Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Maharashtra Natural Gas Limited - MNGL Tender

Services
Civil And Construction
Pipe Line Project
Eprocure
Opening Date27 Dec 2023
Closing Date17 Jan 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. Grading the ROU, barricading the work area as per local authorities norms & to satisfaction of EIC, installation of safety signs, trenching to required depth, repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner/other utility agencies). Uncoiling/ stringing of pipes, clamping, jointing of the pipe ends/ fittings/ valves by qualified personnel using approved electro-fusion techniques as per specification.

-

-

-

... More
Excavation of trench and Lowering the pipeline in trench to required depths, placement of HDPE warning grid mat over the pipeline along the complete route, padding around pipeline with suitable approved soil, backfilling with available excavated material after screening, compaction with jumping jack compactor and water at subsequent layers of 150mm above warning mat. All tiles/slabs/curb stones etc removed during excavation shall be placed properly. Roads, pavements, footpaths etc. to be made motorable wherever pipeline is laid. MDPE Pipe shall be laid in such a way so that top cover of MDPE Pipe is 1.0 mtr. However in case if additional depth (up to 1.5 mtr) required due to any reason shall be coverd in this SOR.

-

-

-

... More
Installation and electro-fusion jointing of valves wherever required and as directed by Engineer-in-charge. Restoration of area to original condition, including cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per the specifications, instruction of Owner/Engineer-in-charge and to the satisfaction of local authorities. Restoration of all surrounding ground features to that existing before as detailed out in the specifications and as directed by Engineer-in-charge which would include replanting of any uprooted trees etc. Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge.

-

-

-

... More
Maintaining the completed pipelines/ installation for any defect, failures during defect liability period (i.e. 12 months from date of completion of work). Handing over the completed works to MNGL for their operation/ use, returning of all free issue surplus material to MNGL stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from MNGL/Consultant.

-

-

-

... More
Preparation and submission of Daily progress report, Laying Graphs/ PE/ GI line cards. On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.

-

-

-

... More
Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to MNGL.

-

-

-

... More
Supply and installation of GI sleeve(21/2" and 3" as instructed by EIC) with concrete mix (Pedestal) and filling it with sand, sealing the annuals, Inserting of MDPE pipe in Hume pipe for road crossing, supply of soft soil if required for padding comes under this SOR is in the contractor's scope. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge is included in this SOR item.Liasioning and Follow-up for permission with all the concerned customer, society members, chairmans etc. is the Contractor's scope.

-

-

-

... More
Primary responsibility of contractor is to obtain permission from various authorities & management of sites with respect to completion of all works under this SOR

-

-

-

... More
1.1 a : 20 & 32 mm

40752

-

-

... More
1.1 b: 63 & 90 mm

25470

-

-

... More
1.1 c: 125 mm

25470

-

-

... More
1.1d: 180 mm

10

-

-

... More
1.2) Double Laying in same trench

-

-

-

... More
Excluding supply of all MDPE pipe (PE 80/100,SDR11), but Including supply of all the fittings like Bends, Couplers, End caps, Tees, PE Reducer, CS to PE Fitting, Saddle Tapping, Warming mat etc. as required to complete the job (Particular job specification). "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied MDPE line pipes (PE80/100, SDR11) of all sizes (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover , including supply of accessories of all sizes & thickness like Bends, Couplers, End caps, Tee, PE Reducer, CS to PE Fittings, Saddle Tapping etc. This SOR covers the laying of lower size MDPE pipe, its jointing, testing, commissioning, submission of laying reports,liasioning,permissions of all authority, as-built and other documents etc. as instructed by EIC. Laying of higher size MDPE pipe, its jointing, testing and commissioning will be paid as per the SOR 1.1 & jointing, testing and commissioning of smaller size of pipe shall be paid in this SOR.

-

-

-

... More
Primary responsibility of contractor is to obtain permission from various authorities & management of sites with respect to completion of all works under this SOR

-

-

-

... More
1.2 a: 20 & 32 mm

5000

-

-

... More
1.2 b :63 & 90 mm

5000

-

-

... More
1.3) Insertion of MDPE in already laid hume pipe

-

-

-

... More
Excluding trenching work and supply of all MDPE pipe (PE 80/100,SDR11), but Including supply of Bends, Couplers, End caps, Tees, PE Reducer, CS to PE Fitting, Saddle Tapping, Warning mat etc. as required to complete the job (Particular Job Specification). "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied MDPE line pipes (PE80/100, SDR11) of all sizes (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including supply of accessories of all sizes & thickness like Bends, Couplers, End caps, Tee, PE Reducer, CS to PE Fittings, Saddle Tapping, Warning Mat etc. Also fulfilling the other conditions mentioned in SOR item No. 1.1 &1.2 except trenching work. However if excavation of pits required for insertion of MDPE pipes or any other works for completion of the job as per the instructions of EIC shall be covered in this SOR.

-

-

-

... More
Primary responsibility of contractor is to obtain permission from various authorities & management of sites with respect to completion of all works under this SOR

-

-

-

... More
1.3 a: 20 & 32 mm

100

-

-

... More
1.3 b: 63 & 90 mm

100

-

-

... More
1.3 c: 125 mm

100

-

-

... More
1.3 d: 180 mm

1

-

-

... More
1.4)Excavation of hard rock

1100.42

-

-

... More
Excavation of hard rock, wherever hard rock of single piece exceeding 1.5m in length removable by pneumatic chisel/ drill as per specifications and direction of EIC including all permissions,safety precuations,removing of debris. Boulders 1.5 mtrs, shall not be considered under this SOR.

-

-

-

... More
1.5)Testing and commissioning of already laid MDPE pipe of all sizes

-

-

-

... More
Pneumatic testing, purging with nitrogen & Commissioning of already laid MDPE Pipe (PE 80/100, SDR 11) including supply of manpower, labour (to identify the leak / making the pits), jointing of fittings, its installation and manpower, labour (for making the pits) etc. and submission of final documents (Like: As-built etc) comes under SOR (1.5.a) and tapping from main line/charged line is the scope of contractor. The supply of all kind of MDPE fitting including TF etc is covered under the SOR 1.8(b,c,d)

-

-

-

... More
Primary responsibility of contractor is to obtain permission from various authorities & management of sites with respect to completion of all works under this SOR

-

-

-

... More
This SOR also includes any restoration,liasioning,barricades deployment,pit which needs to be done in order to complete the job.

-

-

-

... More
1.5 a:Jointing,testing,commissioning of MDPE pipe of all size

5000

-

-

... More
1.5 b:Jointing of 20 mm & 32 mm

10

-

-

... More
1.5 c: Jointing of 63 mm,90 mm & 125 mm

10

-

-

... More
1.5 d: Jointing of 180 mm

1

-

-

... More
1.6) Crossing of Utilities/Drain/Culverts/Nala

-

-

-

... More
Excluding supply of all types of MDPE pipes (PE 80/100,SDR11), but Including supply of all types of MDPE fittings, Warming mat etc. as required to complete the job (Particular job specification). "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied MDPE line pipes (PE80/100, SDR11) of all sizes (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover , including supply of accessories of all sizes & thickness like Bends, Couplers, End caps, Tee, PE Reducer, CS to PE Fittings, Saddle Tapping etc. This SOR covers the laying/installation of all sizes of MDPE pipes, its jointing, testing, commissioning, submission of laying reports, as-built drawings and other documents etc. as per the instructions of EIC. All types of nala crossing for any length covered in this SOR

-

-

-

... More
Above ground laid MDPE pipe shall be protected by RCC i.e. all sides of MDPE Pipe covered by 4" thick RCC. Providing and laying reinforced cement of grade M-20 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers cable trench including construction joints, bitumen painting on surface in contact with soil, supplying and fixing reinforcing steel, shuttering, inserts, finishes etc. at all depths and heights complete as per drawings, specifications and direction of the Engineer-in-charge. Unit rate includes cost of labours, tools, tackles, equipment, equipment hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/F steel dia 12mm, Inserts, bolts, conduits, bitumen, other minor construction materials, shuttering, stanging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.

-

-

-

... More
This SOR also includes any restoration,liasioning,barricades deployment,pit which needs to be done in order to complete the job.

-

-

-

... More
1.6 a: Above ground Crossing of Culverts/Nala

509.4

-

-

... More
Excluding supply of all types of MDPE pipes (PE 80/100,SDR11), but Including supply of all types of MDPE fittings, Warming mat etc. as required to complete the job (Particular job specification). "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied MDPE line pipes (PE80/100, SDR11) of all sizes (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover , including supply of accessories of all sizes & thickness like Bends, Couplers, End caps, Tee, PE Reducer, CS to PE Fittings, Saddle Tapping etc. This SOR covers the laying/installation of all sizes of MDPE pipes, its jointing, testing, commissioning, submission of laying reports, as-built drawings and other documents etc. as per the instructions of EIC.

-

-

-

... More
Suitable size of HDPE casing (NP6 standard) shall be provided by the vendor in case of underground nala / culvert crossing.

-

-

-

... More
Additional material like shuttering for supporting the side wall of the trench or any other material / things required for safe working for completion of job / as per instructions of EIC shall be in the scope of contractor and covered under this SOR.

-

-

-

... More
This SOR also includes any restoration,liasioning,barricades deployment,pit which needs to be done in order to complete the job.

-

-

-

... More
1.6 b: Under ground Crossing of Culverts/Nala

1000

-

-

... More
1.7) Material Cost for Supply of Concrete Sleeves / HDPE Sleeves: Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge.

-

-

-

... More
This SOR is not applicable for MOC purpose protection which needs to be given as per instructions of AIC/EIC.

-

-

-

... More
1.7 a: Supply 4” NB, 1m

10

-

-

... More
1.7 b: Supply 6” NB, 1m

10

-

-

... More
1.7 c:Supply 8” NB, 1m

10

-

-

... More
1.7 d:Supply 10” NB, 1m

10

-

-

... More
1.8) Construction of RCC valve chamber and Installation of Extended Stem valve Construction of RCC valve chamber should be done with as per the tender drawing with/without supply of extended stem PE ball valve with/with out purge as instructed by EIC. This SOR covers the supply of required MDPE fittings to install the extended stem valve, manpower, material, tools, equipment etc.

-

-

-

... More
Unit rate includes cost of labours, tools, tackles, equipment, equipment hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/F steel dia 12mm,SFRC chamber cover,barricading, liasioning, permissions,etc.

-

-

-

... More
This SOR also includes any restoration,liasioning,barricades deployment,pit which needs to be done in order to complete the job.

-

-

-

... More
1.8 a: Construction of RCC valve chamber & installation with supply Extended stem PE Ball valve

30

-

-

... More
1.8 b: Construction of RCC valve chamber & installation with out supply Extended stem PE Ball valve

70

-

-

... More
Fabrication & Installation of Markers

-

-

-

... More
RCC Route Markers: Supply, fabrication and installation of RCC route markers as per the attached drawings, along the route including all associated civil works such as excavation and construction in all types of soils, construction and pedestals and grouting with concrete.

-

-

-

... More
1.9 a: RCC Route Markers as per Sketch enclosed.

1019

-

-

... More
Plate Marker: Supply, fabrication and installation of plate markers, including application of approved color and quality of primer and paint, stencil letter cutting of lettering, numbers, direction, chainage, etc. as per the attached drawings to be installed on the ROU

-

-

-

... More
1.9 b: Plate Markers without Foundation As per Sketch enclosed.

975.04

-

-

... More
1.10) CIVIL WORKS (Preparation of Construction of MRS, DRS Foundation etc.)

-

-

-

... More
Site Grading Earth in excavation and filling to the grades and levels shown in the approved drawings in all kinds of conditions including for Road embakments, using approved quality good earth from designated borrow area, for all heights and depths including clearing and stripping (min. 150mm) of the area marked for filling, taking spot levels, consolidating the exposed natural soil surface, excavating the earth from borrow area loading, transporting & unloading, spreading in layers not exceeding 150mm thickness, breaking clods, watering (if reqd.), ramming and compacting by manual/ mechanical means to give minimum 92% of modified Proctor's density of earth, testing & dressing including disposal of all unserviceable material all complete as per specifications and directions of Engineer-in-charge. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, cost of borrow earth by way of royalties, right of way, cess etc., as applicable with all bye works and sundry works).

-

-

-

... More
1.10 a: Site grading

10

-

-

... More
PCC 1:2:4 1 Cement : 2 Coarse sand : 4 stone aggregate 20mm nominal size. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering, earthwork in excavation and backfilling using approved earth in all conditions etc. with all bye works and sundry works.)

-

-

-

... More
1.10 b: PCC 1:2:4

10

-

-

... More
PCC 1:4:8 1 Cement : 4 Coarse sand : 8 stone aggregate 40mm nominal size. (Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering, earthwork in excavation and backfilling using approved earth in all conditions etc. with all bye works and sundry works.)

-

-

-

... More
1.10 c: PCC 1:4:8

10

-

-

... More
Reinforced Cement Concrete Providing and laying reinforced cement of grade M-20 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers cable trench including construction joints, bitumen painting on surface in contact with soil, supplying and fixing reinforcing steel, shuttering, inserts, finishes etc. at all depths and heights complete as per drawings, specifications and direction of the Engineer-in-charge. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement including sulphate resistant cement for sub-structures, R/F steel dia 12mm, Inserts, bolts, conduits, bitumen, other minor construction materials, shuttering, stanging, earthwork in excavation and backfilling using serviceable earth in all conditions, shorting bailing and pumping out water, testing of concrete, curing etc. with all bye works and sundry works.

-

-

-

... More
1.10 d:Reinforced Cement Concrete

1

-

-

... More
1.11)Shifting & installation of DPRS/IPRS/MRS/SRM/DCS etc. Receiving and taking over, handling, loading, transportation and unloading of Owner's supplied MRS/DRS up to 10 T from Owner's designated stack-yard to Contractor's stock yard/workshop/work-site including preliminary activities. This SOR also covers the installation of MRS/DRS on site, including the supplied of all required material and tools which is required to installed the MRS/DRS(Like: Fixing of Unit, Earthling etc.). Providing, Earthing of IPRS and DPRS - Testing and certification of earthing stations including providing and laying 300 x 300 x 3 mm GI plate as a electrode To form earth electrode with inspection chamber, 300 x300 mm Chamber with earth link cover, painting and identification etc.(Scope including excavation by manual/Machines /Boaring, Charcoal, salt, or Bentonie slurry, BFC, construction of chamber etc as per drawing) to complete the job in all respect as per satisfaction of EIC) The contractor shall pay LUMSUM charges for shifting of MRS, DRS up to 10 Ton Capacity which includes loading, unloading by cranes, manpower, tools and tackles, ropes , vehicle required for shifting of MRS/DRS , managing transit issues etc. in a safe manner. Damage of assets will recover from contractors. Shifting activities will perform as directed by AIC/EIC with proper documentation & written mail communications.

-

-

-

... More
1.11 a:Shifting of DPRS/IPRS/MRS/SRM/DCS

5

-

-

... More
1.11 b:Installation of DPRS/IPRS/MRS/SRM/DCS

5

-

-

... More
1.12) Restoration of trenches

-

-

-

... More
Restoration of the roads, pavements, channels, footpaths, tiles etc. (in case of inter locking tiles/paver blocks, farshi etc it is contractor's responsibility to remove it safely and carefully to restore after pipe laying, testing and compaction) to original condition including supply of the approved quality material required, as per local authorities norms and MNGL specification, obtaining NOC from concerned local authorities/ land owners/ third party inspection agencies designated by MNGL and to the satisfaction of Engineer-in-charge.

-

-

-

... More
Restoration of trenches for Ashphalted/Bituminous Roads: Restoration to original condition of dismantaled surface like Asphalted/Bituminous Road, Concrete pavement, Agra/Kota Stones /Tiles (Chequered / Interlocking etc.), Dry Brick Pavement, as per the technical specifications attached in the tender after laying of pipeline in built-up surface, as per directions of EIC / Site Incharge. Scope includes supply of the approved quality of material , testing of material by third party agencies as per technical specification / PMC / PCMC / PWD / National Highways / JNNURM / Military Engineering Services / Gram Panchayat / Railways or any other government / private authority standards, Submission of restoration reports, obtaining no objection certificate from the concern authorities / land owners / third party inspection agencies designated by land owning agencies and owner.

-

-

-

... More
This SOR also covers any repair/rework which needs to be done till closure of Service order/till DLP is completed.

-

-

-

... More
1.12 a:Restoration of trenches for Ashphalted/Bituminous roads

100

-

-

... More
Cement Concrete Surface: Top Surface- PCC 1:2:4, Min as original thickness compacted with plate vibrator shall be laid over base course.Base course- PCC 1:5:10, min 75mm thick laid over compacted backfilled earth.

-

-

-

... More
Chequered Cement concrete Tiles/Pre-cast CC Tiles/Kota stone floor/red stone floor. Inter locking CC/paver black:Top Surface- Tiles/floor (as per original surface) shall be laid over cement Sand Mortar 1:6,min 20mm thick over base course.Base course- PCC 1:5:10, min 75mm thick laid over compacted backfilled earth.

-

-

-

... More
This SOR also covers any repair/rework which needs to be done till closure of Service order/till DLP is completed.

-

-

-

... More
1.12 b: Restoration of trenches for Concrete/existing Tiles/existing Paver Blocks/existing Farshi

20376

-

-

... More
1.12 b: Restoration of trenches for new Tiles/new Paver Blocks/new Farshi

8150.4

-

-

... More
1.13)Groove cutting: Groove cutting in RCC/CC/PCC etc. with supply of all type of tools, material, manpower, helper etc as required and bitumen filling (if required) in the gap after the trench restoration as per specifications and cleaning the area complete to the satisfaction of EIC. In this SOR, One (1) running mtr means cutting of both side of the trench or Per running trench length.

10000

-

-

... More
1.14)Structural work (Like-Fencing of DPRS/IPRS etc) : Supply of all materials, fabrication and erection of chain link fencing (inclusive the gate, same as chainlink fencing) 2.1m high with mesh up to 2m height and barbed wire fenching complete in all respects including painting as per TS on all MS items, all works as per specification and tender drawing, complete to the satisfaction of EIC.

5

-

-

... More
1.15)Service Regulator

-

-

-

... More
Service Regulator: Excluding the Supply of SR but including the supply of approved quality of sand, brick, cement, paint etc for preparation of foundation & installing of service regulator firmly on foundation as per drawing enclosed & as per specifications and cleaning the area. Complete the job as per the instruction and satisfaction of EIC.

-

-

-

... More
1.15 a:Service regulator 25 & 50 SCMH(4 bar to 100 mBar)

400

-

-

... More
1.15 b:Service regulator 100 & 200 SCMH(4 bar to 100 mBar)

30

-

-

... More
1.16) Deployment of Safety Barricades

45855

-

-

... More
Contractor shall deploy the Safety barricades on the sites where Medium Pressure (MP) Pipeline (out site the society) works going on the main roads of any Govt./Pvt authority. In this SOR payment shall be made on the running meter basis. Quantity shall be varified according to SOR item no. 1. Deployed barricades shall be as per approved drawing by EIC. For claim Contractor has to submit the colored photographs with location identification/landmark with back filling report and contractor shall ensure the maximum 1m gap between two safety barricades which shall be covered by caution tape at least minimum three points/location. If fails contractor shall not be eligible for payment.

-

-

-

... More
1.17) LMC(Last Mile connectivity) for commercial connection in gasified area

10

-

-

... More
Start to End MDPE & GI connectivity till commissioning and submission of JMR

-

-

-

... More
1.18) Liasioning LS rate for commercial connection upto 100 Mtr in gasified area

10

-

-

... More
The contractor shall pay the lumsum liasioning charges for executions of commercial connection having MDPE laying of less than Or up to 100 meters. Liasioning rate will get to contractors only after successful laying, testing/commissioning shown by the contractor to respective AIC. Lumpsum Liasioning will pay for, follow-up , day to day site co-ordination for permission/issues with all concerned authorities and boards viz PMC, PCMC, MIDC, PWD, RAILWAYS , NH, DEFENCE, LOCAL MUNICIPAL, PANCHAYAT, ELECTRICITY, REC, RES, SEWAGE WATER, DRINKING WATER, FOREST,OWNERS OF OFC,TRAFFIC,PRIVATE LAND OWNER, FIRE BRIGADE , LAW & ORDER,SHOP KEEPERS ETC.

-

-

-

... More
1.19)Lumpsum Liasoning Rate upto 100 Mtrs for execution of Industrial Connections

5

-

-

... More
The contractor shall pay the lumsum liasioning charges for executions of industrial projects having MDPE laying of less than Or up to 100 meters. Liasioning rate will get to contractors only after successful laying, testing/commissioning shown by the contractor to respective AIC. Lumsum Liasioning will pay for, follow-up , day to day site co-ordination for permission/issues with all concerned authorities and boards viz PMC, PCMC, MIDC, PWD, RAILWAYS , NH, DEFENCE, LOCAL MUNICIPAL, PANCHAYAT, ELECTRICITY, REC, RES, SEWAGE WATER, DRINKING WATER, FOREST,OWNERS OF OFC,TRAFFIC,PRIVATE LAND OWNER, FIRE BRIGADE , LAW & ORDER,SHOP KEEPERS ETC.

-

-

-

... More
1.20) Last Mile Connectivity for Industrial Customer where MRS installation has been done 1) Start to End MDPE Connectivity. 2) MRS Foundation White washing/Painting

5

-

-

... More
1) The contractor shall pay last mile connectivity (LMC) charges only after successful testing, commissioning of MDPE network, commissioning of MRS, installation of root /plate markers, completion of allied activities & submission of the related documents to AIC/EIC. 2) The contractor shall paint (double coat) the MRS foundation by Oil Paint / exterior paint as directed by AIC/EIC

-

-

-

... More
1.21) Last Mile Connectivity for Industrial Customer where Non-domestic meter installation is done 1) Start to End MDPE Connectivity. 2) Foundation White washing/Painting

5

-

-

... More
1) The contractor shall pay last mile connectivity (LMC) charges only after successful testing, commissioning of MDPE network, commissioning of Non-Domestic Meters, installation of root /plate markers, completion of allied activities & submission of the related documents to AIC/EIC. 2) The contractor shall paint (double coat) Non-Domestic Meters foundation/wall, supports by Oil Paint / exterior paint as directed by AIC/EIC.

-

-

-

... More
1.22) Laying of service line for tap-off upto 8 meter (MDPE pipe Dia. 32mm)

500

-

-

... More
Taking tap-off from existing charged line and laying of MDPE Service Lines (32mm) upto 8 meter (LMC work) SOR includes laying of pipeline (32mm) in all surfaces (Excluding supply of MDPE pipes (PE 80/100,SDR11), but Including supply of Bends, Couplers, End caps, Tees, PE Reducer, CS to PE Fitting, Saddle Tapping, Warning mat, GI sleeves, construction of Pedastal/TF guard, restoration of both the pits (saddle & TF) etc. as required to complete the job.) The SOR also includes liaisoning work with concerned authorites, house owners, housing societies etc. The fix length of 8 meters will be measured from the saddle/tap off point up to the TF after takinng tap off from existing charged line.

-

-

-

... More
1.23) Painting of Old Entire MRS (Includes Internal Piping , Body etc) - Spray Painting

-

-

-

... More
1.23 a:Upto 500 SCMH

1

-

-

... More
1.23 b:Above 500 SCMH

1

-

-

... More
As per the directives of AIC/EIC, Old MRS will be painted by spray painting machine which includers cleaning of MRS, Paint, Thinner, Spray Painting machine, gun, labour, supervisors & allied materials. Colour codes will inform by AIC/EIC. Painting includes complete MRS body (internally & externally), internal piping’s, supports etc. painting with double coat oil paint recommended by AIC/EIC. Also, contractor has to change the MRS glass/fibre sheet along with packing, minor repairs of body as directed by AIC/EIC. Rubber packing to pipeline, insulation to U-clamps etc.

-

-

-

... More
1.24) Painting of Old Entire MRS (Includes Internal Piping , Body etc) - Manual Painting (Brush,Roller etc)

-

-

-

... More
1.24 a: Upto 500 SCMH

1

-

-

... More
1.24 b: Above 500 SMH

1

-

-

... More
As per the directives of AIC/EIC, Old MRS will be painted by manual painting (brush, Roller etc) which includers cleaning of MRS, Paint, Thinner, labour, supervisors & allied materials. Colour codes will inform by AIC/EIC. Painting includes complete MRS body (internally & externally), internal piping’s, supports etc. painting with double coat oil paint recommended by AIC/EIC. Also, contractor has to change the MRS glass/fibre sheet along with packing, minor repairs of body as directed by AIC/EIC. Rubber packing to pipeline, insulation to U-clamps etc.

-

-

-

... More
1.25 a: HDD Laying(Dia.63,Dia.90 and Dia.125)in Soft soil surface

500

-

-

... More
MDPE Pipe laying in soft soil/murum,using HDD Technicque- Scope of works includes- i) All the fittings in the scope of vendor ii)All types of required survey i.e.Utility survey,GPR Survey,Route Survey & any other survey as required iii) Arrangement of water iv) Excavation for entry & exit pit& acces forpalcement of HDD Machine v) Bentonite & polymer mixing & disposal of used material i.e.water,debris & other material from site. vi) HDD Machine transportation. vii) Liasioning,Laying,Testing with all joints,commissioning of the entire laid pipeline. viii) Submission of all documents,TC, as built drawings.Any other activity which needs to be done for completion of pipeline laying works. ix) Rectification of damaged utilities on immediate basis.

-

-

-

... More
1.25 b:HDD Laying(Dia.63,Dia.90 and Dia.125)in Hard soil surface

500

-

-

... More
MDPE Pipe laying in Hard soil,using HDD Technicque- Scope of works includes- i) All the fittings in the scope of vendor ii)All types of required survey i.e.Utility survey,GPR Survey,Route Survey & any other survey as required iii) Arrangement of water iv) Excavation for entry & exit pit& acces forpalcement of HDD Machine v) Bentonite & polymer mixing & disposal of used material i.e.water,debris & other material from site. vi) HDD Machine transportation. vii) Liasioning,Laying,Testing with all joints,commissioning of the entire laid pipeline. viii) Submission of all documents,TC, as built drawings.Any other activity which needs to be done for completion of pipeline laying works. ix) Rectification of damaged utilities on immediate basis.

-

-

-

... More
2.1) Installation of GI threaded Service Pipe

-

-

-

... More
Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all GI fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.)

-

-

-

... More
"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI pipes of all sizes, Isolation and appliance valves (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover , including supply of GI fittings/accessories of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials (except Owner supplied materials),

-

-

-

... More
consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:

-

-

-

... More
Preparation and approval of schedules, execution procedures, sketches. Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. Making temporary but stable platforms/ scaffolding/ rope ladders and all other safety devices. Installation of GI Pipes & Fittings, Valves etc. including NPT threading, painting as specified (installation of meters & regulators forms a separate SOR item). Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification.

-

-

-

... More
Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.

-

-

-

... More
Handing over the completed works to MNGL for their operation/ use, returning of all free issue surplus material to MNGL stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from MNGL/ Consultant.

-

-

-

... More
Any other activity(such as drilling holes of all size & glass cutting, installation of regulator"4bar-21mbar" in the riser and two MCV in lateral for each house are included in this rate) not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule.Liasioning and Follow-up for permission with all the concerned customer, society member etc. is the scope Contractor.

-

-

-

... More
2.1 a:Laying of ½” GI pipe- All floors

48752

-

-

... More
2.1 b:Laying of ¾” GI pipe- All floors

487.52

-

-

... More
2.1 c:Laying of 1” GI pipe- All floors

487.52

-

-

... More
2.20) Installation of GI welded Pipe

-

-

-

... More
Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all forged fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.)

-

-

-

... More
"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI pipes of all sizes, Isolation and appliance valves (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including supply of forged fittings/accessories of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials (except Owner supplied materials),

-

-

-

... More
consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:

-

-

-

... More
Preparation and approval of schedules, execution procedures, sketches. Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. Making temporary but stable platforms/ scaffolding/ rope ladders and all other safety devices. Installation of GI Pipes & forged Fittings, Valves etc. including NPT threading, painting as specified (installation of meters & regulators forms a separate SOR item). Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite/glass etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification.

-

-

-

... More
Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.

-

-

-

... More
Handing over the completed works to MNGL for their operation/ use, returning of all free issue surplus material to MNGL stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from MNGL/ Consultant.

-

-

-

... More
Any other activity(like drilling holes of all size, glass cutting etc and installation of regulator "4bar-21mbar" in the riser and two MCV in lateral for each house are included in this rate) not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule.Liasioning and Follow-up for permission with all the concerned customer, society member etc. is the scope of Contractor.

-

-

-

... More
2.2 a: Laying of ½” GI pipe- All floors

10

-

-

... More
2.2 b: Laying of ¾” GI pipe- All floors

100

-

-

... More
2.2 c: Laying of 1” GI pipe- All floors

100

-

-

... More
2.2 d: Laying of 1.5" & 2" GI pipe- All floors

10

-

-

... More
2.3 a: Installation of domestic meter, regulator, GI Pipe and conversion of appliance

4000

-

-

... More
Installation of domestic meter, regulator, GI pipe Pipe and conversion of appliance: "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI pipe & supply of necessary GI fittings (like elbow, coupler, socket, reducer,tee etc) required for installation of GI piping as per Technical Specification and satisfaction of EIC. The GI fittings shall be procured from vendors who have supplied these items for similar application earlier and with prior approved of Client / Consultant.

-

-

-

... More
GI service pipe shall be installed (rate of drilling holes/glass cutting of all size are included in the rate) from the downstream of meter upto the isolation valve before the customers' appliance as per MNGL's Drawing to the satisfaction of EIC. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, threding, painting,. The work includes supply of all tools, tackles and consumables including clamps for fixing the GI pipe.

-

-

-

... More
1/2" GI pipe

-

-

-

... More
Installation of Domestic Meter: Installation & Fixing of meters with associated inlet and outlet connections/ fittings, valves approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification.

-

-

-

... More
Installation of domestic Regulator : Installation & Fixing of Domestic regulator with associated inlet and outlet connections/ fittings, purging valves approved regulator brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification.

-

-

-

... More
Conversion of all types of LPG kitchen appliances to NG based appliances. Supply & changing of nozzles/ jets/grill/oven and associated controls for domestic & imported appliances with proper tools & tackles. Supply and installation of Steel Braided Hose (Suraksha make or Equivalent with ISI mark) between Appliance Valve and the Appliance, wherever required as per the instructions of the Engineer-In-Charge.

-

-

-

... More
Cleaning and performing minor maintenance, greasing etc. of domestic appliance, testing/ showing performance to the customer ,signing of joint meter records (JMR) & uploded in system and instructing customer on use & safety norms, complete as per specifications & to satisfaction of customer/Engineer-in-charge

-

-

-

... More
2.3 b:Conversion(Testing of already installed meter GI/cu and conversion)

2000

-

-

... More
This SOR includes testing of already installed meter and conversion with rubber tube.

-

-

-

... More
Conversion of all types of LPG kitchen appliances to NG based appliances. Supply & changing of nozzles/ jets/grill/oven and associated controls for domestic & imported appliances with proper tools & tackles. Supply and installation of Steel Braided Hose (Suraksha make or Equivalent with ISI mark) between Appliance Valve and the Appliance, wherever required as per the instructions of the Engineer-In-Charge.

-

-

-

... More
Cleaning and performing minor maintenance, greasing etc. of domestic appliance, testing/ showing performance to the customer ,signing of joint meter records (JMR) & uploded in system and instructing customer on use & safety norms, complete as per specifications & to satisfaction of customer/Engineer-in-charge

-

-

-

... More
2.4) Installation of non domestic Meter

10

-

-

... More
Installation of non domestic Meter: Installation & Fixing of meters with associated inlet and outlet connections/ fittings, valves approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification.

-

-

-

... More
2.5) Installation of non domestic Regulator

10

-

-

... More
Installation of non domestic Regulator : Installation & Fixing of Service/Commercial/Domestic regulator with associated inlet and outlet connections/ fittings, purging valves approved regulator brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification.

-

-

-

... More
2.6) Testing, commissioning and painting of already laid GI pipe (Threaded and welded) Natural gas pipeline upto 2 " without supply of fitting.

-

-

-

... More
Testing & Commissioning of already laid GI pipe: Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all GI fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.)

-

-

-

... More
Jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification. Painting of fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.

-

-

-

... More
Painting of already laid GI pipe: Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.

-

-

-

... More
2.6 a: GI Pipe testing,commissioning and painting of all sizes

1000

-

-

... More
3) GI-Cu rectification work

-

-

-

... More
3.1) Dismantaling & Installation of GI service pipe with supply of all the required fittings (Forged fittings for welded work and GI threaded fittings for GI work)

-

-

-

... More
Dismantling of GI welded/threaded pipe laid by another contractor & installation of new GI welded / threaded pipe,Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all GI / forged fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.)

-

-

-

... More
"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI pipes of all sizes, Isolation and appliance valves (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including supply of GI/forged fittings/accessories of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials (except Owner supplied materials),

-

-

-

... More
consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:

-

-

-

... More
Preparation and approval of schedules, execution procedures, sketches. Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. Making temporary but stable platforms/ scaffolding/ rope ladders and all other safety devices. Installation of GI Pipes & forged/GI threaded Fittings, Valves etc. including NPT threading, painting as specified (installation of meters & regulators forms a separate SOR item). Supply & Fixing of approved clamps, electrodes for welding of Pipes, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite/glass etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification.

-

-

-

... More
Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.

-

-

-

... More
Handing over the completed works to MNGL for their operation/ use, returning of all free issue surplus material to MNGL stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from MNGL/ Consultant.

-

-

-

... More
Any other activity (like drilling holes of all size, glass cutting etc and installation of regulator "4bar-21mbar" in the riser and two MCV in lateral for each house are included in this rate) not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule.Liasioning and Follow-up for permission with all the concerned customer, society member etc. is the scope of Contractor.

-

-

-

... More
3.1: Dismantling & Installation of GI pipe uo to 2" size - All floors

1000

-

-

... More
3.2) Dismantaling & Installation, Testing and Commissioning of Copper Service Pipes and Domestic Meter, regulator without supply of fittings.

-

-

-

... More
Dismantling & Installation of Cu pipe: Dismantling of copper pipe laid by another contractor (or existing) & installation of new copper pipe,"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied Copper pipes & supply of necessary fittings (is under SOR 3.3) required for installation of copper tubing as per Technical Specification and satisfaction of EIC. The copper fittings shall be procured from vendors who have supplied these items for similar application earlier and with prior approved of Client / Consultant.

-

-

-

... More
Copper service pipe shall be installed (rate of drilling holes of all size are included in the rate) from the downstream of meter upto the isolation valve before the customers' appliance as per MNGL's Drawing to the satisfaction of EIC. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of all tools, tackles and consumables including clamps for fixing the tubes.

-

-

-

... More
12.0 mm OD x 0.6 mm wall thickness,

-

-

-

... More
3.2 a: Dismantling & Installation of Cu pipe.

10

-

-

... More
3.2 b: Dismantling & Installation of Domestic Meter: Dismantling of Domestic Meter installed by another contractor (or existing) & installation of new Domestic Meter: Installation & Fixing of meters with associated inlet and outlet connections/ fittings, valves approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification.

50

-

-

... More
3.2 c: Dismantling & Installation of Domestic Regulator: Dismantling of Domestic Regulater & installation of new Domestic Regulator : Installation & Fixing of Domestic regulator with associated inlet and outlet connections/ fittings, purging valves approved regulator brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification. supply of necessary fittings comes under SOR 3.3

50

-

-

... More
3.3) Supply & installation of fittings and other material etc.

-

-

-

... More
This SOR covers covers the supply of the fitting and its installation. Contractor has to supply the required tools, associated material and labour or what ever is required to complete the job or as instructed by EIC. This SOR will operate only for the part-3 "GI-Cu rectification work" of the SOR except SOR item No. 3.1

-

-

-

... More
3.3 a: Meter Bracket

10

-

-

... More
3.3 b:PVC sleeve up to 2" (length 12")

10

-

-

... More
3.3 c:clamping the GI pipe up to 2"

10

-

-

... More
3.43 d:clamping the Cu pipe up to 12mm

10

-

-

... More
3.3 e:Brass fitting

10

-

-

... More
3.3 f :GI threaded fitting 1/2"

10

-

-

... More
3.3 g:GI threaded fitting 3/4"

10

-

-

... More
3.3 h:GI threaded fitting 1"

10

-

-

... More
3.3 i: GI forged fitting 1/2"

10

-

-

... More
3.3 j: GI forged fitting 3/4"

10

-

-

... More
3.3 k:GI forged fitting 1",1.5" & 2"

10

-

-

... More
3.3 l:Cu fitting up to 12mm

10

-

-

... More
3.3 m:Transition fitting up to 1"

10

-

-

... More
3.4) Additional drilling of Holes of sizes 1/2" to 2"

-

-

-

... More
3.4 a: Additional drilling of Holes of sizes 1/2" to 2" as per the requirement and instructions of EIC

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.