Forest Department Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Forest Department - HFF Tender

Works
Civil And Construction
Eprocure
Opening Date7 Feb 2024
Closing DateCancelled
Tender Amount₹ 42,60,647 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and fixing welded mesh fabric for gunting of mesh size 75 mm X 75 MM with 10 Guage i.g. 3.25 mm tthick including scaffolding ect complete

415.8

486652

1170.4

... More
Gabion Structure Part-II Exacavatin of Nalla in hard Murum

101.48

23353

230.13

... More
Collection of Stone boulder and constuction of Gabion Sturcture

137.66

88917

645.92

... More
Lead for stone boulder 8/10

137.66

36635

266.13

... More
Providing and fixing welded mesh fabric for gunting of mesh size 75 mm X 75 MM with 10 Guage i.g. 3.25 mm tthick including scaffolding ect complete

415.8

486652

1170.4

... More
Gabion Structure Part-III Exacavatin of Nalla in hard Murum

101.48

23353

230.13

... More
Collection of Stone boulder and constuction of Gabion Sturcture

137.66

88917

645.92

... More
Lead for stone boulder 8/10

137.66

36635

266.13

... More
Providing and fixing welded mesh fabric for gunting of mesh size 75 mm X 75 MM with 10 Guage i.g. 3.25 mm tthick including scaffolding ect complete

415.8

486652

1170.4

... More
CCT-10 Ha Survey & demarketion of cct Allignment of cct, Total 7570 RMT, continiu 20 MTR CCT, Gaping 3.00 MTR. For 1.25 MD. Per hac and M&S 100.00 Rs Exacavation of CCT folling formation 0.60 MTR. Width 0.30 MTR Depth, Horizatal line 20 MTR. Contunious & line Gap 6.00 MTR. Total CCT 1514 MTR. Per hac. 10% in soft murum=1514X0.60X0.30=272.50 =272.50@10%= 27.25X112.21=3057.72 90% in hard murum=1514X0.60X0.30=272.50 =272.50@90%=245.25X156.98=38499.35 Total Amount 41.557.07 Ghaipat purches or collectionof ghaipat & planting ghaipal to Gallyping inside exacavated material Seed purches or collection of seed karanj khair kadunim (For 100 MTR 1.00 KG) & Sowing seed karanj khair kadunim (0.0025 MD Per RMT)

1674.98

782533

467.19

... More
M.N.B. Part-I Exacvation in all kind of soils & soft murum including boulder upto 0.60M DIA

841.48

34988

41.58

... More
Exacavation in hard murum including boulder upto 0.60M DIA

1329.78

71528

53.79

... More
Exacavation in soft rock without blasting including boulder upto 0.60M DIA

184.6

12914

69.96

... More
Lift for exacavated Material 12/1

600

45534

75.89

... More
Lift for exacavated Material 12/2

402.19

43919

109.2

... More
Lift for exacavated Material 12/3

60.94

9563

156.93

... More
Providing casing embankment using selected priviou material available directly from exacavation in layers including cost of material machinary labour all other opration such as collecion of material, Spreading material in layer sorting our breking clod levelling, side cutting watering ETC.

1925.29

161801

84.04

... More
Providing constructiong 300 MM thick dry rubble stone pitching

284.94

94611

332.04

... More
lead for stone 5 KM.

85.48

48957

572.74

... More
M.N.B. Part-II Exacvation in all kind of soils & soft murum including boulder upto 0.60M DIA

841.48

34988

41.58

... More
Exacavation in hard murum including boulder upto 0.60M DIA

1329.78

71528

53.79

... More
Exacavation in soft rock without blasting including boulder upto 0.60M DIA

184.6

12914

69.96

... More
Lift for exacavated Material 12/1

600

45534

75.89

... More
Lift for exacavated Material 12/2

402.19

43919

109.2

... More
Lift for exacavated Material 12/3

60.94

9563

156.93

... More
Providing casing embankment using selected priviou material available directly from exacavation in layers including cost of material machinary labour all other opration such as collecion of material, Spreading material in layer sorting our breking clod levelling, side cutting watering ETC.

1925.29

161801

84.04

... More
Providing constructiong 300 MM thick dry rubble stone pitching

284.94

94611

332.04

... More
lead for stone 5 KM.

85.48

48957

572.74

... More
M.N.B. Part-III Exacvation in all kind of soils & soft murum including boulder upto 0.60M DIA

841.48

34988

41.58

... More
Exacavation in hard murum including boulder upto 0.60M DIA

1329.78

71528

53.79

... More
Exacavation in soft rock without blasting including boulder upto 0.60M DIA

184.6

12914

69.96

... More
Lift for exacavated Material 12/1

600

45534

75.89

... More
Lift for exacavated Material 12/2

402.19

43919

109.2

... More
Lift for exacavated Material 12/3

60.94

9563

156.93

... More
Providing casing embankment using selected priviou material available directly from exacavation in layers including cost of material machinary labour all other opration such as collecion of material, Spreading material in layer sorting our breking clod levelling, side cutting watering ETC.

1925.24

161797

84.04

... More
Providing constructiong 300 MM thick dry rubble stone pitching

284.89

94594

332.04

... More
lead for stone 5 KM.

85.48

48957

572.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.