Konkan Railway Corporation Limited Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Konkan Railway Corporation Limited - KRCL Tender

Works
Agriculture or Forestry Works
Ireps
Opening Date19 Dec 2024
Closing Date9 Jan 2025
Tender Amount₹ 1,89,74,502.87 
Notes
Download

Costs

Summary

Earthwork In Cutting For Flattening Of Slopes, Provision Of Berms, Construction Of side Drains, Catch Water Drains And Protective Works At Ashti Cutting In Khed- anjani Section At Km. 107/800 To 108/300 In Ratnagiri Region Over Konkan railway Route In Maharashtra State.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
012010 - Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, 3 unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii) Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. - 012013 - In hard rock requiring blasting.

31500

359

10092261

... More
012010 - Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental 4 thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii) Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract. - 012014 - In hard rock with hammer / chisel / pavement breaker etc. where blasting is not permitted due to special circumstances and if specifically ordered in writing including drilling and all incidental works thereto.

1000

952

849505.29

... More
014080 - Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) 1 including disposal of the debris, soil, muck etc. as directed by the engineer. Note - Rates are for disposal at the end of cutting. Disposal of debris/soil/muck beyond end of cutting to be paid for under relevant lead item. - 014081 - Lead within cutting is up to 50m.

80

133

13726.36

... More
014080 - Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) 2 including disposal of the debris, soil, muck etc. as directed by the engineer. Note - Rates are for disposal at the end of cutting. Disposal of debris/soil/muck beyond end of cutting to be paid for under relevant lead item. - 014082 - Lead within cutting is over 50m and up to 200m - for every 50m or part thereof.

320

39

16237.9

... More
014080 - Cleaning side drains in cuttings by the side of track (Kutcha or Pucca) 3 including disposal of the debris, soil, muck etc. as directed by the engineer. Note - Rates are for disposal at the end of cutting. Disposal of debris/soil/muck beyond end of cutting to be paid for under relevant lead item. - 014083 - Lead within cutting exceeds 200m - for every 100m or part thereof. 185010 10.00 MT 1344.32 13443.20 28.14 17226.12 4

320

39

16237.9

... More
185010 - Dismantling of existing rail fencing, fixed adjoining running lines of track, duly excavating and levelling the foundation by hand compaction, removing connections and carting the released material up to a lead of 250m by suitable means and stacking the same, as directed by engineer in-charge. Note: The released materials shall be handed over duly stacking the same in measurable fashion.

-

-

4

... More
022010 - Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved 1 material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. - 022011 - All kinds of soils.

40

199

7130.55

... More
022010 - Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved 2 material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. - 022014 - Hard rock (blasting prohibited).

40

636

22700.11

... More
022030 - Providing and laying in position Plain cement concrete of specified Nominal 3 Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centring and shuttering - All work up to plinth level:- 022031 - 1:11⁄2:3 (1 Cement: 11⁄2 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).

390

2586

899955.04

... More
022030 - Providing and laying in position Plain cement concrete of specified Nominal 4 Mix for miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centring and shuttering - All work up to plinth level:- 022032 - 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).

60

2667

142796.55

... More
025030 - Centring and shuttering including strutting, propping etc. and removal of 5 form for: - 025031 - All types of bridge sub-structures, e.g. pier, abutment, wing wall retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm w329all etc. upto 5m above ground level. 6

3300

329

968770.11

... More
025051 - Extra for drilling 32mm dia. holes for jacketing / anchoring.

300

79

21184.99

... More
025052 - Extra for inserting of dowel bars of specified dia. (cost of rods to be paid extra).

1220

9

10134.92

... More
025070 -Supplying and using Cement at Work site: - 025071 - Ordinary Portland Cement 43 grade of approved brands/makes.

178

7978

1267296.61

... More
025080 - Steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. - 025082 - Thermo- Mechanically Treated bars of grade Fe-500D or more of approved brands/makes.

-

-

1

... More
NS-1 - Providing weep holes by making suitable opening or drilling in existing Brick Masonry /Plain / Reinforced Concrete abutment, wing wall/return wall with PVC pipe, extending through the full width of the structure. - 50mm dia. PVC Pipe.

175

80

17480.17

... More
NS-1 - Removing of MSBN/HSBN from cutting slope including fasteners and staking them properly at indicated locations as directed by Engineer-in-Charge with all leads and lifts as directed by Engineer-in-Charge.

10950

9

204502.75

... More
NS-1 : RCC precast size 0.15m x 0.15m x 2m of 1:2:4 concrete for anchoring the rope net with contractor's cement, steel and water with all contractors materials, manpower, tools/ 1 equipments/ machines, including transportation to site, loading/unloading/ stacking with all lead and lift, curing, testing of concrete as per relevant IS code etc. complete including casting, placing inside the trench anchoring with rope net etc., as directed by Engineer-in-charge and as per approved scheme.

5

7462

98326.77

... More
NS-2 : 1:3:6 concreting for embedding the concrete precast slab inside the trench with 2 all contractor's cement, water, contractor's materials, manpower, tools / equipments with transportation, loading / unloading / storing of all materials, curing, etc. with all lead and lift and as directed by Engineer-in-charge and as per approved scheme.

66

3215

559205.53

... More
NS-3 : Shifting of boulder net from site store to work spot & spreading the same on the 3 cutting slopes with all safety precautions, shifting with all lead from one side of the cutting to the other side etc. with all lead and lift, contractor's materials, tools/equipments, scaffolding, manpower complete as per the approved scheme and as directed by Engineer-in-charge.

7850

9

186191.01

... More
NS-4 : Fabrication and fixing of 'U' pin of 10mm dia. tor rod on the top of the cutting for top anchoring with all contractor's materials, transporting, supply all lead and lift, contractor's manpower, tools & plants /equipments, complete and as directed by Engineer-in-charge.

0.1

-

9223.9

... More
NS-5 : Bottom anchoring upto 1m depth by using 16mm dia. HYSD steel bolts threaded 5 upto 200m on top and fixing the same with available MS plate of size 200mm x 200mm x 6mm epoxy coated washer plate and suitable nut with all contractor's labours, materials, rock capsules, men, all lead and lift, tools and plants, equipments, scaffolding as directed by Engineer-in-charge.

160

211

88971.1

... More
NS-6 : Joining of adjacent nets with spiral spring (KRCL issue the spiral spring) at site, 6 fixing at the ratio of 1 no. per 0.6m in the longitudinal direction of the net portion etc. complete, transportation with all lead and lift, materials, manpower, tools / equipments etc. as directed by Engineer-in-charge.

1600

4

16866.56

... More
NS-7 : Refixing of KRCL available MS plates of 8mm thick at site to the net spread on the cutting slope with contractor's own labour, tools, equipment, including shifting from site with all leads and lift.

1000

10

26354

... More
NS-8 : Top anchoring with 25mm tor rod of 1.5m length grouted with cement capsules with contractor's own steel & cement capsules including drilling of holes, manpower, materials, tools & plants, transportation of materials to work site with all leads & lifts etc. complete as directed by Engineer-in-charge.

4.5

44500

527738.85

... More
NS-9 : Supplying and fixing of Anchor bolts / fasteners 12/20mm dia. including drilling of holes with contractor's own drilling machine with all lead lift etc. as directed by Engineer-in-charge.

1000

65

171301

... More
NS-10 : Drilling of 10mm./ 12mm dia. hole up to a depth of 150mm in rock and fixing 10 fasteners & epoxy coated washer plate of size 200mm x 200mm x 6mm available at site for fixing of rope net including drilling of hole with all contractor's material, tools, plants etc. complete with all leads and lifts as directed by engineer-in-charge.

110

12

3478.73

... More
NS-1 : Filling of excavated trenches in 15cm layers after spreading of boulder net with 1 watering and compaction up to the full satisfaction of Engineer-in-charge with all contractor's men, materials, tools and plants, leads and lifts etc., complete. (Boulder available nearby may also be used as per instructions).

120

25

7273.5

... More
NS-2 : Transportation of galvanized mild steel net and fasteners from site to the work site including spreading the net over the rock slope with all contractor's machinery, labour, tools and plants including all leads and lifts etc. complete.

5550

2

33639.94

... More
NS-3 : Providing rock anchor bolts made of 25mm tor steel rod of 1.2m long which is 3 threaded upto 200mm on the top and fixing the same in 1m long 32mm dia. hole drilled in hard rock with 200 x 200 x 6mm epoxy coated plate and suitable nut and grouting the hole with cement grout with a maximum water cement ratio of 0.45 with all contractor's men, materials, tools and plants, leads and lifts etc. complete. (The rate includes the cost of steel rod, washer, plate, nut, cement).

1.15

44500

124073.79

... More
NS-4 : Supply, fabricating and fixing of "U" pins of 16mm dia. steel on the top of trenches and side of cutting in natural soil by hammering or by any other means after stretching of net as per instructions of Engineer-in-charge with contractor's men and machinery etc. complete.

0.3

-

25457.25

... More
NS-5 : Refixing of MS plates available at site to the net with contractor's own labours, tools, equipment etc. with all leads and lift.

80

10

1939.6

... More
NS-6 : Drilling of 10 mm & 12 mm dia. holes upto a depth of 150 mm in rock and fixing 6 fasteners, nuts and epoxy coated washer plates of size 200mm x 200 mm x 6 mm available at site for fixing of rope net including drilling of holes with all contractor's materials, tools, plants etc. complete with all leads and lift and as directed by Engineer-in-Charge.

975

12

28366.65

... More
NS-7 : M15 concreting above/below ground level with 40mm & down size hard stone 7 aggregate in foundation and walls etc. with all contractor's cement, men, materials, tools & plants including shuttering, compacting, removal of shutter, finishing the surface smooth, curing etc. complete.

5

2268

27493.83

... More
NS-8 : Supplying & fixing of 12 mm diameter wire rope of approved quality for bottom anchoring with contractor's labours, tools, materials etc. with all leads & lifts and as directed by Engineer-in-Charge. NS 50.00 RunningMetre 12.00 600.00 142.45 1454.70

275

65

43337.94

... More
NS-9 : Fixing of available wire rope at site for bottom anchoring with contractor's own labours, tools, materials, etc. with all leads, and lift and as directed by Engineer-in- charge.

-

-

9

... More
NS-10 : Supplying and fabrication of 16 mm. diameter tor rod of length 0.70M duly 10 making round hook at outer end and passing of steel wire rope through hook with contractor's own steel, including cutting, bending and sharpening at the end, including driving of hook in soil for fixing of net with all contractor's men, materials, tools and plants with all leads and lift.

100

33

8000.85

... More
NS-11 : Cutting of steel boulder net having longer in length for making as per requirement at site with all contractors' labours, tools, plants, equipment etc. with all leads and lift and stacking them away from track.

60

34

4945.98

... More
NS-12 : Lacing of medium strength boulder net with KRCL lacing wire including bringing the MSBN net to the required position by stretching them, pressing of steel boulder net by using wooden hammer as per requirement at site at various stages with all contractor's labours tools, plants, equipment, with all leads and lift and as directed by Engineer-in-Charge.

1326

17

54653.08

... More
NS-13 : Folding of extra steel boulder net after spreading over cutting slope and fixing with wire rope including stitching the joint portion and locking with lacing wire with all contractor's labour, tools and plants with all leads and lift as directed by Engineer-in- Charge.

71

18

3098.51

... More
NS-14 : Supplying and fixing of FB 12/20 bolts including drilling of hole with contractor's own drilling machine 12 mm dia. Hole with all leads and lifts as directed by Engineer-in- charge.

975

65

153652.69

... More
15.9 - Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:- 15.9.2 - In cement mortar.

100

2027

208973.74

... More
15.2 - Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer - in - charge. - 15.2.1 - Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).

10

2007

20691.19

... More
NS-1 : Boulder dropping from hill top, slope and in cutting during Traffic and power 1 block with all contractor's labour skilled man, machinery, equipments, accessory, safety device with all lead and lift and as directed by Engineer at site. (Note-1: Quantity will be assessed by stack measurement and 8% voids will be deducted for payment purpose. Note-2: This item will be operated at location where Schedule-B is not operated.)

100

1617

214462.71



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.