GAIL India Limited Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
GAIL India Limited - GAIL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date26 Jun 2024
Closing Date17 Jul 2024
Tender Amount₹ 1,43,25,200 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,04,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_GAIL_199486_1Bid Award Id
ViewTender No
GAIL/MU/CNP/ONM/24/C16Tender Authority
GAIL India Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
New Pipeline shifting from GAIL designated stores to HPCL Mumbai Refinery including loading & unloading, transportation, labour, etc.
1) IP4 (Borle, Panvel)
2) Taloja - Approx. 300 meters length pipeline i.e. approx. 25 no's 12 meter length pipelines, elbows, fittings, etc.
3) IP3 (Tarapur)
4) Tata power Trombay - Shifting of 12IN hydro testing header, pipes, fittings, etc. Scope includes all the machineries (cranes, transpiration vehicles and etc.), manpower, supply of misc. items & consumables and any other resource required for completion of mentioned job in totality.
1
-
-
... More
Supply of 12IN 300# Monolithic Insulation Joint from GAIL approved vendors including scope of TPI inspection at vendor's yard Scope includes supply, transportation, TPI deployment for inspecton at vendor workshop, installation Monolithic Insulation Joint for the project and any other resource required for completion of mentioned job in totality.
1
-
-
... More
Development of procedures & drawings
1) Route finalisation with actual measurements as per site conditions
2) GAD / Isometric development with full required Bill of Materials (BOM)
3) Execution Procedures & Methodologies preparation
4) Preparation of WPS followed by PQR, EQT, WQT, etc.
5) Preparation of civil pedestal support drawings
6) Preparation of structural steel support drawings
7) Preparation of pipe books, as built drawings after completion of job Scope includes developments of procedures, drawings, and etc. as mentioned above including submission of soft copies of same to GAIL and any other resource required for completion of mentioned job in totality.
1
-
-
... More
Pipe fabrication near existing pipeline with temporary supports as per approved schematics. Best efforts to be made to minimise the golden welding joints.
1) Pipes & fittings bevelling and DPT of bevel ends.
2) Checking ovality & removal if required
3) Welding of pipes and fittings
4) Stepwise NDT as per approved procedures
5) Hydro testing of prefabricated spool pieces including supply of water Scope includes all the machineries and equipment (welding machine, pipe clamps, cutters, cranes, rollers for pipe shifting, etc.), manpower, supply of misc. items & consumables, NDT (like DPT, MPT, Radiography, and Ultrasonic Testing) & hydro testing with calibrated devices and any other resource required for completion of job in totality.
1
-
-
... More
N2 purging (liquid N2 tankers with evaporator) of 3.5kms pipeline section during shutdown and regas in after shutdown Scope includes all the machineries and equipment (tankers, evaporator, calibrated monitoring equipment, LEL monitoring at HPCL / BPCL / TPC ends, Blind reversal with non-sparking tools & manpower at HPCL terminal, Misc. assistance to GAIL during shutdown, etc.), manpower, supply of misc. items & consumables, calibrated devices and any other resource required for completion of job in totality. Measurement shall be as per actual consumption during execution.
10
-
-
... More
Assistance in shutdown jobs of terminal with dedicated crew
1) Replacement of Gaskets including supply of gaskets SS Outer, SS Spiral - 8" Size Flange
2) Replacement of skid flanges old stud bolts & nuts with GI coated new bolts & nuts of grade A193 GR B7 & 2H - all Stud for 8" Flange Scope includes all the machineries and equipment (tankers, evaporator, calibrated monitoring equipment, etc.), manpower, supply of new bolts & nuts, metallic spiral wound gaskets for entire HPCL skid flanges, non-sparking tools, calibrated devices and any other resource required for completion of job in totality. Measurement shall be as per actual execution.
60
-
-
... More
Assistance in shutdown jobs of terminal with dedicated crew
1) Replacement of Gaskets including supply of gaskets SS Outer, SS Spiral - 6" Size Flange
2) Replacement of skid flanges old stud bolts & nuts with GI coated new bolts & nuts of grade A193 GR B7 & 2H - all Stud for 6" Flange Scope includes all the machineries and equipment (tankers, evaporator, calibrated monitoring equipment, etc.), manpower, supply of new bolts & nuts, metallic spiral wound gaskets for entire HPCL skid flanges, non-sparking tools, calibrated devices and any other resource required for completion of job in totality. Measurement shall be as per actual execution.
20
-
-
... More
Assistance in shutdown jobs of terminal with dedicated crew
1) Replacement of Gaskets including supply of gaskets SS Outer, SS Spiral - 4" Size Flange
2) Replacement of skid flanges old stud bolts & nuts with GI coated new bolts & nuts of grade A193 GR B7 & 2H - all Stud for 4" Flange Scope includes all the machineries and equipment (tankers, evaporator, calibrated monitoring equipment, etc.), manpower, supply of new bolts & nuts, metallic spiral wound gaskets for entire HPCL skid flanges, non-sparking tools, calibrated devices and any other resource required for completion of job in totality. Measurement shall be as per actual execution.
20
-
-
... More
Assistance in shutdown jobs of terminal with dedicated crew
1) Replacement of Gaskets including supply of gaskets SS Outer, SS Spiral - 2" Size Flange
2) Replacement of skid flanges old stud bolts & nuts with GI coated new bolts & nuts of grade A193 GR B7 & 2H - all Stud for 2" Flange Scope includes all the machineries and equipment (tankers, evaporator, calibrated monitoring equipment, etc.), manpower, supply of new bolts & nuts, metallic spiral wound gaskets for entire HPCL skid flanges, non-sparking tools, calibrated devices and any other resource required for completion of job in totality. Measurement shall be as per actual execution.
40
-
-
... More
Dismantling works
1) Cutting, removal & shifting of old existing pipe approx. 230-250 meter
2) Breaking of old pedestal supports
3) Dismantling of old structural steel supports
4) shifting of old pipeline to pipe yard Scope includes all the machineries and equipment (welding machine, cutters, cranes, rollers for pipe shifting, etc.), manpower, supply of misc. items & consumables, calibrated devices and any other resource required for completion of job in totality. Actual length may vary as per site conditions.
1
-
-
... More
Hook-up of new pipeline with existing pipeline including NDT as per golden joints. Best efforts to be made to minimise the golden welding joints. Includes all machinery, tools, labour, etc. Scope includes all the machineries and equipment (welding machine, pipe clamps, cutters, cranes, rollers for pipe shifting, etc.), manpower, supply of misc. items & consumables, NDT (like DPT, MPT, Radiography, and Ultrasonic Testing) with calibrated devices and any other resource required for completion of job in totality.
1
-
-
... More
Concrete works M25 grade for pipeline supports as per approved drawings along with waterproof coating / decarbonisation coating Scope includes all the machineries and material (RMC machine, shuttering material, supply of reinforcement rods, etc.), manpower, supply of misc. items & consumables, and any other resource required for completion of job in totality. Measurement shall be as per actual execution.
200
-
-
... More
Structural steel works as per approved drawings 1) For replacement of trestle bridge towards TPC side
2) For construction of new trestle bridge inside HPCL for road crossing
3) Misc. structural supports & works Scope includes all the machineries and equipment (welding machine, cutters, cranes, rollers for pipe shifting, etc.), manpower, supply of misc. items & consumables, supply of structural steel, and any other resource required for completion of job in totality. Measurement shall be as per actual execution.
10
-
-
... More
Painting of HPCL gas terminal skid and pipeline with dedicated team (Manual cleaning)
1) Hand cleaning of skid piping to remove loose corrosion
2) Application of paint with 3 layer epoxy paint
3) Stencilling of line numbers, contact numbers, etc. Scope includes supply of all the tools & tackles for painting, manpower, supply of misc. items & consumables and any other resource required for completion of mentioned job in totality. Measurement shall be as per actual execution.
200
-
-
... More
Painting of HPCL gas terminal skid and pipeline with dedicated team (sand blasting)
1) Sand blasting of skid piping to remove loose corrosion and to create new anchor profile.
2) Application of paint with 3 layer epoxy paint
3) Stencilling of line numbers, contact numbers, etc. Scope includes carrying out sand blasting of terminal skid along with all other required material for safe execution, supply of all the tools & tackles for painting, manpower, supply of misc. items & consumables and any other resource required for completion of mentioned job in totality. Measurement shall be as per actual execution.
200
-
-
... More
Coating of pipeline with hot shrink sleeves
Heat Shrink sleeve: Sleeve Denso/Raychem make/EQUIVALENT
including supply of coating material (sleeves), primer, mastic, coating man(insulator), holiday machine with operator, heating torch with LPG cylinder, roller etc. whatsoever required to complete the coating job in all aspect and as per direction of GAIL. Scope includes carrying out hot shrink sleeve coating by applicator along with supply of hot shrink sleeves as required, sand blasting to achieve anchor profile on pipe, supply of all the tools & tackles for painting, manpower, supply of misc. items & consumables and any other resource required for completion of mentioned job in totality.
50
-
-
... More
Misc. civil building works at HPCL (Dimensions: 16 mtr (L) x 7 mtr (W) with 7 rooms: 3 equipment, 2 store, 1 toilet, 1 guard room separate). Refer tender annexures for drawings.
1) Painting of control room building
2) Door closures & bearings replacement
3) Washroom taps, wash basin & commode replacement
4) Washroom tiles replacement
5) Windows repair / replacement as required Scope includes carrying of building repair / replacement work including supply of required material from reputed vendors, supply of all the tools & tackles, manpower, supply of misc. items & consumables and any other resource required for completion of mentioned job in totality.
1
-
-
... More
Misc. civil porta cabin works at TPC (Dimensions: 15 mtr (L) x 6 mtr (W) with 5 rooms: 3 equipment, 1 store, 1 toilet). Refer tender annexures for drawings.
1) Repair and replacement of porta cabin parts includes replacement of floor panels, side walls sheet inside & outside, roof sheet, false sealing, etc. 2) Water proofing works if required
3) Painting of porta cabin with 3 layer epoxy paint system
4) Door closures & bearings replacement
5) Washroom taps, wash basin & commode replacement
6) Washroom connections repair
7) Windows repair / replacement as required Scope includes carrying of building repair / replacement work including supply of required material from reputed vendors, supply of all the tools & tackles, manpower, supply of misc. items & consumables and any other resource required for completion of mentioned job in totality
1
-
-
... More
Shifting of old pipeline & surplus items to GAIL designated store at IP4 / Mangaon Scope includes all the machineries (cranes, transpiration vehicles and etc.), manpower, supply of misc. items & consumables and any other resource required for completion of mentioned job in totality.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements