Indira Gandhi Centre For Atomic Research Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Indira Gandhi Centre For Atomic Research - IGCAR Tender
Civil And Construction
Building Construction
Eprocure
Opening Date4 Jul 2024
Closing Date12 Jul 2024
Tender Amount₹ 46,94,939
Costs
EMD
₹ 93,899Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IGCAR_814724_1Bid Award Id
ViewTender No
IGC/SQ RMG/TC QMD/14501/2024Tender Authority
Indira Gandhi Centre For Atomic Research ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Structural repair:Identified structural damages are to be repaired for with procedure in Annexure.
5
-
-
... More
Vinyl removal from wall: Removal of vinyl mat and beading from walls; Vinyl mat fixed on walls of rooms and corridor with wooden beading is to be removed
75
-
-
... More
Modification of Concealed electrical box: Modification of concealed box for switches:Concealed boxes behind electrical switch boards (8”x8”) are to be replaced with smaller (8”x4”) sized boxes. Fixing of these electrical boxes with plaster is in the scope of work under part A -Civil works of this specification. Procurement of Electrical switch boxes is included in part B -Electrical works of this specification
13
-
-
... More
Masonry, plastering, surface preparation and painting of walls & ceilings: Providing and closing of five nos. of wall openings of total area 2.3 sqm and 100 mm depth (currently closed with plywood)and plastering with cement coarse sand mortar of pre-approved 1:4/1:6 ratios. Wall is 5 inch thick. Rate shall include cost for re-enforcement structure.
Provision and application of one coat POP punning / wall finishes / wall dado. Rate shall include for scaffolding, grooves, sills, pattas, and curing, surface preparation before the application of plaster. Thoroughly sand papering surfaces to remove dust, dirt etc. and repairing dents, cracks, holes with POP to achieve level surface, followed by finishing with two coats of primer, putty and three coats of acrylic emulsion paint as directed by the Engineer-In-Charge (EIC). Cost should be inclusive of material, labor, scaffolding etc. Cost to also include application at all heights and levels, surfaces and textures
675
-
-
... More
FLOORING AND SKIRTING
-
-
-
... More
Floor Preparation: Removal of existing PVC Mat from floor and skirt, Conditioning of floor for Laying down vitrified Tiles.
210
-
-
... More
Floor Tiling: Providing and laying on floor with double charged Vitrified tiles over existing floor- of 10 mm (min.) thick of size 2' x 2' (min.) of approved shade and sample with resin/synthetic grouting (with pigmented additives matching the shade of tile) in pattern approved by EIC, with 5/3 mm thick PVC spacers incorporating neat cement float, maintaining required slopes, inclusive of surface preparation, cleaning, protecting the floor with POP or bubble sheet etc. complete. Note: For floor tiles, all edges to be sorted for straight edges before lying. The tile will be laid after approval from the EIC at site. Rates shall include the modification of existing doors for level change due to tiling.
210
-
-
... More
Skirting: Providing and cladding in proper line and level, 100 mm high skirting in Vitrified tile with 5 mm thick PVC spacers on neat cement slurry paste, grouting joints with neat cement paste with pigmented additives, cleaning, skirting to be fixed flush with finished surface of wall in line and level and 6mm wide groove to be made in wall at the junction of tile and finished surface of wall.
210
-
-
... More
FALSE CEILING
-
-
-
... More
Removal: Removal of existing false ceiling by removing all its supporting frames and accessories.
45
-
-
... More
Installation of new False Ceiling:Providing and Fixing Micro Perforated/non perforated powder coated Aluminium panels suspended from the ceiling. Panels shall be of Size 2' X 2' made out of standard powder coated Aluminium. Tiles shall have perforations of 1.5 mm diameter in 5mm diagonal square patterns giving 22 % of perforated area. Non-woven acoustic pad pasted on the back side with appropriate adhesive.The tile end shall be raised upward by 10 mm and bend outward to lay the tile in frame work. Grid system for fixing ceiling tiles shall comprise of T-grid suspension system. The 15mm / Silhouette / Equivalent main Tee runner shall be suspended at an interval of 4' centre to centre. The 4' cross tee shall be attached between two main runners at every 600 mm and further 600mm cross Tee shall be interconnected between two 4' cross Tees. Thus a grid system of 2' X 2' is formed. The main tee shall be suspended by means of 2/2.5 mm wire or 4mm G.I rod from slab/roof. The suspension shall be provided at 4'centre to centre and not more 2'6"from the wall. However, the suspension shall not be more than 150mm distance from the spliced joints of the main tee
45
-
-
... More
PARTITIONING
-
-
-
... More
Providing and constructing Full height laminate finish partition. Mode of measurement to be Running length of the Partition of any one side into the height Up to True ceiling with door deductions. Specification:Partition framing: Providing and fixing Aluminium Frame work using box sections 50mm X 37.5mm @ 610mm c/c to be fixed by means of floor and ceiling channel, with intermediate horizontal 50mm X 37.5mm Aluminium sections @ 1200mm C/C complete as directed at site. The Aluminium framework to be continued right up to the True ceiling. The cost to also include necessary strengthening of Aluminium frames to take the additional load of ply paneling on either side. Filling: Providing and filling glass wool insulation of density not less than 48 kg per cum, of approved make wrapped in 40GSM fiber glass tissues as per manufacturer's specifications, with an installed thickness of not less than 50mm thick wherever directed by the EIC, including the cost of all labor, material and equipment, transporting, lifting to all heights, etc. Plywood fixing on frame: Aluminium framework backing to be covered with 12mm thick marine ply (confirming to IS 303 & of reputed make) backing & fixed with wooden screw or as directed. 12mm thick marine ply should be screwed to frame work on main side with joints as directed by EIC. For approximately3 Sq mtr area on main side of partition, double backing of 12 mm thick Marine ply shall be provided. Partition should be able to bear additional load on itself for hanging display units/white boards/ photo frames. Finish: Approved laminate shall be of 1.0 mm thick. laminate shall be fixed on plywood skins with glue having grooves as directed by EIC. Ply on one side of the main frame to be finished with 1.0mm thk approved laminate finish as per approved shade suitable for office interior finish and the other side of the main frame to be painted with Acrylic Emulsion paint after surface preparation
41
-
-
... More
DOORS & THEIR FRAMES:Door Size: 6’8”x3’ Door Frames are of two types: Size (1) Large size-12'x5'- Two numbers (2) Small size-9'1'x5'- Nine numbers
-
-
-
... More
Maintenance Scope: All doors, and their frames as described in 6.0 shall be maintained as follows: Maintenance: During maintenance doors to be taken out of their frames, the hinges removed, and four new hinges to be installed in each door: two at the top, closely spaced, and two more in the middle and bottom. Door hinges should be made of stainless steel with a thickness of 3.5 mm. After maintenance, doors should be fixed appropriately. Painting of doors & frames: During door & frame maintenance, old paint must be cleaned, and then the surface must cure before being painted
13
-
-
... More
Curing, Scrubbing, Repairing & Painting of door frames: Glass fixed door frames are to be cured and painted Replacement of broken glass panels.03 Nos. of broken glass panels of door frames have to be replaced. Area of broken glass panels to be replaced is approximately 2’3” × 3’ and thickness of glass is approximately 4 mm. Glass to be fixed with teak wood beading. All glass surfaces to be cleaned after maintenance
11
-
-
... More
SS Door locks: Procurement & Installation of Stainless Steel Lever handle with mortised locks with minimum 3 keys
10
-
-
... More
Door Closers: Procurement & Installation of Automatic Hydraulic operated Silver colored Door Closers of Aluminium
9
-
-
... More
Door Stopper: Procurement & Installation of Screw tight 4 inch Stainless Steel Silver Polished Double Square Rod Door Stoppers with Bottom Rubber Tip
14
-
-
... More
Name Plates: 13 Doors shall be provided with SS plates containing NAME and ROOM NO in Bilingual format. Plate dimensions shall be 8”x4” and 2 mm thick. Font/number shall be written by etching. Details regarding list of names & format for name plates will be provided by Engineer-In-Charge
13
-
-
... More
Windows along with their frames are of following sizes: Large windows (3'11"x3'x11") 13 Numbers (2) Small windows (3'11"x1'11") 15 numbers
-
-
-
... More
Removal: Existing windows as described in 7.0 shall be removed including frame and Kota stone
30
-
-
... More
Granite Sill: Granite sills should be installed around window openings for all windows as described in 7.0 with a slope for rainwater drainage. The granite sill's edges must be set to match the plaster lining and chamfered or rounded.Rates shall be in running mtr
120
-
-
... More
New Windows: Standard window procurement and installation, along with related hardware, should involve single-glazed aluminium frame windows with approved heavy sections for sub frames, frames, shutter frames, mullions, couplers, tubular sections, beadings, etc. from approved manufacturers. 5 mm thickness toughened float glass fixtures and holdfasts should also be readily available in the commercial sector. The windows must be fixed by anchoring or drilling into the concrete.The windows must have handles, frication hinges made of stainless steel, and other necessary accessories. Rates shall be per unit area in sq mtr
30
-
-
... More
Blinds:Supply & install perforated roller blind with approved shade fabric for 11 Wide windows & 13 Small windows, (For External windows & enclosed areas on gen office side) comprising of polymer coated fiber fabric with minimum openness factor of 8% and max. of 14% as per AS standards. Having high heat reflection ratios. The roller mechanism shall be a molded unit made from engineering grade plastic polymer with steel spring support. The fabric shall be finished on the sides with edge tape duly welded for waviness control. The fabric shall be attached to the roller tube with high quality self-adhesive tape, with smooth manual operation. Supply & installation of black out blinds of approved shade fabric for 02 Wide windows & 02 Small windows (of area about 3.5 Sq mtr.) same as above but of Black out Fabric (Boardroom, Meeting Room).
35
-
-
... More
CUPBOARDS, CUPBOARD DOORS & LOFTS:Cupboards are of the following sizes (1) Large size 8'6" x 3'8" Depth: 2’3” ; 8 Nos. (2) Small Size 6'3" x 3'8" Depth: 2’3”; 6 Nos.
-
-
-
... More
Removal: Removal of cupboard doors, door frames, and inner shelf of all cupboards as described in 8.0. Lofts are of different sizes; Removal of ply fitted on lofts is in the scope of work
30
-
-
... More
Water proofing: Water proofing &plastering ting of inner surface of Cupboards, and loft area over cupboards
100
-
-
... More
Tiling: Providing & Constructing vitrified tiling on all the inner surfaces of cupboards and loft over upboards. Rates shall be per unit area sq mtr. Total area of tiling includes additional area of lofts of different dimensions.
90
-
-
... More
Cupboards door: Repair/ Installation of cupboards door including door frames, door fittings. 1.0 mm thick laminate of approved shade Teak wood shall be used for frames and 1.0 mm thick marine ply with laminate of approved shade for doors. Cost should include rates of essential fittings such as 6 inch door handle of SS and door tower bolts, 50 Nos. of Partition/Shelf's made up of 19 mm thick marine ply coated with acrylic paint .
30
-
-
... More
Loft Door: Installation of cupboards door including teak wood door frames, door fittings and 1.0 mm laminate of approved shade on commercial marine ply of 12 mm thick
4
-
-
... More
SPLIT AIR CONDITIONERS AND ITS ACCESSORIES
-
-
-
... More
Split Air conditioners: Removal from LG floor of VSB, shifting to 8th Floor of VSB and reinstallation 2.0TR split including gas filling.
5
-
-
... More
Copper tubing: Supplying and lying of 2.0 TR ACs with 13mm thick class O Armaflex insulation in between indoor and outdoor unit.
25
-
-
... More
Drain pipe: Supply and laying of PVC Drain piping of approved make, 25 mm dia. With one layer of Heatlon insulation overlap 0.6mm thick heatlon and PVC tape.
25
-
-
... More
Grill: Installation of Grill for ODU of AC of size 1100*800 frame made of carbon steel having 10 x 3 mm thick strip weighing approx. 8 kg.
16
-
-
... More
WALL PANELING AND ENTRANCE DOOR
-
-
-
... More
Wooden paneling: Installation of wooden frame having 12 mm thick marine ply laminate of approved colour at entrance of south wing on 8th floor, suitable for provision of logo of IGCAR and other occupants of 8th floor, South wing of VSB. IGCAR logo shall be provided on 10” dia 10mm thick glass along with name “TC& QMD, IGCAR” in SS lettering on the wooden paneling.
6
-
-
... More
Granite Sill: Supply and fixing of granite sill for glass door at entrance of south wing.
7
-
-
... More
Door: Supply and fixing of toughened heavy duty glass door of 7 mm (min.) thick glass with Aluminium door frame at the entrance of south wing. The door should have in-built SS patch glass door locking arrangement. The lock should be provided with minimum 3 keys.
2.7
-
-
... More
Waste Disposal: The waste accumulated during course of work should be disposed after completion of work as per direction of EIC.
1
-
-
... More
Scope: All the items supplied shall be as per this attached technical specifications, relevant standards and BOM. The scope of supply for internal electrification of IGCAR office at 8th floor of VSB, Anushaktinagar, include the following:-
-
-
-
... More
TRACING OF EXISTING WIRING:Tracing of existing Lighting, Fan and Power Socket wiring Layouts from Electrical Room PDB/LDB in South Wings of 8'th Floor VSB. Room layouts with dimensions of all rooms are attached
1
-
-
... More
DISCONNECTION & DISMANTLING OF EXISTING CIRCUIT WIRES
-
-
-
... More
Primary wiring:Disconnection & dismantling of existing Aluminium circuit wires(3 each) in existing conduits of various lengths for Lights, Fans & Sockets from LDB/PDB from Electrical Room (Room No.8S33) to all rooms as per attached room layout and disposal.
30
-
-
... More
Secondary wiring:Removal of existing Luminaries, Switches, their existing Aluminium circuit wires (3 each) of various lengths & Disposal of the wires. Scope of work also includes dismantling of the existing Luminaries, Switches and depositing them in packed condition at DCSEM stores.
52
-
-
... More
Disconnection & dismantling of existing Aluminium circuit wires (3 each) of various lengths in existing Casing & Capping for Power Sockets, Extension Socket Boxes & depositing the Extension Socket Boxes in packed condition at DCSEM stores.
20
-
-
... More
Dismantling of the existing ceiling fans & their existing Aluminium circuit wires (3 each) of various lengths and depositing the ceiling fans in packed condition in the same cartons of ceiling fans at DCSEM stores and Disposal of the wires
16
-
-
... More
MAIN WIRING (PRIMARY):Supply and installation of following type of MCB DBs. This is wall mounted type. All the MCB, MCCB, RCCB etc. shall be reputed make as per attached BOM & Technical Specifications and to be approved by Engineer-in-Charge (EIC).
-
-
-
... More
Supply & Installation of 3 phase MCB DB with 6 Nos. of single pole 20 Amps MCB in each phase. Input shall be 3 phase 63 Amps MCCB with 30mA RCCB in Room No. 8S36 & 8S27. Room Layout attached.
2
-
-
... More
Primary point wiring with following sizes of wire from the ELECTRICAL ROOM (Room No.8S33) MAIN DB to above Local MCB DB's. Supply of armoured Cable & installation is included in this item. 16 sq. Mm
22
-
-
... More
For Light & Fan point wiring from LDB at Electrical room (Room No.8S33):Laying of wires in existing concealed conduit/casing capping with 3 each. of 1.5 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs and then to the first point of Light/ Fan as required and instructed by EIC. The loads are to be equally distributed in all the three phases for load balancing. The above works also includes a) Supply & installation of 25 x 16mm size white / ivory PVC casing capping, on surface of slab / wall / column fixed with nylon rawal plug, GI wood screws at intervals of 300mm complete with all accessories like plastic junction boxes if required etc. This is used in case of choke up in the conduit while re wiring.b) Supply, installation of HMS PVC conduit with all accessories like all bends, junction boxes, bush adopter, PVC spacers and saddles etc. fixing with GI wood screws, rawal plugs on wall/column, across the wall between the rooms including making holes, filling the gaps with POP etc. This is used in case of choke up in the existing conduit
15
-
-
... More
For AC point wiring from Electrical room (Room No.8S33) Main PDB for 2 Ton AC: Supply, installation, testing and commissioning of Metal clad box with 32 A double pole MCB with 2 nos. of 4 sq.mm and 1no. of 2.5 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs as required in existing conduits/PVC casing & capping from Electrical room Main PDB as stated in Point No. 3.2 and instructed by EIC. The loads are to be equally distributed in all the three phases for load balancing.
9
-
-
... More
For AC point wiring from Local MCB DB in Room No. 8S36 & 8S27 for 2 Ton AC: Supply, installation, testing and commissioning of Metal clad box with double pole 32 A MCB with 2 nos. of 4 sq.mm and 1 no. of 2.5 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs as required in existing conduits/PVC casing & capping from Local MCB DB as stated in Point No. 14.03 and instructed by EIC. The loads are to be equally distributed in all the three phases for load balancing.
3
-
-
... More
For 6A Power point wiring from Electrical room (Room No.8S33) Main PDB: Supply, installation, testing and commissioning of 2 nos. of 2.5 sq.mm and 1no. of 1.5 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs as required in existing conduits/PVC casing & capping from Electrical room Main PDB as stated in Point No. 14.03 and instructed by EIC. The loads are to be equally distributed in all the three phases for load balancing.
9
-
-
... More
For 6A Power point wiring from Local MCB DB in Room No. 8S36 & 8S27: Supply, installation, testing and commissioning of 2 nos. of 2.5 sq.mm and 1no. of 1.5 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs as required in existing conduits/PVC casing & capping from Local MCB DB as stated in Point No. 14.03 and instructed by EIC. The loads are to be equally distributed in all the three phases for load balancing.
6
-
-
... More
For 15A Power point wiring from Electrical room (Room No. 8S33) Main PDB: Supply, installation, testing and commissioning of 2 nos. of 2.5 sq.mm and 1no. of 1.5 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs as required in existing conduits/PVC casing & capping from Electrical room Main PDB as stated in Point No. 14.03 and instructed by EIC. The loads are to be equally distributed in all the three phases for load balancing
9
-
-
... More
For 15A Power point wiring from Local MCB DB in Room No. 8S36 & 8S27: Supply, installation, testing and commissioning of 2 nos. of 2.5 sq.mm and 1no. of 1.5 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs as required in existing conduits/PVC casing & capping from Local MCB DB as stated in Point No. 14.03 and instructed by EIC. The loads are to be equally distributed in all the three phases for load balancing
7
-
-
... More
For 32A Power point wiring from Local MCB DB in Room No. 8S36 & 8S27: Supply, installation, testing and commissioning of 2 nos. of 6 sq.mm and 1no. of 4 sq.mm FRLS grade 1.1 kV HR PVC insulated flexible multi-stranded copper wires including termination of wires with suitable copper lugs at junction boxes/switch boards/MCBs as required in existing conduits/PVC casing & capping from Local MCB DB as stated in Point No. 14.03 and instructed by EIC.
2
-
-
... More
POINT WIRING:Providing point wiring for light / ceiling fan/6 A/16A sockets outlet/AC point etc. with 1100V grade, FRLS PVC insulated multi stranded copper wires in existing concealed conduit and /or providing 25 x 16mm size white / ivory PVC casing capping on surface fixed with nylon rawal plug, GI wood screws at intervals of 300mm complete with all accessories like plastic junction boxes if required etc, controlling modular switches with on existing surface switch boards with required Bakelite sheets/readymade fire retardant plastic boxes/readymade concealed GI switch boxes with cover plate & metal frame, angle / batten pendent lamp holders, PVC round plates, 6A connectors in concealed junction boxes, ferrule numbers on both sides, 1.1kV grade FRLS PVC insulated copper conductor wires for earthing of above said specifications, labeling etc. all as per site conditions, specifications, drawings and as instructed by Engineer-in-charge. Scope of work shall also includes providing the tags for wires inside casing & capping for bunching to avoid hanging of wires at the intervals of 600mm. Note: i). Wiring layout arrangement and samples of switch boxes are to be got approved prior to procurement.ii). All switches, sockets, cover plates & frame, plastic surface boxes, etc. shall be of white colour& similar to Myrius series of M/s Legrand and other accessories like lamp holders, ceiling roses & doorbell etc. shall be of polycarbonate body and shall preferably ISI marked.iii). The dimensions of switches, sockets, and fan regulators shall preferably be ISI mark.iv). HMS PVC sleeves will have to be provided for crossing the wall, drilling holes & it’s refinishing to be also included in the scope.v). The scope of work also includes removing of existing MS switch boards by breaking the brick wall, making suitable cut-outs (suitable for Legrand 8 x 1 module Arteor Flush Mounting box) in brick wall for fixing new switch boards, finishing with cement mortar, applying white putty as required, touch up painting for that area with OBD paint of existing shade and as per instructions of E-I-C.vi). All metallic boxes/switch boxes shall be earthed with 1.1kV grade FRLS PVC insulated 1.5sq.mm copper flexible wire.vii). The loads are to be equally distributed in all the three phases for load balancing.
-
-
-
... More
Supply & fixing of Legrand 8 x 1 module Arteor Flush Mounting box for Light & Fan points as above
12
-
-
... More
Light point with 1.5 sq.mm wires complete with 6A, SP, 240V controlling switch.
24
-
-
... More
Secondary Light point with 1.5 sq.mm wires
32
-
-
... More
Ceiling fan point with 1.5 sq.mm wires complete with 6A, SP, 240V switch (1-module).
16
-
-
... More
6 A Power Socket:
-
-
-
... More
Existing Box replacement(With Legrand 3 x 1 module Arteor Flush Mounting box)
11
-
-
... More
Supply and installation of New box (Legrand 3 x 1 module Arteor Flush Mounting box) including external casing/capping wiring as per point No. 14.07 & 14.06
11
-
-
... More
Supply and installation of 4/3 nos. 6A surface mounted, decorative type plug box with built in surge protector mounted on the work station/table(Legrand Model No. 054690A) - wiring from nearest power point with casing & capping
20
-
-
... More
15 A Power Socket
-
-
-
... More
Existing Box replacement (With Legrand 3 x 1 module Arteor Flush Mounting box)
2
-
-
... More
Supply and installation of New box (Legrand 3 x 1 module Arteor Flush Mounting box) with external casing/capping wiring as per point No. 14.09 & 14.08
9
-
-
... More
32 A Industrial Power Socket with 32A 2 pole MCB in Room No. 8S35 & 8S27: Supply and installation of New box with external casing/capping wiring as per Point No.14.10 from Local MCB DB
2
-
-
... More
Ceiling fan works
-
-
-
... More
Supply, installation, testing and commissioning of 1400 mm BLDC,BEE 5 Star Rated, Air Delivery230 CMM, Speed 350 RPM, Power 28-30 Watts (Max),THD5%,Power Factor0.99,Service Ratio8,Input Voltage 140-280 V AC, Aluminium Blades. The Fan Should be Confirming to IS 374/1979.BLDC fans with safety chains including interconnection to ceiling rose with 3C X 1.0 sq.mm flexible copper cable as per tender specifications in technical bid and instructed by the Engineer-in-Charge.
16
-
-
... More
LED light fixtures :Supply, installation, testing and testing and commissioning of following LED fixtures including interconnection of light point with 3 C x 1.0 sq.mm copper PVC insulated PVC sheath cable etc. Dismantling of existing lighting fixtures as required, loading, unloading, transporting and depositing the fixtures to DCSEM stores
-
-
-
... More
Surface mounted LED tube light fixture with dimension 2'(W)X 2'(L): min efficacy :- 100 lm/W, min.lumen output :- 3500Lm ,
CCT :- 6500 K, min.CRI :- 80min. P.f :- 0.95, min. I.P :- 20,THD- 10%,
Housing:- Extruded Aluminium having PS diffuser, Life L70B50 @ 50k hrs. BIS compliant driver. Driver shall have 4KV Surge protection
40
-
-
... More
Surface mounted LED tube light fixture with dimension 200mm(W)X 200mm (L) for Corridor; min efficacy :- 100 lm/W, min.lumen output :- 3500Lm ,
CCT :- 6500 K, min.CRI :- 80,min. P.f :- 0.95,
min. I.P :- 20,THD- 10%,Housing:- Extruded Aluminium having PS diffuser, Life L70B50 @ 50k hrs. BIS compliant driver. Driver shall have 4KV Surge protection
6
-
-
... More
LED recessed False Ceiling mount 2'x2' light of 32W having System Efficacy of 100 lm/W, system output 3200 Lumens, THD 10%, Power Factor 0.95, CRI 80, CCT 6500K, Body made of CRCA housing having PS diffuser, Life L70B50 @ 50k hrs. BIS compliant driver. Driver shall have 4KV Surge protection
8
-
-
... More
UPS
-
-
-
... More
Pure sine Wave Online UPS, 1 KVA / 800 Watts, Single Phase In, Single Phase Out, Input Voltage range :110VAC+5% - 300VAC+5%, Output Voltage : 220/ 230/ 240VAC, DC voltage system : 24 V DC With 2 Nos. SMF 12V / 9AH in -built batteries, Voltage regulation: +1% (Battery Mode),Harmonic distortion: 2%,Overload capability, Transfer time 4 msec, LCD Status display indication.
1
-
-
... More
AS - BUILT DRAWINGS :
-
-
-
... More
1. Making of New as built Lighting, Fan and Power Socket Layouts in South Wings of Floor 8. 2. Lighting and Power Distribution Single Line Diagrams for all the MCB DBs of Floor 8
1
-
-
... More
TELEPHONE WORKS
-
-
-
... More
Procurement and installation of 18 Nos. of Analogue Telephone sets with caller identification, Memory & Phone book
18
-
-
... More
Procurement and installation of ALCA Tel ALE-20h Desk Digital Telephone sets. Make has been specified in line with NRB Specifications as these instruments are to be connected to NRB Telephone exchange.
4
-
-
... More
Procurement and installation of Panasonic KX-TG3821SXB 2.4 GHz DIGITAL Cordless Telephone with caller ID, With Speaker Phone and rechargeable Ni-MH battery, 1.8-inch LCD display, message counter on LCD display, power failure talk system and reversible handset, Digital answering system with 50 name and number caller ID memory, 100 name and number phonebook entries
6
-
-
... More
Supply and Laying of 50 Pair telephone cable with RJ45 connectors - from 6'th floor North-West Telephone exchange room to IGCAR server room
100
-
-
... More
Overall rebate (Optional)
-
-
-
... More
INR Zero Only
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements