Maharashtra Jeevan Pradhikaran Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Maharashtra Jeevan Pradhikaran - MJP Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date22 Jul 2023
Closing Date4 Aug 2023
Tender Amount₹ 3,57,54,654 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No. 3 Excavation for foundation/ pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charges, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.

126.06

87220

691.9

... More
Item No. 4 Excavation for foundation / pipe trenches in hard rock by Chizelling Wedging Line driling by mechanical means or other than Blasting lncluding trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc. complete. Lift 0 to 1.5 M

347.07

427208

1230.9

... More
Item No. 5 Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum)

3.47

22447

6469.1

... More
Item No. 6 Providing and casting in situ Cement Concrete of M-20 trap / granite / quartzite/ grieiss metal of approved quality for ReC works as per detailed drawings and designs or as directed by Engineer- in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with CM 1:3 of sufficient minimum thickness if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-2S0and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) - (Excluding M.S. orTor reinforcement)

82.32

662659

8049.8

... More
Item No. 7 Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire). ( Corrosion resistance steel Fe-500 )

0.04

3549

88749.1

... More
Item No. 8 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete

691

69929

101.2

... More
Item No. 10 Lowering laying and jointing with SBR ruber gaskets C.I. S/S pipes of various classes with CI / MS specials of following diameter in proper position, grade and alignment as directed by Engineer-in-charge including conveyance of material from stores to site of work, including cost of joint- ing materials and rubber rings labour etc. complete. Note : Only SBR Rubber gaskets to be used as per IS-5382 and IS-12820. ( MJP SSR 2023-24 P No 70; I No 2)

-

-

-

... More
300 DI K7 PIPE

12

2719

226.6

... More
Item No. 11 Hydraulic testing of C.I./D.I. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position using water supplied by the contractor.

-

-

-

... More
300 mm DI

0.01

302

25181.2

... More
Item No. 12 Pushing of M.S pipes of following dia , canal crossing by push through method in all types of strata by using hydraulic jack and drilling machine of required diameter of below M.S casing pipes, lowering laying, jointing of material welding , tripod,shain-pulley block crain, blower, compressor, loading and unloading of machinary into dewatering etc.completed as directed by engineer incharge but excluding the cost of M.S pipes FOR BABY CANAL

-

-

-

... More
300 MS PIPE

12

364557

30379.8

... More
300 MS PIPE

12

364557

30379.8

... More
Item No. 13 Manufacturing, providing and supplying spirally welded / ERW/ SAW / fabricated M. S. pipes (Commercial Quality) including procurements of plates, gas cutting to required size rolling, tack welding assembling in suitable lengths to form pipes, welding on automatic welding machine and forming ‘V’ edge on both ends of pipes including railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores, unloading, stacking, excluding GST levied by GOI & GOM in all respect etc. complete as perIS - 3589 and IS-5504 as applicable as per specifications (No negative tolerance in thickness is permissible).

-

-

-

... More
600 mm MS pipe

12

101208

8434

... More
Item No. 14 Providing and supplying ISI standard MS specials of required thickness with 3 coats of approved make epoxy paint (Shalimar, Ciba or Mahindra & Mahindra make) from inside and outside excluding all statutory duties & taxes such as GST levied by GOI & GOM in all respect, inspection charges, transportation to stores / site, and stacking, etc. complete.

250

25250

101

... More
SUB WORK NO. 2- ESTIMATE FOR GRAVITY MAIN

-

-

-

... More
Item No. 1 Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. complete. Sluice Valve- PN-1.6 (WITHOUT BY PASS)

-

-

-

... More
200 MM SLUICE VALVE'

4

89188

22297

... More
Note:-(1) Against Supply of valves - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Item No. 2 Providing and supplying Air valves as per IS-10845 and MJP’s standard specifications of approved mark and quality of following diameters including all taxes (Central and local), railway fright, inspection charges unloading from railway wagons, loading into truck, transportation upto departmental stores/ site, unloading and stacking etc. complete. (Air Valve Single Ball Flanged/Screwed Type PN-1.6)

-

-

-

... More
50 MM AIR VALVE

11

125983

11453

... More
Note:- (1) Against lowering and Laying,Jointing - 85% Payment (2) After Satisfactory Hydraulic testing - 15%

-

-

-

... More
Item No. 3 Excavation for foundation/ pipe trenches in all types of soils,Soil, Soft Murum, Hard Murum, Soft Rock, hard rock by Chizelling Wedging Line driling by mechanical means or other than Blasting lncluding trimming and levelling sand gravel including removing the excavated material upto a distance of 50 meters & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.

6185.03

4691159

758.47

... More
Item No. 4 Filling in plinth and floors murum bedding in trenches with approved murum from foundation 15 cm to 20 cm layers including watering and compaction complete.

687.23

69547

101.2

... More
Item No. 5 Lowering laying and jointing with SBR ruber gaskets DI. S/S pipes of various classes with DI / MS specials of following diameter in proper position, grade and alignment as directed by Engineer-in-charge including conveyance of material from stores to site of work, including cost of joint- ing materials and rubber rings labour etc. complete. Note : Only SBR Rubber gaskets to be used as per IS-5382 and IS-12820.

-

-

-

... More
200 MM DI K7

5390

830060

154

... More
Note:- (1) Against lowering and Laying - 90% Payment (2) After Satisfactory Hydraulic testing - 10%

-

-

-

... More
Item No. 6 Lowering laying and jointing in position following C.I.D/F Reflux valves Butterfly valves and sluice valves including cost of all labour joining material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of sluice valves)

-

-

-

... More
200 MM SLUIE VALVE

11

50336

4576

... More
Note:-(1) Against Supply of Specials - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Item No. 7 Lowering, Laying and fixing in proper alignment and position all types of C.I. Air valves as directed by Engineer in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc complete. Air Valve Single Ball ( PN-1 and PN-1.6 )

-

-

-

... More
50 MM AIR VALVE

10

3432

343.2

... More
Note:- (1) Against lowering and Laying,Jointing - 85% Payment (2) After Satisfactory Hydraulic testing - 15%

-

-

-

... More
Item No. 8 Providing and laying in situ following grades of C.C. of trap/granite/quartzite/gneiss metal for foundation and bedding including dewatering, form work, compacting and curing, finishing etc. complete.

-

-

-

... More
b) 1:2:4 (M-150) grade for encasing

9.96

64432

6469.1

... More
Item No. 9 Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, including excavation, B.B. masonry in C.M. 1:5 proportion 12 mm thick cement plaster in cm 1:4 proportion on both sides with providing and fixing C.I. manhole frame and cover in RCC 1:2:4 coping or cm thick slab etc. complete as directed by Engineer-in-charge.

-

-

-

... More
Size 0.90 x 0.60 x 1.20

4

69977

17494.4

... More
Item No. 10 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete

5107.03

516831

101.2

... More
Item No. 11 Hydraulic testing of C.I./D.I. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position using water supplied by the contractor.

-

-

-

... More
200 MM DI K7 PIPE

5.39

92468

17155.6

... More
Item No. 12 Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve over the shaft excluding cost of air valve and branch flanged air valve tee. etc. complete as per type design and as directed by Engineer-in-charge for following diameters of pipe lines (type design attached.)

-

-

-

... More
200 mm to 400 mm

11

90931

8266.5

... More
Item No. 17 Providing and supplying ISI standard D. I. specials & fitting with sealing rubber gasket of S.B.R,complete with cast iron follower gland and M. S. nut bolts coated or otherwise protected from rusting and suitable for D.I.pipes including cost of labour, materials, and transportation to stores, loading and unloading excluding GST levied by OI & GOM in all respect etc. complete as per IS-9523. For all types of specials, bends tees etc.

-

-

-

... More
80 to 300 mm Dia.

200

30600

153

... More
Note:-(1) Against Supply of Specials - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Note: 10% cost of items included in pipeline subwork excluding supply items (Pipe, All types of valves & specials) shall be retained till satisfactory hydrulic testing is given as per tender specifications.

-

-

-

... More
SUB WORK NO. 3 -Balancing Tank

-

-

-

... More
Item No.1 Excavation in all kinds of soils, including boulders upto 0.6 m dia.(0.113 cum) in wet or dry condition for Balancing tank including removing, placing the excavated material neatly in dump area or for formation stacking and spreading, and disposing off surplus excavated stuff as directed by engineer in charge, normal dewatering, prepairing and dressing the bed and side to required level and profile for foundation etc. including cost of all materials, machinery, labour, excluding backfilling etc. complete. with lead upto 1 km and all lifts as directed.

448.5

50321

112.2

... More
Item No.2 Excavation in all kinds of hard murum, including boulders upto 0.6 m dia.(0.113 cum) in wet or dry condition for Balancing tank including removing, placing the excavated material neatly in dump area or for formation stacking and spreading, and disposing off surplus excavated stuff as directed by engineer in charge, normal dewatering, prepairing and dressing the bed and side to required level and profile for foundation etc. including cost of all materials, machinery, labour, excluding backfilling etc. complete. with lead upto 1 km and all lifts as directed.

448.5

59202

132

... More
Item No.3 Excavation in all kinds of soft rock, including boulders upto 0.6 m dia.(0.113 cum) in wet or dry condition for Balancing tank including removing, placing the excavated material neatly in dump area or for formation stacking and spreading, and disposing off surplus excavated stuff as directed by engineer in charge, normal dewatering, prepairing and dressing the bed and side to required level and profile for foundation etc. including cost of all materials, machinery, labour, excluding backfilling etc. complete. with lead upto 1 km and all lifts as directed.

916

157185

171.6

... More
Item No.4 Excavation in all kinds of hard rock of all toughness by controlled blasting methods, including boulders upto 0.6 m dia.(0.113 cum) in wet or dry condition for Balancing tank including removing, placing the excavated material neatly in dump area or for formation stacking and spreading, and disposing off surplus excavated stuff as directed by engineer in charge, normal dewatering, prepairing and dressing the bed and side to required level and profile for foundation etc. including cost of all materials, machinery, labour, excluding backfilling etc. complete. with lead upto 1 km and all lifts as directed.

-

-

-

... More
0 to 1.5

1496

1285213

859.1

... More
1.5 to 3

4485

3922132

874.5

... More
3 to 4.5

4485

3991201

889.9

... More
4.5 to 6

4485

4060270

905.3

... More
Item No.5 Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A- 9/261)

4800

427200

89

... More
Item No.6 Providing and fixing in position M.S. ladder 0.5 m wide consisting of 75 x 75 mm M.S angle as stringers and 16 mm dia. M.S. bars in double rows as steps placed 25 cm c/c including cost of materials labour involved welding achoring & applying 3 coats of anticorrosive paint etc complete as directed by Engineer-in-charge

28

45984

1642.3

... More
Item No.8 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts, including consolidation, surcharging etc. complete.

897

90776

101.2

... More
SUB WORK NO. 4 - Raw Water Rising Main 160 mm HDPE 6 kg, 1210 m length

-

-

-

... More
Item No. 1 HDPE specials

-

-

-

... More
160 mm HDPE specials

-

-

-

... More
Couplers 160

12

7020

585

... More
Equal Tee 160

2

4878

2439

... More
Elbow 90 Deg 160

5

9470

1894

... More
Elbow 45 Deg 160

10

15940

1594

... More
Reducer 160X110

4

5804

1451

... More
Item No. 2 Providing, erecting, connecting double flanged short body pattern tye manually operated Butterfly Valve having body, disc and end cover in graded cast iron to IS 210 Gr. CF 200 generally conforming in BS 5155, Synthetic rubber faced ring secured on disc by retaining ring with stainless steel screw stub shaft of stainless steel riding in Teflon bearings excluding C.C. foundation/ structural steel support confirming to IS 3095-1991. Sluice Valve- PN-1 (WITHOUT BY PASS)

-

-

-

... More
100 MM SLUICE VALVE

1

8202

8202

... More
Note:-(1) Against Supply of valves - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Item No. 3 Providing and supplying Air valves as per IS-10845 and MJP’s standard specifications of approved mark and quality of following diameters including all taxes (Central and local), railway fright, inspection charges unloading from railway wagons, loading into truck, transportation upto departmental stores/ site, unloading and stacking etc. complete. CI ARV FLFF PN 1.6 50 MM DIA. High Performance Air Valve

-

-

-

... More
50 MM AIR VALVE

2

22906

11453

... More
Note:-(1) Against Supply of valves - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Item No. 4 Excavation for foundation/ pipe trenches in all types of soils,Soil, Soft Murum, Hard Murum, Soft Rock, hard rock by Chizelling Wedging Line driling by mechanical means or other than Blasting lncluding trimming and levelling sand gravel including removing the excavated material upto a distance of 50 meters & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.

1089

863282

792.73

... More
Item No. 5 Filling in plinth and floors murum bedding in trenches with approved murum from foundation 15 cm to 20 cm layers including watering and compaction complete.

136.13

13775

101.2

... More
Item No. 6 Lowering, Laying and Jointing H. D. P. E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II

-

-

-

... More
160 MM HDPE 6 KG PIPE

1210

173030

143

... More
Note:- (1) Against lowering and Laying - 90% Payment (2) After Satisfactory Hydraulic testing - 10%

-

-

-

... More
Item No. 7 Lowering laying and jointing in position following C.I.D/F Reflux valves Butterfly valves and sluice valves including cost of all labour joining material, including not bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of sluice valves)

-

-

-

... More
160 MM HDPE 6 KG PIPE

1

2799

2799.5

... More
Note:- (1) Against lowering and Laying,Jointing - 85% Payment (2) After Satisfactory Hydraulic testing - 15%

-

-

-

... More
Item No. 8 Lowering, Laying and fixing in proper alignment and position all types of C.I. Air valves as directed by Engineer in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc complete.

-

-

-

... More
50 MM AIR VALVE

2

941

470.8

... More
Note:- (1) Against lowering and Laying,Jointing - 85% Payment (2) After Satisfactory Hydraulic testing - 15%

-

-

-

... More
Item No. 9 Providing and laying in situ following grades of C.C. of trap/granite/quartzite/gneiss metal for foundation and bedding including dewatering, form work, compacting and curing, finishing etc. complete.

-

-

-

... More
b) 1:2:4 (M-150) grade for encasing

4.68

30275

6469.1

... More
Item No. 10 Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, including excavation, B.B. masonry in C.M. 1:5 proportion 12 mm thick cement plaster in cm 1:4 proportion on both sides with providing and fixing C.I. manhole frame and cover in RCC 1:2:4 coping or cm thick slab etc. complete as directed by Engineer-in-charge.

-

-

-

... More
Size 0.90 x 0.60 x 1.20

1

17494

17494.4

... More
Item No. 11 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete

933.57

94477

101.2

... More
Item No. 12 Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position.

-

-

-

... More
160 MM HDPE 6 KG

1.21

18488

15280.1

... More
Item No. 13 Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum)

-

-

-

... More
In PCC M-150

136.13

880606

6469.1

... More
Item No. 14 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means -Grading I (Using Screening Type B (11.2 mm) Aggregate)

907.5

2176185

2398

... More
Item No. 15 Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. -- a) 19 mm nominal chippling size (bitumen 12.00 kg/10 Sq.M.) -- Bitumen of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates)

907.5

97828

107.8

... More
SUB WORK NO. 5 - Pure Water Rising Main 110 mm HDPE 6 kg, 700 m length

-

-

-

... More
Item No. 1 HDPE specials

-

-

-

... More
110 mm HDPE Specials

-

-

-

... More
Couplers 110

10

2930

293

... More
Equal Tee 110

5

4260

852

... More
Elbow 90 Deg 110

5

9470

1894

... More
Elbow 45 Deg 110

5

3395

679

... More
Reducer Tee 110 X 110 X 75

3

2214

738

... More
Note:-(1) Against Supply of Specials - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Item No. 2 Providing, erecting, connecting double flanged short body pattern tye manually operated Butterfly Valve having body, disc and end cover in graded cast iron to IS 210 Gr. CF 200 generally conforming in BS 5155, Synthetic rubber faced ring secured on disc by retaining ring with stainless steel screw stub shaft of stainless steel riding in Teflon bearings excluding C.C. foundation/ structural steel support confirming to IS 3095-1991. Sluice Valve- PN-1 (WITHOUT BY PASS)

-

-

-

... More
100 MM SLUICE VALVE

1

8202

8202

... More
Note:-(1) Against Supply of valves - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Item No. 3 Providing and supplying Air valves as per IS-10845 and MJP’s standard specifications of approved mark and quality of following diameters including all taxes (Central and local), railway fright, inspection charges unloading from railway wagons, loading into truck, transportation upto departmental stores/ site, unloading and stacking etc. complete. CI ARV FLFF PN 1.6 50 MM DIA. High Performance Air Valve

-

-

-

... More
50 MM AIR VALVE

1

11453

11453

... More
Note:-(1) Against Supply of valves - 80% Payment (2) Against lowering and Laying - 10% Payment (3) After Satisfactory Hydraulic testing - 10% Payment

-

-

-

... More
Item No. 4 Excavation for foundation/ pipe trenches in all types of soils,Soil, Soft Murum, Hard Murum, Soft Rock, hard rock by Chizelling Wedging Line driling by mechanical means or other than Blasting lncluding trimming and levelling sand gravel including removing the excavated material upto a distance of 50 meters & lifts as below, stacking & spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.

630

499419

792.73

... More
Item No. 5 Filling in plinth and floors murum bedding in trenches with approved murum from foundation 15 cm to 20 cm layers including watering and compaction complete.

78.75

7969

101.2

... More
Item No. 6 Lowering, Laying and Jointing H. D. P. E./ M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II

-

-

-

... More
110 MM HDPE 6 KG

700

60060

85.8

... More
Note:- (1) Against lowering and Laying - 90% Payment (2) After Satisfactory Hydraulic testing - 10%

-

-

-

... More
Item No. 7 Lowering laying and jointing in position following C.I.D/F Reflux valves Butterfly valves and sluice valves including cost of all labour joining material, including not bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of sluice valves)

-

-

-

... More
100 MM SLUICE VALVE

1

2799

2799.5

... More
Note:- (1) Against lowering and Laying,Jointing - 85% Payment (2) After Satisfactory Hydraulic testing - 15%

-

-

-

... More
Item No. 8 Lowering, Laying and fixing in proper alignment and position all types of C.I. Air valves as directed by Engineer in-charge including cost of conveyance from stores to site of work, cost of all material and giving satisfactory hydraulic testing, etc complete.

-

-

-

... More
50 MM AIR VALVE

1

470

470.8

... More
Note:- (1) Against lowering and Laying,Jointing - 85% Payment (2) After Satisfactory Hydraulic testing - 15%

-

-

-

... More
Item No. 9 Providing and laying in situ following grades of C.C. of trap/granite/quartzite/gneiss metal for foundation and bedding including dewatering, form work, compacting and curing, finishing etc. complete.

-

-

-

... More
b) 1:2:4 (M-150) grade for encasing

4.68

30275

6469.1

... More
Item No. 10 Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, including excavation, B.B. masonry in C.M. 1:5 proportion 12 mm thick cement plaster in cm 1:4 proportion on both sides with providing and fixing C.I. manhole frame and cover in RCC 1:2:4 coping or cm thick slab etc. complete as directed by Engineer-in-charge.

-

-

-

... More
Size 0.90 x 0.60 x 1.20

1

17494

17494.4

... More
Item No. 11 Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete

538.11

54456

101.2

... More
Item No. 12 Hydraulic testing of H. D. P. E./ M. D. P. E. pipe line to specified pressure including cost of all materials and labour and water for testing for specified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessary and reinstating to original position.

-

-

-

... More
110 HDPE 6 KG

0.7

6417

9168.5

... More
Item No. 13 Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum)

-

-

-

... More
In PCC M-150

78.75

509441

6469.1

... More
Item No. 14 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means -Grading I (Using Screening Type B (11.2 mm) Aggregate)

525

1258950

2398

... More
Item No. 15 Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. -- a) 19 mm nominal chippling size (bitumen 12.00 kg/10 Sq.M.) -- Bitumen of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates)

525

56595

107.8

... More
SUB WORK NO. 6 - National Highway Crossing

-

-

-

... More
Item No. 1 :- Excavation for foundation / pipe trenches in earth , soils of all types , sand , gravel and soft murum , including removing the excavated material upto a distance of 50 meters and lifts as below , stacking and spreading as directed , manual , dewatering , preparing the bed for foundation and excluding backfilling etc. complete.

-

-

-

... More
i) Lift 0 to 1.50 m

20

3630

181.5

... More
Item No. 2 :- Excavation for foundation / pipe renches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd- A-2/259)

-

-

-

... More
i) Lift 0 to 1.50 m

40

8228

205.7

... More
ii) Lift 1.50 to 3.0 m

60

13332

222.2

... More
iii) Lift 3.00 to 4.5 m

60

14322

238.7

... More
Item No 3:Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, emoving the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259

60

73854

1230.9

... More
Item No. 4 :-Providing and laying in situ following grades of plain concrete ot trap / granite / quartzite / gneiss metal for foundation and bedding including normal dewatering , form work , compaction and curing etc. complete.

6

38814

6469.1

... More
Item No.5 :- Manufacturing, providing and supplying spirally welded / ERW/ SAW / fabricated M. S. pipes (Commercial Quality) including procurements of plates, gas cutting to required size rolling, tack welding assembling in suitable lengths to form pipes, welding on automatic welding machine and forming ‘V’ edge on both ends of pipes including railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores, unloading, stacking, excluding GST levied by GOI & GOM in all respect etc. complete as perIS - 3589 and IS-5504 as applicable as per specifications (No negative tolerance in thickness is permissible).

-

-

-

... More
Total of 600mm dia M.S pipe (10mm thk)

40

566000

14150

... More
Item No. 6 :- Pushing of M.S. pipe of following Dia. for road crossing and Railway Crossing by push through method in all types of strata by using hydraulic jack and drilling machine of required diameter below M.S. Casing pipe lowering, laying, jointing of material, required welding machinery, tripod, chain pulley block, crane blower compressor, loading & unloading of machinery in the trench etc. transportation and dewatering etc. complete as directed by the Engineer-in-charge but excluding cost of M.S. pipes.

40

1518968

37974.2

... More
Item No 7: Providing structural steel work in single stanchions composed of RSJ, channel, etc. with caps, bases, mild steel plates, angles, brackets, cleats, gusset plates, anchor bolts, etc. as per detailed design and drawing or as directed by Engineerincharge including cutting, fabrication, hoisting, erecting, fixing in position, making riveted / bolted / welded connections and one coat of anticorrosive paint and over it two coats of oil painting,etc complete.

0.15

13863

92422

... More
Item No. 8 :-Providing and supplying IST standard MS specials o required thickness with 3 coats of approved make epoxy paint (Shalimar, Ciba or Mahindra & Mahindra ke) from inside and outside excluding GST levied by GO! & ' GOM in all respect including inspection charges, trans- portation to stores and stacking, etc. complete. Plain ended specials or Plain ended branch flanged specials of all diameter

152.73

15456

101.2

... More
Item No. 9 :- Gas cutting (either square cut or V cut) pipes, plates etc. of thickness.

-

-

-

... More
5 mm to 10 mm

175

28682

163.9

... More
Item No. 10 :- Welding in all positions with required number of runs, for M.S. pipes internally and / or externally including gauging wherever necessary fixing appurtenances and other accessoceries in connection with pipe laying work as per specifications.

-

-

-

... More
I) Butt Joint Plate 8 mm thick

27

34273

1269.4

... More
II) Butt Joint Plate 10 mm thick

32

49772

1555.4

... More
Item No 11: Providing and applying pipe coating of fibres, coal tar and solvent based rubber modified bituminous primer of density 0.92 gms/cu cm and viscosity of 1000-2000 cps @ 150 gms/sqm followed by seven layers(4mm thick) of polythene polymerised bitumen and polyester of local 7 layers) pipe coat 4 mm should conform to requirement of IS-10221 and AWWA C- 203 for prefabricated tapes including covering cost on pipe coating. Rates shall include cost of material coating and wrapping over the pipes, handling charges, preparation of pipe surface, all labour, material, etc. complete

52.28

45661

873.4

... More
Item No.12 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm. layers with all leads and lifts including consolidation, surcharging, etc. complete.

180

18216

101.2

... More
Item No.13 :- Hydraulic testing of M.S. Pipeline to specified pressure including cost of all matrrials and labour and water for testing for the length upto 1 km., using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc required for testing. The rate under this item shall also include cost of retesting, if necessary.

-

-

-

... More
Upto 600mm dia

0.06

4431

73862.8

... More
SUB WORK NO. 7 - Railway Crossing

-

-

-

... More
Item No. 1 :- Excavation for foundation / pipe trenches in earth , soils of all types , sand , gravel and soft murum , including removing the excavated material upto a distance of 50 meters and lifts as below , stacking and spreading as directed , manual , dewatering , preparing the bed for foundation and excluding backfilling etc. complete.

-

-

-

... More
i) Lift 0 to 1.50 m

20

3630

181.5

... More
Item No. 2 :- Excavation for foundation / pipe trenches in hard murum & boulders, W.B.M. road including removing the excavated material upto a distance of 50 meters and lifts as below , stacking and spreading as directed by Engineer-in-charge, normal dewatering , preparing the bed for foundation and excluding backfilling etc. complete.

-

-

-

... More
i) Lift 0 to 1.50 m

40

8228

205.7

... More
ii) Lift 1.50 to 3.0 m

60

13332

222.2

... More
iii) Lift 3.00 to 4.5 m

60

14322

238.7

... More
Item No 3:Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, emoving the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259

60

73854

1230.9

... More
Item No. 4 :-Providing and laying in situ following grades of plain concrete ot trap / granite / quartzite / gneiss metal for foundation and bedding including normal dewatering , form work , compaction and curing etc. complete.

6

38814

6469.1

... More
Item No.5 :- Manufacturing Providng and supplying spirally welded, ERW, SAW fabricated M.S. Pipe (commercial quality) including procurement of plates, gas cutting to required size, rolling tack welding assembling in suitable lengths to form pipes, welding on automatic welding machine and forming ‘V’ edges on both ends of pipes, providing and applying epoxy paint of Shalimar or ciba make as per specifications including all taxes (Central & Local) railway freight, insurance, unloading from railway wagon, loading in to truck, transportation to store/site unloading, stacking etc. complete as per specification.

-

-

-

... More
14) 600mm dia. / 10mm thik

100

1415000

14150

... More
Item No. 6 :- Pushing of M.S. pipe of following Dia. for road crossing and Railway Crossing by push through method in all types of strata by using hydraulic jack and drilling machine of required diameter below M.S. Casing pipe lowering, laying, jointing of material, required welding machinery, tripod, chain pulley block, crane blower compressor, loading & unloading of machinery in the trench etc. transportation and dewatering etc. complete as directed by the Engineer-in-charge but excluding cost of M.S. pipes.

35

1329097

37974.2

... More
Item no 7:-Providing structural steel work in single stanchions composed of RSJ, channel,etc. with caps, bases, mild steel plates,angles, brackets, cleats, gusset plates,anchorbolts, etc. as per detailed designand drawing or as directed by Engineerinchargeincluding cutting, fabrication,hoisting, erecting, fixing in position,makingriveted / bolted / weldedconnections and one coat of anticorrosivepaint and over it two coats of oil painting etc complete

0.47

43715

92422

... More
Item No. 8 :- Providing & supplying ISI standard MS specials of required thickness with 3 coats of approved make epoxy paint (Shalimar, Ciba or Mahindra & Mahindra make) from inside & outside including all taxes (Central & local), octroi, inspection charges, transportation to stores/ site, & stacking etc complete.

152.73

15456

101.2

... More
Item No. 9 : - Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOI & GOM in all respect etc. WIthout By Pass

-

-

-

... More
iii) 200 mm dia PN 1.0

2

44594

22297

... More
Item No.10 :- Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.)

-

-

-

... More
iii) 200 mm dia PN 1.0

2

8320

4160

... More
Item No.11 :- Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in C.M. 1:5 Proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.

-

-

-

... More
i) As above of 1.20 x 1.20 m internal size and depth upto 1.2 m with precast RCC slab cover.

2

40121

20060.7

... More
Item No 12: Providing and applying pipe coating of fibres, coal tar and solvent based rubber modified bituminous primer of density 0.92 gms/cu cm and viscosity of 1000-2000 cps @ 150 gms/sqm followed by seven layers(4mm thick) of polythene polymerised bitumen and polyester of local 7 layers) pipe coat 4 mm should conform to requirement of IS-10221 and AWWA C- 203 for prefabricated tapes including covering cost on pipe coating. Rates shall include cost of material coating and wrapping over the pipes, handling charges, preparation of pipe surface, all labour, material, etc. complete

133.35

116467

873.4

... More
Item No.13 :- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm. layers with all leads and lifts including consolidation, surcharging, etc. complete.

209.6

21211

101.2

... More
SUB WORK NO. 13 - Trial Run

-

-

-

... More
Item No.1 : Commissioning, running and maintaining the scheme to quantities, rated capacity, including manning necessary personnel such as operator, valveman, etc. as per requirements of the scheme and who should also administer chemical dose for a period of 1 month for individual scheme and for regional scheme, together with training of personnel spared by MJP / Local Body and handing over the scheme to Local Body after completion of the above period as directed by Engineer-in-charge.

-

-

-

... More
For single village with WTP

3

116028

38676

... More
Note: 10% cost of items included in pipeline subwork excluding supply items (Pipe, All types of valves & specials) shall be retained till satisfactory hydrulic testing is given as per tender specifications.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.