necessary

90

-

-

... More
Line pipe detail 6" NB, 6.4 mm thk API X-52 pipe, C.S. by open cut method along with laying of MDPE upto 180 mm Dia if necessary

10

-

-

... More
Line pipe detail 4" NB, 6.4 mm thk API X-52 pipe, C.S. by open cut method along with laying of MDPE upto 180 mm Dia if necessary

10

-

-

... More
Note: Laying of the pipeline by the approved method across the crossing including, strings preparation of pipes, welding, testing, radiography, welding repair and retest, coating of field joints and repair of pipeline coating with special PERP-80 repair patch or equivalent material as per specification, pre-hydrotest of complete strings made for crossing etc. Backfilling of the Road/water/ canal/ nallah/ drain/ channel Crossings/ trench including restoration and clean-up of area etc. to the satisfaction of Engineer-in-charge/ Concerned Authority. All other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge.

-

-

-

... More
CROSSING BY HDD METHOD : Complete work of the any crossing (between the limits are defined as approved drawings) by HDD method including "Receiving and taking over" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling loading, unloading, aligning etc. supply of all Contractor supplied material, manpower, equipment, other resources and aquiring the required land for storage, fabrication inclduing string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type Heat Shrink Sleeve and repair of pipeline coating with special repair patch materials as per specification,pre-testing etc. of complete string made for crossing access for Contractor etc and execution of, but not limited to, following works in accordance with specifications scope of work and instructions of Engineer-in-charge and as per all provision of Contract Document. Pre-construction surveys based on site visit, collection of historical data from irrigation/ concerned department including design & calculation and detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings/ road crossings as well as utility crossings (if any) encountered during crossing prior to start the execution of work. Directional drilling to required depth from top of road including maintenance of drill hole in all types of strata ( other than hard rock, crossing by HDD in hard rock is covered seperately) at all depth to accommodate the pipeline at all conditions encountered during rail/ road crossing by approved HDD methods for providing minimum cover specified in code/ specification or the actual depth as decided by concerned authority, whichever is more.

-

-

-

... More
In case of water crossing, drilling to the required depth on the banks and bed including maintenance of drill hole in all types of strata (other than hard rock, crossing by HDD in hard rock is covered seperately) all depth to accommodate the pipeline a by HDD methods for providing with minimum cover over top of the pipe at all point across the maximum possible width of water bed (as per drawing) either 1.5 mtrs. below the predicted scour profile expected during the life time of the pipeline or 2.5 mtrs. below the available lowest firm bed (if scour profile/ depth not available) of the water crossing by ascertaining bed level upto 50 mtrs. both the side from crossing location or the actual depth as decided by concerned Authority/ Engineer-in-charge whichever is more. Laying of the pipeline by the approved HDD method across the crossing including, strings preparation of pipes, welding, testing, radiography, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent and repair of pipeline coating with special PERP-80 repair patch or equivalent material as per specification, pre-hydrotest of complete strings made for crossing etc. Backfilling of the ditch/ trench including restoration and clean-up of area etc. to the satisfaction of Engineer-in-charge/ Concerned Authority and all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 to 4.0 above) required as per specification, approved drawings, calculations, methods and to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority. Post installation hydrotest dewatering and tie-in with pipeline at either side of crossing/banks etc. All other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 to 4.0 above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge.

-

-

-

... More
Crossing of Road/water body/canal/nallah/ drain/ channel crossings by carrier pipeline of size 250 mm NB x 6.4 mm thk. of API X-52 (along with laying of 4'' Steel Pipe for MDPE if necessary) by HDD Method .The same will be applicable for NH crossing by HDD .

70

-

-

... More
Crossing of Road/water/ canal/ nallah/ drain/ channel crossings by carrier pipeline of size 150 mm NB x 6.4 mm thk. of API X-52 (along with laying of 4" Steel Pipe for MDPE if necessary) by HDD Method. The same will be applicable for NH crossing by HDD .

10

-

-

... More
Crossing of Road/water/ canal/ nallah/ drain/ channel crossings by carrier pipeline of size 100 mm NB x 6.4 mm thk. of API X-52 (along with laying of 4" Steel Pipe for MDPE if necessary) by HDD Method. The same will be applicable for NH crossing by HDD if required.

25

-

-

... More
Installation of carrier pipes by rock drilling for Road/water/Canal/ nallah/ drain/ channel/along the road, or wherever required in all types of hard rock. It includes survey of the underground utilities, submission of profile for approval, execution of the work as per the standard procedure, including , excavation of the pits, insertion/pulling of the carrier pipe, removal of malba, subsequent backfilling and restoration of the facility crossed as per original condition, including supply of all other materials, equipment, consumables, manpower etc including string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type of Heat Shrink Sleeve (Direx) and repair of pipeline coating with special repair patch materials as per Specification, pre-testing etc. of complete string made for crossing/ laying access for Contractor etc. and execution of, but not limited to, following works in accordance with specifications and instruction of Engineer-in-Charge and as per all provision of Contract Document. Balance activities as defined in SOR Item of open trench. Note:The length of HDD mentioned is tentative and may vary to the considerable extent depending upon requirements as per site conditions. The length mentioned in SOR is indicative for all the crossing to be done by HDD, numbers and locations shall be decided by Engineer-in-Charge depending upon site condition. Payment for the length of final tie-in carrier pipeline string with mainline laid by HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. Payment shall be based on the actual length (i.e. length between tie-in joints) of pipeline laid by HDD. Exact location of tie-in shall be approved by Owner/ Owner's representative. Above Rate for steel pipeline laying is inclusive of carrier pipe string preparation, Welding, NDT, Pretesting, Coating, Post Hydrotesting, Hydrotesting, Precommissioning & etc.

-

-

-

... More
Crossing of Road/water body / canal/ nallah/ drain/ channel crossings by carrier pipeline of size 250 mm NB x 6.4 mm thk. of API X-52 (along with laying of 4'' Steel Pipe for MDPE if necessary) by HDD Method

70

-

-

... More
Crossing of Road/water Body / canal/ nallah/ drain/ channel crossings by carrier pipeline of size 150 mm NB x 6.4 mm thk. of API X-52 (along with laying of 4'' Steel Pipe for MDPE if necessary) by HDD Method

10

-

-

... More
Crossing of Road/water Body/ canal/ nallah/ drain/ channel crossings by carrier pipeline of size 100 mm NB x 6.4 mm thk. of API X-52 (along with laying of 4'' Steel Pipe for MDPE if necessary) by HDD Method

25

-

-

... More
Note: (i) Crossing width & Actual string length for HDD shall vary as per design calculations & site condition so that pipe is not under stress as permitted by codes/ specifications. However final length of string & cover from top of pipe shall be decided by concerned Authority/ Engineer-in-charge. (II) Payment shall be based on the actual length (i.e. length between tie-in joints) of pipeline laid by HDD. Exact location of tie-in shall be approved by Owner/ Owner's representative. Above Rate for steel pipeline laying is inclusive of carrier pipe string preparation, Welding, NDT, Pretesting, Coating, Post Hydrotesting, Hydrotesting, Precommissioning & etc. (III) Payment for the length of final tied-in carrier pipeline string with mainline made for crossing laid by HDD method are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere. (IV) Width of above crossings indicated are tentative. The width indicated are not for any single crossings. This shall be as per requirement at site for crossing at different locations. (V) The rates shall include bore holes for soil investigation, collection of disturbed samples from bore holes and visual engineering classification of soil at crossing location. Minimum 2 nos of bore holes ( 01 no each at both end of crossing) are required on each crossing and submission of detailed report to Company.Boreholes shall be made at locations as direct by Engineer in-charge at crossing location to find out the presence of rock strata. Boring shall be carried out in accordance with the provision of IS:1892. Minimum diameter of boring shall be 150 mm.

-

-

-

... More
Note: (I) Quantity mentioned under item nos. 29 ,42 & 43 are indicative only for different location of roads/water/ canal/ nallah/ drain/ channel Crossings. (II) Actual length & width of individual crossing and cover from top of casing pipe/ carrier pipe string may vary depending upon site condition, approved crossing drawings, specifications etc. and / or as decided by Engineer-in-charge/ Concerned Authority. (III) Payment for supply & installation of Zinc ribbon anode and its design excluded from above item and covered elsewhere in the SOR. (IV) Payment for the length carrier pipeline string inserted in casing pipe laid by Boring are covered separately and shall be paid under other clauses mentioned elesewhere in the SOR.

-

-

-

... More
Excavation beyond 1.5m depth in case of crossing of utilities/ drain/ culverts etc. through open cut upto the following depth (including restoration of the damaged area to its original condition and satisfaction of the Engineer-in-charge / concerned authorities) : - In Normal Surface / Unprepared surface (Katcha Surface)

-

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 250 mm NB Pipeline)

600

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 250 mm NB Pipeline)

200

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 150 mm NB Pipeline)

20

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 150 mm NB Pipeline)

20

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 100 mm NB Pipeline)

30

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 100 mm NB Pipeline)

20

-

-

... More
In a built-up surface / Hard surface of any type including metal, concrete, bituminous, tiled, brick lined soft rock which is breakable in pieces manually (without use of pneumatic machine) etc. All tiles/ slabs/ curb stones etc. removed during excavation shall be placed properly. The other activities are as per SOR sr no 1 to 4 Payment for cutting of hard rock, if any, is covered unders SOR no. 68

-

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 250 mm NB Pipeline)

600

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 250 mm NB Pipeline)

200

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 150 mm NB Pipeline)

20

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 150 mm NB Pipeline)

20

-

-

... More
Deeper than 1.5 m & upto 2.5 m below existing level (for 100 mm NB Pipeline)

30

-

-

... More
Deeper than 2.5 m & upto 4.5 m below existing level (for 100 mm NB Pipeline)

20

-

-

... More
Note: (I) Crossing width may vary as per site condition. However final length of string & cover from top of pipe shall be decided by concerned Authority/ Engineer-in-charge. (II) Payment for the above items under item no. 6 shall be made on running meter basis to be measured between both ends of vertical decent of bend (not less than 22½°, R=3D / 1.5 D) between both ends of the crossing. (III) Width of above crossings indicated are tentative. The width indicated are not for any single crossings. This shall be as per requirement at site for crossings at different locations.

-

-

-

... More
Excavation of hard rock : Excavation of hard rock wherever hard rock of single piece exceeding 1.0 m in length removable by pneumatic chisel/ drill as per direction of EIC.

3000

-

-

... More
REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR) Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in following items, noted and recorded at the time of "receiving and taking over" by Contractor in the presence of Engineer-in-charge. Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:

-

-

-

... More
Specified OD, mm 273

60

-

-

... More
Specified OD, mm 168.3

10

-

-

... More
Specified OD, mm 114.3

10

-

-

... More
Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:

-

-

-

... More
Specified OD, mm 273

60

-

-

... More
Specified OD, mm 168.3

10

-

-

... More
Specified OD, mm 114.3

10

-

-

... More
REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR) Repair of Holiday in Coating (Noted and recorded at the time of "receiving and taking over") Supply of all coating repair materials as per requirements of specification to be compatible with line pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of Engineer-In-Charge. This rate shall be applicable per sq. cm of the exposed steel area exposed steel area

1000

-

-

... More
PERMANENT MARKERS : Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of engineer-in-charge.

-

-

-

... More
Pipeline RCC boundary / route marker as per drawing

110

-

-

... More
Pipeline warning markers with post & foundations

52

-

-

... More
Pipeline direction marker with post & foundations

24

-

-

... More
Pipeline KM with post & foundations

5

-

-

... More
LEAK / BURST (ATTRIBUTABLE TO OWNER) : All works for locating leak / burst in Company's supplied material only (occurred during hydrostatic testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner /Engineer-in-charge/ Engineer in-charge

-

-

-

... More
For 10" NB Line

1

-

-

... More
For 6" NB Line

1

-

-

... More
For 4" NB Line

1

-

-

... More
Note: (I) This rate is applicable for manufacturing defects in Owner supplied material only. (II) Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.

-

-

-

... More
HOOK -UP : Hook-up of proposed pipeline by welding of final tie-in-joint with any existing laid pipeline portion of river X-ing ,existing Tap-off & battery limit of section IV including Hook-up point of the existing pipeline to be made ready for welding by cutting of flanges / valves / headers at all depth in all type of soil etc. Venting of N2 / gas / gas mixture as required purging of N2 Gas (if required), rebevelling as required, radiography and other NDT examination, joint coating as per specification.Contractor shall supply of all consumables, manpower, machinaries, materials, N2 gas etc. and carry out all works as per the provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
For 10" NB

1

-

-

... More
For 6" NB

1

-

-

... More
For 4" NB

1

-

-

... More
PRE-COMMISSIONING AND ASSISTANCE IN COMMISSIONING OF PIPELINE SYSTEM Swabbing, drying, purging with nitrogen of the complete pipeline network and the associated facilities being installed to the specified acceptance criteria, carrying out pre-commissioning works, providing assistance during the complete duration of commissioning operations for entire pipeline network system including supply of all equipment, man-power, consumables (including pigs & nitrogen required for purging with maintaining nitrogen column of mininum 10% of pipeline geometric volume) materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
For 10" NB Pipeline

5300

-

-

... More
For 6" NB Pipeline

120

-

-

... More
For 4" NB Pipeline

200

-

-

... More
IDLE TIME PRESERVATION OF PIPELINE Preservation of complete pipeline and associated facilities forming part of the pipeline as per Bid document and its maintenance including supply of all consumables, all equipment, manpower, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge. Note : Owner reserves the right to exercise either or none of the rates below.

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of 3 months.

-

-

-

... More
For 10" NB Pipeline

5300

-

-

... More
For 6" NB Pipeline

120

-

-

... More
For 4" NB Pipeline

200

-

-

... More
For every additional period of one month or part there of

-

-

-

... More
For 10" NB Pipeline

5300

-

-

... More
For 6" NB Pipeline

100

-

-

... More
For 4" NB Pipeline

200

-

-

... More
RCC VALVE PITS All civil works including supply of all materials, excavation of pit, piping supports including all PCC and RCC works for valves pits including pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc. and finishing , clean-up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area, as per typical drawing and specification enclosed and instructions of Engineer-in-charge. In this item,instead of Brick Work, RCC will be done

-

-

-

... More
Valve Pit of Size 2m x 1.5m

2

-

-

... More
Valve Pit of Size 1.5m x 1 m

1

-

-

... More
Valve Pit of Size 1 m x 1 m

6

-

-

... More
SUPPLY OF ASSORTED PIPE, FITTINGS AND FLANGES Complete works of supply of pipes, flanges & fittings for aboveground & underground installation including all taxes, duties, transportation and inspection charges but not limited to, the following items in accordance with PMS (piping material specification), relevant specifications & drawings indicated in job specification under SCC (technical) and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT. - Handling including lifting, transportation from Contractor Stores to CONTRACTOR's workshop for fabrication and/ or to work site for field fabrication and erection for all piping items supplied by Contractor.

-

-

-

... More
Carbon Steel Pipe (A 106, Seamless B-36.10/ API X 52 )

-

-

-

... More
Size: 4" NB, BE Rating/ Schedule: Sch. 80

20

-

-

... More
Size: 2" NB, BE Rating/ Schedule: Sch. 80

14

-

-

... More
Size: 1½" NB, PE Rating/ Schedule: Sch. 80

10

-

-

... More
Size: 1" NB, PE Rating/ Schedule: Sch. 80

14

-

-

... More
Size: ¾" NB, PE Rating/ Schedule: Sch. 160

15

-

-

... More
Flanges :

-

-

-

... More
Weld Neck (B-16.5, 300# A105,125 AARH, Serrated finish)

-

-

-

... More
Size: 10" NB, RF End thickness to match with pipe wall thickness Rating/ Schedule: (Sch. Std.)

1

-

-

... More
Size: 6" NB, RF End thickness to match with pipe wall thickness Rating/ Schedule: (Sch. 80)

1

-

-

... More
Size: 4" NB, RF End thickness to match with pipe wall thickness Rating/ Schedule: Sch. 80

3

-

-

... More
Size: 2" NB, RF End thickness to match with pipe wall thickness Rating/ Schedule: (Sch. 80)

13

-

-

... More
Size: 1½" NB, RF End thickness to match with pipe wall thickness Rating/ Schedule: (Sch. 80)

4

-

-

... More
Size: 3/4" NB, RF End thickness to match with pipe wall thickness Rating/ Schedule: (Sch. 80)

13

-

-

... More
Blind Flanges (B-16.5, 300# A105,125 AARH Serrated)

-

-

-

... More
Size: 10" NB, RF

1

-

-

... More
Size: 6" NB, RF

1

-

-

... More
Size: 4" NB, RF

3

-

-

... More
Size: 2" NB, RF

13

-

-

... More
Size: 1½" NB, RF

4

-

-

... More
Size: 3/4" NB, RF

13

-

-

... More
Elbow (Seamless) :

-

-

-

... More
90° Elbow ( MOC MSS SP 75 WPHY 52 & DIM. ASME 16.9 R=1.5D ) Min Thickness 6.4mm

-

-

-

... More
Size: 10" NB Rating/ Schedule: 300#

3

-

-

... More
Size: 6" NB Rating/ Schedule: 300#

2

-

-

... More
Size: 4" NB, BE Rating/ Schedule: 300#

2

-

-

... More
Size: 2" NB Rating/ Schedule: Sch. 80

6

-

-

... More
Size: 1" NB Rating/ Schedule: SW, 3000#

4

-

-

... More
45° Elbow ( MOC MSS SP 75 WPHY 52 & DIM. ASME 16.9 R=1.5D ) Min Thickness 6.4mm

-

-

-

... More
Size: 10" NB Rating/ Schedule: 300#

3

-

-

... More
Size: 6" NB Rating/ Schedule: 300#

2

-

-

... More
Size: 4" NB, BE Rating/ Schedule: 300#

2

-

-

... More
Size: 2" NB Rating/ Schedule: Sch. 80

4

-

-

... More
Size: 1" NB Rating/ Schedule: SW, 3000#

4

-

-

... More
90° Elbow (MOC MSS SP 75 WPHY 52 R= 3D ) Min Thickness 6.4mm

-

-

-

... More
Size: 10" NB Rating/ Schedule: 300#

12

-

-

... More
Size: 6" NB Rating/ Schedule: 300#

2

-

-

... More
Size: 4" NB, BE Rating/ Schedule: 300#

8

-

-

... More
45° Elbow (MOC MSS SP 75 WPHY 52 R= 3D ) Min Thickness 6.4mm

-

-

-

... More
Size: 10" NB Rating/ Schedule: 300#

18

-

-

... More
Size: 6" NB Rating/ Schedule: 300#

2

-

-

... More
Size: 4" NB, BE Rating/ Schedule: 300#

4

-

-

... More
22½° Elbow (MOC MSS SP 75 WPHY 52 R= 3D) Min Thickness 6.4mm

-

-

-

... More
Size: 10" NB Rating/ Schedule: Sch. Std.

16

-

-

... More
Size: 6" NB Rating/ Schedule: End thickness to match with pipe wall thickness

2

-

-

... More
11½° Elbow (MOC MSS SP 75 WPHY 52 R= 3D), Min Thickness 6.4mm

-

-

-

... More
Size: 10" NB Rating/ Schedule: 300#

10

-

-

... More
Size: 6" NB Rating/ Schedule: 300#

2

-

-

... More
Tees (Seamless)

-

-

-

... More
Equal Tee (MOC MSS SP 75 WPHY 52 & DIM. ASME B16.9)

-

-

-

... More
Size: 10" NB x 10" NB x 10" NB Rating/ Schedule: Min. Thickness 6.4mm X min. Thickness 6.4mm

2

-

-

... More
Size: 6" NB x 6" NB x 6" NB Rating/ Schedule: Min. Thickness 6.4mm X min. Thickness 6.4mm

2

-

-

... More
Size: 4" NB x 4" NB x 4" NB Rating/ Schedule: Min. Thickness 6.4mm X min. Thickness 6.4mm

2

-

-

... More
Size: 2" NB x 2" NB x 2" NB Rating/ Schedule: Sch. XS

2

-

-

... More
Unequal Tee (MOC MSS SP 75 WPHY 52 & DIM. ASME B16.9)

-

-

-

... More
Size: 10" NB x 10" NB x 6" NB Rating/ Schedule: Sch. Std. x Sch. Std.

2

-

-

... More
Size: 10" NB x 10" NB x 4" NB Rating/ Schedule: Sch. Std. x Sch. Std.

2

-

-

... More
Size: 4" NB x 4" NB x 2" NB Rating/ Schedule: Sch. 80 x Sch.80

3

-

-

... More
Size: 6" NB x 6" NB x 4" NB Rating/ Schedule: Sch. Std.x Sch. XS

2

-

-

... More
Reducer (MOC MSS SP 75 WPHY 52 & DIM. ASME B16.9)

-

-

-

... More
Size: 10" NB x 6" NB Rating/ Schedule: Min Thickness 6.4mm

2

-

-

... More
Size: 10" NB x 4" NB Rating/ Schedule: Min Thickness 6.4mm

2

-

-

... More
Size: 6" NB X 4" NB Rating/ Schedule: Min Thickness 6.4mm

2

-

-

... More
Size: 4" NB X 2" NB Rating/ Schedule: Min Thickness 6.4mm

2

-

-

... More
Weldolet and Sockolet

-

-

-

... More
Weldolet (MOC A105 & DIM. MSS SP 97)

-

-

-

... More
Size: 10" NB x 2" NB Rating/ Schedule: Sch. 80.

8

-

-

... More
Size: 6" NB x 2" NB Rating/ Schedule: Sch.80

4

-

-

... More
Size: 4" NB x 2" NB Rating/ Schedule: Sch. 80

4

-

-

... More
Sockolet (MOC A105 & DIM. MSS SP 97)

-

-

-

... More
Size: 10" NB x 3/4" NB Rating/ Schedule: #6000

4

-

-

... More
Size: 6" NB x 3/4" NB Rating/ Schedule: #3000

3

-

-

... More
Size: 4" NB x 1" NB Rating/ Schedule: #3000

4

-

-

... More
Size: 4" NB x 3/4" NB Rating/ Schedule: #3000

4

-

-

... More
Butt Weld Disc End Cap (MOC MSS SP 75 WPHY 52 & DIM. ASME B16.9)

-

-

-

... More
Size: 10" Rating/ Schedule: Sch. Std.

1

-

-

... More
Size: 6" Rating/ Schedule: Sch. 40

1

-

-

... More
Size: 4" Rating/ Schedule: Sch. 80

1

-

-

... More
Fabrication & Installation of Underground Valve Assembly (including Pneumatic testing of Assembly before installation at Design Pressure)

-

-

-

... More
10"NB Isolation Valve/tap-off assembly as per Drg. No. MNGL/Plng./Steel/40

2

-

-

... More
6" NB Isolation Valve/tap-off assembly as per Drg. No.MNGL/Plng./Steel/40

1

-

-

... More
4" NB Isolation Valve/tap-off assembly as per Drg. No. MNGL/Plng./Steel/40

1

-

-

... More
Note: (I) For all the supply items mentioned above, procurement shall be made as per enclosed Data Sheets and respective technical specification, after due approval of Engineer-in-charge. (II) The quantities mentioned above are tentative and quantities for above supply items shall be finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner.

-

-

-

... More
PLANT PIPING (ABOVEGROUND) Fabrication and testing of carbon steel piping and fittings, valves, IJ, including supply of all consumables, equipment, manpower, and other resources and execution of job as per instruction AIC/EIC.Transportation of all piping items from Owner's and/ or Contractor's storage point to work at site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning / Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications indicated in item 5.5 of PJS & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT. Fabrication including lifting and transportation from COMPANY's warehouse to CONTRACTOR'S Stores and/or work site, cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges, reducers etc. to match with the matching edges of uneven thickness, wherever required, fit-up, welding of pipes and fittings like elbows, tees, reducers, weldolets, sockolets, Valves, IJ etc. flanges, vent and drain point connection, Radiography and NDT of all joints etc, including providing stubin connections, fabricated fittings and reinforcement pads etc., as required. Erection of pipes of all types and thickness at all elevations, connecting with equipment nozzle, aligning, installation and carrying out connected activities for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, flanges, blind flanges, spectacle blind flanges, branch connection / tapping for pressure gauges, including installation of gaskets and bolts.

-

-

-

... More
Erection including prior cleaning, lifting, placing on pipe sleepers and supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie-in with existing piping/facilities, etc. tapping for inline instruments like pressure gauges, thermowells, sample connection, etc. Hydro testing of the piping job shall be conducted at pressure mentioned in specification for a period of 4 hours by using de-mineralised water, to check its strength. No visible leakages shall be detected during the test. Testing shall be conducted as per tender specification.Pneumatic Testing of entire above ground piping at Design pressure before final hook up. Preparation of final bill of material based on piping GADs. Preparation of isometric and fabrication drawings. Carrying out Non-destructive testing as required Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specifications suitable for highly corrosive area environment including supply of approved paints and primers, application of primer and paints, indentification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY. Precommissioning & making operational all piping system and equipments.

-

-

-

... More
Commissioning Contractor scope shall provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities. Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up. Hook-up works (with client/ consumer piping at battery limits):

-

-

-

... More
Complete Carbon Steel aboveground Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. as described under item 16 above, and Any other work and material required for the completion of the work and not covered above and desired by EIC shall be in the scope of contractor

-

-

-

... More
Carbon Steel Pipe (ASTM A 106, Seamless B-36.10 / API X 52)

148.25

-

-

... More
Note: 1) Pipe Specification and thickness may vary depending upon availability of pipe. No extra payment shall be made for this. 2) All butt welded fittings & flanges end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost. 3) All o-lets less than 2" NB size, all sizes of coupling and nipples etc. as required shall be suplied by contractor but no separate payments shall be made as it is covered under erection rate.

-

-

-

... More
Aboveground installation of Insulating Joint & Valves etc. Handling including lifting and transportation from COMPANY's warehouse to CONTRACTOR'S Stores and/or work site and installation of all types of valves, insulating joint including assembly of valve accessories, (if any) by bolting, threading or welding, supply and insertion of gaskets, nuts & bolts, nipples, etc. at all elevations of pipe sleepers, supports or overhead on racks, equipments nozzle, skid & painting etc. supply of all consumables, manpower, equipment, etc. for completion of all works as per scope of work and as per drawings, specifications and instructions of Engineer-in-charge including servicing/ cleaning of valve wherever requried.

-

-

-

... More
Flanged/ Welded Valves (Full Bore/ Reduced Bore) Ball / Globe / Check Valve

-

-

-

... More
Size: 4" NB Rating/ Schedule: 300#

4

-

-

... More
Size: 2" Rating/ Schedule: 300#

4

-

-

... More
Sockolet Welded Valve (Ball / Globe Valve)

-

-

-

... More
Size: 1½" NB Rating/ Schedule: 800#

4

-

-

... More
Size: 1" NB Rating/ Schedule: 800#

7

-

-

... More
Size: ¾" NB Rating/ Schedule: 800#

4

-

-

... More
Size: ½" NB Rating/ Schedule: 800#

4

-

-

... More
10" NB, 300# - Insulating Joints

1

-

-

... More
6" NB, 300# - Insulating Joints

1

-

-

... More
4" NB, 300# - Insulating Joints

1

-

-

... More
STRUCTURAL WORKS

-

-

-

... More
Supply of erection of single leaf mild steel gate 2.5m high with mesh upto 2m height and barbed wire fencing and 2m wide complete in all respect including painting as per TS on all MS items, all works as per specification and drawings excluding foundations and RCC beams.

4

-

-

... More
Supply of all materials, fabrication and erection of chain link fencing 2.5m high with mesh up to 2m height and barbed wire fenching complete in all respects including painting as per TS on all MS items, all works as per specification and drawings excluding foundation and RCC beams.

100

-

-

... More
Pipe Supports & Other Structures

-

-

-

... More
Supply, fabrication and erection of all types of pipe supports like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade/ trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, crossover, cable tray supports, etc. including painting suitable for highly corrosive area as per specification labour and supervision & complete work as per drawings, specifications and instruction of Engineerqw-incharge. (Bolts, nuts, washers, U-clamps etc. for supporting shall be supplied by the Contractor within the rates quoted. These items will not be measured and paid seperately). The work is to be completed in all respect as per scope of work and specification.

20

-

-

... More
Note: (I) The quantities indicated are estimated values and hence are approximate. Final payment will be made based on actual quantities to be certified by the Purchaser. (II) The cost of MS bolts (permanent and service(, washers, electrodes, putty, gases, cost of straightening the raw materials, cutting of flats from plates and providing splices, paints, tools, plants etc., as required for the work shall be deemed to be included in the quoted rates. (III) All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accrodance with time schedule, are deemed be included in the quoted rates.

-

-

-

... More
CIVIL WORKS

-

-

-

... More
Site Grading Excavation in earth and filling to the grades and levels shown in the approved drawings in all kinds of conditions including for Road embarkments, using approved quality good earth from designated borrow area, for all heights and depths including clearing and stripping (min. 150mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading in layers not exceeding 150mm thickness, breaking clods, watering (if reqd.), ramming and compacting by manual/ mechanical means to give minimum 92% of modified Proctor's density of earth, testing & dressing including disposal of all unserviceable material all complete as per specifications and directions of Engineer-in-charge. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, cost of borrow earth by way of royalties, right of way, cess etc., as applicable with all bye works and sundry works).

100

-

-

... More
Plain Cement Concrete Supplying and laying plain cement concrete (including shuttering of required) in all types of concrete works including levelling courses below foundation, substructure, superstrcuture, chambers, cable tranch, under floors and any other locations, at all leveies as per drawings, specifications and directions of the Engineer-in-charge.

-

-

-

... More
PCC 1:2:4 1 Cement : 2 Coarse sand : 4 stone aggregate 20mm nominal size.

50

-

-

... More
PCC 1:4:8 1 Cement : 4 Coarse sand : 8 stone aggregate 40mm nominal size. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering, earthwork in excavation and backfilling using approved earth in all conditions etc. with all bye works and sundry works.)

50

-

-

... More
Reinforced Cement Concrete Providing and laying reinforced cement of grade M-20 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers cable trench inlcuding constrcution joints, bitumen painting on surface in contact with soil, providing and fixing reinforcing steel, shuttering, inserts, finishes etc. at all depths and heights complete as per drawings, specifications and direction of the Engineer-incharge. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all maerials such as minimum 43 grade cement including sulphate resistant cement for substructures, R/F steel, Inserts, bolts, conduits, bitumen, other minor constrcution materials, shuttering, stanging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and syndry works.

60

-

-

... More
Concrete Pavement Providing and laying reinforced cement concrete of (M-20 grade) with 20mm and down grade crushed stone aggregate in pavement, including preparation of base (i.e. compacted subgrade, 200 thk sand and 50 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineerin- charge. 150 mm thick (Type-I)

200

-

-

... More
Brick Work Providing brick work with brick class designation M-7.5 of IS:1077 in cm1:4 (1 cement : 4 sand) in steps, walls, retaining walls and load bearing structures drains, or any shape with all lead, depths & height including curring, scaffolding, etc., as per specifications and drawings with all bye-works and direction of the Enfineer-in-charge. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement bricks, finishes, bitumen, other minor constrcution materials, shuttering, staging, masnory work, plastering, painting etc. with all bye-works and sundry works).

30

-

-

... More
TEMPORARY CATHODIC PROTECTION SYSTEM :- Design, detailed engineering, supply, installation, testing and commissioning of the temporary Cathodic protection system using Mg/ Zn galvanic anodes to protect the external surface of 3 LPE coated entire 5.5 km (approx.) long steel pipeline network against corrosion for design life of minimum 1 year or till commissioning of PCP system whichever is later as per standard specification No. MNGL/Steel/TS/15 for temporary cathodic protection system. Scope shall also include but not limited to the following for completion of jobs: a) Measurement of soil resistivity along the right of way of the main pipeline route as per specification for design & installation of anodes. b) Collection of additional data related to cathodic protection along the right of way of pipeline as per specifications. c) Supply, installation, testing & commissioning of one set of spark gap arrestor with 2 plate Zinc grounding cell of 20 kg net weight each across each insulating joint as per specification. d) Supply, installation, testing & commissioning one set of polarisation cell with zinc anode at all high tension (66KV or higher) electrical power transmission line/Equipment crossing or running parallel to the pipeline for grounding purpose as per specification. The rating shall depend upon anticipated fault current & ground bed resistance at the location of installation. However, the rating of polarisation cell (krick) shall not be less than 5 KA & number of 20 kg net weight zinc anode shall not be less than two. e) Supply & installation of Zinc Ribbon Anodes at 4-8 O’Clock position in the interval of 2 metre (max.) on carrier pipes at all cased crossings i.e. railways/ roads etc. f) Monitoring of the protection system for 6 months. g) All civil/ structural works related to TCP system including supply of bricks, cement & steel etc. required for completion of the system.

-

-

-

... More
For 10"

5300

-

-

... More
For 6"

120

-

-

... More
For 4"

200

-

-

... More
(I) The quantities mentioned above are tentative and quantities for above including supply items shall be finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner. (II) For all the supply items mentioned above, procurement shall be made as per specification & Data Sheets, after due approval of Engineer-in-charge.

-

-

-

... More
FIELD INSTRUMENTATION

-

-

-

... More
PRESSURE INSTRUMENTS:- Supply , Installation of Pressure Gagues and their accessories inclusive of supply of necessary piping materials and tubings alongwith all necessary valves & fittings, fabrication and installation of impulse lines/ manifolds & hydraulic testing (exclusive of calibration of instruments) as per installation standard attached elsewhere in Tender Document and Supply as per Data Sheet No.MEC/23K8/05/E5/I/001/DS-PG. Give breakup of supply and Installation rate.

1

-

-

... More
TEMPERATURE INSTRUMENTS : Supply , Installation of Temperature Gauges with flanged Thermowell inclusive of installation of thermowell on the nozzle and installation of instruments (exclusive of calibration of instruments) as per installation standard attached elsewhere in Tender Document and Supply as per Data Sheet No. MEC/23K8/05/E5/I/001/DS-TG. Give breakup of supply and Installation rate.

1

-

-

... More
CALIBRATION Calibration of the instruments listed below including removal of instruments from pre-installed locations like panels, enclosure racks, fields etc. and refixing them back in respective/ required places, providing equipments, necessary test jigs, instrument air and all consumables. Calibration reports shall be prepared and to be submitted to the Purchaser/ Consultant.

-

-

-

... More
Pressure Gauges

1

-

-

... More
Temperature Gauges

1

-

-

... More
Note:- (I) The quantities mentioned above are tentative and quantities for above including supply items shall be finalised & procured by Contractor only after due approval of EIC. Contractor supplied any surplus item during reconciliation shall not be accepted / taken by the Owner. (II) For all the supply items mentioned above, procurement shall be made as per specification & Data Sheets, after due approval of Engineer-in-charge.

-

-

-

... More
Laying of MDPE pipe along with Steel pipe line Excluding supply of all MDPE pipe (PE 80/100,SDR11), but Including supply of Bends, Couplers, End caps, Tees, PE Reducer, CS to PE Fitting, Saddle Tapping, Warming mat, etc. as required to complete the job. ( Particular job specification.) "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied MDPE line pipes (PE80/100, SDR11) of all sizes (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover , including supply of accessories of all sizes & thickness like Bends, Couplers, End caps, Tee, PE Reducer, CS to PE Fittings, Saddle Tapping, Warning Mat, etc.. Stringing/ uncoiling of the MDPE line pipe on the pipeline Right-of-Use, laying/ installation of MDPE line pipe alongwith steel pipeline (alongwith installation of required accessories as mentioned above) of following sizes, including executing all works; fabrication, access for construction; supply of all materials (except Owner supplied materials), consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated stockyard(s); carrying out all temporary, ancillary, auxiliary works required to make the MDPE pipeline ready for commissioning as per drawings, specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
UP to Dia 90mm

100

-

-

... More
Dia 125mm

5500

-

-

... More
Note : The quantities indicated above against all individual item are tentative and may vary considerably depending upon site condition, methodology adopted as per site requirement with due approval of Owner/ Consultants.

-

-

-

... More
PIPING WORKS FOR SECTIONALISING VALVE STATION-CUM-TAP-OFF POINT All works for fabriaction and installation of all piping above ground at all elevations and below ground at all depth for Sectionalising Valve Station alongwith preparation of construction drawings duly approved by EIC, in all type of terrains and soils including transportation and handling of all Owner supplied materials i.e. extended stem butt welded sectionalising gas actuated ball valve, other types of valves, line pipes for mainline, 4" NB pipe for all branch line including ventlines from Owner's designated place(s) of issue to work site. Contractor shall supply all required size & type of piping material like pipes, fittings & flanges etc. as per PMS alongwith 2" NB pipe for all branch line & vent line (wherever required) including supply of all consumables, manpower, machinaries, materials etc. and carrying out all mechanical works of underground and above ground piping including fabrication, welding, nondestructive testing of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, cutting of mainline and bevelling (if required) assembly, including radiography of tie-in joints, corrosion, coating and external painting as required, installation of instruments like pressure/ temperature instruments/ gauges alongwith complete SS Tubing works including supply of SS Tube and thier accessories etc., as required, obtaining all statutory clearances, approvals and permissions for the works (wherever required), making of valve pit (for detail refer relevant drawings) for SV Stationscum- tap-off points enclosed with tender filled with sand, excavation and filling in all types of soils including soft/ hard rock for installation of piping/ pipe supports providing pipe supports, area fencing and gate including all associated civil and structural works; painting, finishing, clean-up and restoration of site; preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge. In this item, instead of Brick Work RCC will be done

-

-

-

... More
Type - I SV Station on 10" Pipeline

2

-

-

... More
Note: i) Work under above items are exclusive of all works associated with main pipeline covered under Item No. 1.0 to 4.0 above. ii) All civil/ structural works including area fencing and gate, valve pits except for piping support will be paid separately as per unit rate provided elsewhere in the SOR. iii) All coupling, nipples etc. as required shall be suplied by contractor but no separate payments shall be made as it is covered under above item rate.

-

-

-

... More
Details of Major Road Crossing (NH/SH/Railway): Supply, Installation & Insertion of pipeline across National/ State Highways/Railways as per SCC and technical specifications

-

-

-

... More
Supply & Installation of 24" NB x 6.4mm Wall thk. Casing pipe for Line Pipe 10"NB(6.4 mm thk API X52) & 4" NB, 6.4 mm thk API X 52 pipe by Jacking Boring . Including Insertion of 10" dia and 4" dia (for 125 mm dia MDPE Connectivity) Carrier pipeline in 24" dia casing pipe and connectivity with existing pipeline at both end of National Highways/State Highways/ Railway as per SCC and technical specifications -Supply of Casing Pipe Supply of following casing pipe including handling, loading, transportation & unloading etc. to contractor's own stock yard / worksite(s). -After Completion of insertion of carrier pipe with Connectivity at both end including all works as per the scope of work -Post Hydro testing & Commissioning , Submission of as-built drawing, Submission of Documents - The rates shall include bore holes for soil investigation, collection of disturbed samples from bore holes and visual engineering classification of soil at crossing location. Minimum 2 nos of bore holes ( 01 no each at both end of crossing) are required on each crossing and submission of detailed report to Company.Boreholes shall be made at locations as direct by Engineer in-charge at crossing location to find out the presence of rock strata. Boring shall be carried out in accordance with the provision of IS:1892. Minimum diameter of boring shall be 150 mm. - Rate Should include supply & installation of 250mm Casing pipe for 4" Steel Pipeline for MDPE (if required by Authority & as per the instructions of EIC)

-

-

-

... More
Note: (i) Crossing width may vary as per site condition. Tenderer are advised to visit site for actual assessment of extent of crossing. Actual length of Boring shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. However final length of string & cover from top of pipe shall be decided by concerned Authority/ Engineer-in-charge. (ii) Payment for the length of final tied-in carrier pipeline string with mainline made for crossing laid by Boring method are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere. (iii) The Contractor has to quote alongwith 4" NB (for 125mm MDPE). No any extra payment shall be made against this item. (iv) Width of above crossings indicated are tentative. The width indicated are not for any single crossings. This shall be as per requirement at site for crossings at different locations. (v) Actual length & cover from top of casing pipe string may vary depending upon site conditions, approved drawings, specification etc. and / or as decided by concerned Authority / Engineer-in-charge. (vi) No Extra Payment for supply & installation of Zinc ribbon to be provided to Carrier pipe & Zinc Anode is to be provided to Casing pipe and its design included in above item

-

-

-

... More
Supply and installation of 24'' casing pipe,Preparation of required length of carrier pipeline welded string including all other works as mentioned in item no. 1.0 to 4.0 above and specification/drawings. Insertion of carrier pipeline welded string including all other works as mentioned in item no. 1.0 to 4.0 above and as per specification/ drawings. Insertion of carrier pipe in casing pipe after above ground pretesting at specified test pressure and installation of casing insulators & Zinc ribbon anode as per specification/ drawings. Installation of vent and drain assembly, fixing of end seals, backfilling and restoration as original of the facilities crossed and performing all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 to 4.0 above) and as per specification, approved procedure, drawing etc. and instruction of Engineer-in-charge and provision of contract document, getting NOC from all concerned Authority of the facilities crossed (Other than hard rock)

25

-

-

... More
Supply and installation of 24'' casing Pipe,Preparation of required length of carrier pipeline welded string including all other works as mentioned in item no. 1.0 to 4.0 above and specification/drawings. Insertion of carrier pipeline welded string including all other works as mentioned in item no. 1.0 to 4.0 above and as per specification/ drawings. Insertion of carrier pipe in casing pipe after above ground pretesting at specified test pressure and installation of casing insulators & Zinc ribbon anode as per specification/ drawings. Installation of vent and drain assembly, fixing of end seals, backfilling and restoration as original of the facilities crossed and performing all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 to 4.0 above) and as per specification, approved procedure, drawing etc. and instruction of Engineer-in-charge and provision of contract document, getting NOC from all concerned Authority of the facilities crossed (in hard rock)

25

-

-

... More
Supply & Installation of 18" NB x 6.4mm Wall thk. Casing pipe for Line Pipe 4"NB, 6.4 mm thk API X52 & 4" NB, 6.4 mm thk API X 52 pipe by Jacking Boring . Including Insertion of 4" dia and 4" dia (for 125 mm dia MDPE Connectivity) Carrier pipeline in 18" (450 mm) dia casing pipe and connectivity with existing pipeline at both end of National Highways/State Highways/ Railway as per SCC and technical specifications -Supply of Casing Pipe Supply of following casing pipe including handling, loading, transportation & unloading etc. to contractor's own stock yard / worksite(s). -After Completion of insertion of carrier pipe with Connectivity at both end including all works as per the scope of work -Post Hydro testing & Commissioning , Submission of as-built drawing, Submission of Documents - The rates shall include bore holes for soil investigation, collection of disturbed samples from bore holes and visual engineering classification of soil at crossing location. Minimum 2 nos of bore holes ( 01 no each at both end of crossing) are required on each crossing and submission of detailed report to Company.Boreholes shall be made at locations as direct by Engineer in-charge at crossing location to find out the presence of rock strata. Boring shall be carried out in accordance with the provision of IS:1892. Minimum diameter of boring shall be 150 mm. - Rate Should include supply & installation of 250mm Casing pipe for 4" Steel Pipeline for MDPE (if required by Authority & as per the instructions of EIC

-

-

-

... More
Supply and installation of 18" (450 mm) casing pipe,Preparation of required length of carrier pipeline welded string including all other works as mentioned in item no. 1.0 to 4.0 above and specification/drawings. Insertion of carrier pipeline welded string including all other works as mentioned in item no. 1.0 to 4.0above and as per specification/ drawings. Insertion of carrier pipe in casing pipe after above ground pretesting at specified test pressure and installation of casing insulators & Zinc ribbon anode as per specification/ drawings. Installation of vent and drain assembly, fixing of end seals, backfilling and restoration as original of the facilities crossed and performing all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 to 4.0 above) and as per specification, approved procedure, drawing etc. and instruction of Engineer-in-charge and provision of contract document, getting NOC from all concerned Authority of the facilities crossed (Other than hard rock)

25

-

-

... More
Supply and installation of 18'' (450 mm) casing Pipe,Preparation of required length of carrier pipeline welded string including all other works as mentioned in item no. 1.0 above and specification/drawings. Insertion of carrier pipeline welded string including all other works as mentioned in item no. 1.0 above and as per specification/ drawings. Insertion of carrier pipe in casing pipe after above ground pretesting at specified test pressure and installation of casing insulators & Zinc ribbon anode as per specification/ drawings. Installation of vent and drain assembly, fixing of end seals, backfilling and restoration as original of the facilities crossed and performing all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 above) and as per specification, approved procedure, drawing etc. and instruction of Engineer-in-charge and provision of contract document, getting NOC from all concerned Authority of the facilities crossed (in hard rock)

25

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.