Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Forest Department Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date24 Jul 2023
Closing Date7 Aug 2023
Tender Amount₹ 11,99,326
Costs
EMD
₹ 11,993Document Cost
₹ 600Tender Fee
Refer Documents
Summary
Construction Of Mati Nala Bandh At Balewadi No 1h And Balewadi No 2 H Gat No 65 Tal. Nagar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HFFN_927934_1Bid Award Id
ViewTender No
Forest Tender No.02/2023-24Tender Authority
Forest Department ViewPurchaser Address
-Website
http://mahatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item No. 4 Excavation of Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filterr drain/ catch water drains etc., and placing the excavated soft rock neatly in dump area of for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead 15 m and all lift as directed ( Details As per Estimate)
162.45
10437
64.25
... More
Item No. 5 Excavation in Hard Rock of all toughness by blasting including boulders above 0.6 m dia, (0.113 cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-splitting/ smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed inlcluding cost of all materials machinery, labour, levelling bed etc. complete with lead 15 m and all lift as directed. ( Details As per Estimate)
48.6
19882
409.1
... More
Item No. 6 providing cut of trench filling using selected impervious soil directly available from material of excavation inlcuding cost of all materials, machinery, labour all otherr operations such as collection of soil, spreading soil in layer of specified, thickness, sorting out, breaking clods, levelling, sections adges/ sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated vibratory compactor including cost of water etc., complete with lead up to 1 km for water and other lifts as directed B) Approved borrow area (Government acquired land) ( Details As per Estimate)
224.41
37375
166.55
... More
Item No. 7 providing casing embankment using selected pervious material available directly from excavation in layers including cost of all materials, machinery, labour all other operations, such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges/ sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of waterr etc. complete with lead up o 1 km and all lifts as directed. A) Available from material of excavation ( Details As per Estimate)
168.21
12977
77.15
... More
Item No.7 a) Guide Bund ( Details As per Estimate)
90
6943
77.15
... More
Item No.7 B) Approved borrow areas (Government acquired land) ( Details As per Estimate)
891.58
162445
182.2
... More
Item No. 8 Providing hearting embankment using selected impervious material available directly from excavation in layers inlculding cost of all materials, machinery, labour, all other operations such as collection of material, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges/ sides, watering compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc. complete with lead up to 1 km and all lifts as directed.B) Approved borrow areas (Government acquired land) ( Details As per Estimate)
608.89
104485
171.6
... More
Item No. 9 Providing and constructing 230 mm. thick dry rubble stone pitching using stones and stone chips from locally available, excavated materials inlcuding labour, hand packing/ wedging stone chips, finishing etc. complete with lead up to 50 m and all lifts. A) Available from material of excavation ( Details As per Estimate)
138.86
6304
45.4
... More
Item No. 9 B) Approved Borrow areas ( Details As per Estimate)
176.74
31777
179.8
... More
Balewadi No 2 H Item No. 1 Cleaning cutting thorny shrubs bushes, grass as directed with 15 m lead and all lift etc. complete as directed. (Details As per Estimate)
1379.77
5864
4.25
... More
Item No.2 Excavation in all kinds of Soils including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drains/ catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road/embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc. complete with lead up to 15 m and all lift as directed. ( Details As per Estimate)
606.83
23180
38.2
... More
Item No. 3 Excavation in Hard Murum including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filter drain/ catch water drains etc., placing the excavated material neatly in dump area of for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides tto required level and profile etc., complete with lead 15 m and all lift as directed. ( Details As per Estimate)
362.63
17913
49.4
... More
Item No. 4 Excavation of Soft Rock without blasting including boulders up to 0.6 m diameter (0.113 cum) for canal, seating of embankment, filterr drain/ catch water drains etc., and placing the excavated soft rock neatly in dump area of for formation of service road as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead 15 m and all lift as directed ( Details As per Estimate)
207.75
13347
64.25
... More
Item No. 5 Excavation in Hard Rock of all toughness by blasting including boulders above 0.6 m dia, (0.113 cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-splitting/ smooth blasting techniques and placing the excavated rock neatly in approved dump area as directed inlcluding cost of all materials machinery, labour, levelling bed etc. complete with lead 15 m and all lift as directed. ( Details As per Estimate)
94.5
38659
409.1
... More
Item No. 6 providing cut of trench filling using selected impervious soil directly available from material of excavation inlcuding cost of all materials, machinery, labour all otherr operations such as collection of soil, spreading soil in layer of specified, thickness, sorting out, breaking clods, levelling, sections adges/ sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated vibratory compactor including cost of water etc., complete with lead up to 1 km for water and other lifts as directed B) Approved borrow area (Government acquired land) ( Details As per Estimate)
439.2
73148
166.55
... More
Item No. 7 providing casing embankment using selected pervious material available directly from excavation in layers including cost of all materials, machinery, labour all other operations, such as collection of material, spreading material in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges/ sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of waterr etc. complete with lead up o 1 km and all lifts as directed. A) Available from material of excavation ( Details As per Estimate)
323.5
24958
77.15
... More
Item No.7 a) Guide Bund ( Details As per Estimate)
90
6943
77.15
... More
Item No.7 B) Approved borrow areas (Government acquired land) ( Details As per Estimate)
1718.15
313046
182.2
... More
Item No. 8 Providing hearting embankment using selected impervious material available directly from excavation in layers inlculding cost of all materials, machinery, labour, all other operations such as collection of material, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges/ sides, watering compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc. complete with lead up to 1 km and all lifts as directed.B) Approved borrow areas (Government acquired land) ( Details As per Estimate)
1127.1
193410
171.6
... More
Item No. 9 Providing and constructing 230 mm. thick dry rubble stone pitching using stones and stone chips from locally available, excavated materials inlcuding labour, hand packing/ wedging stone chips, finishing etc. complete with lead up to 50 m and all lifts. A) Available from material of excavation ( Details As per Estimate)
270
12258
45.4
... More
Item No. 9 B) Approved Borrow areas ( Details As per Estimate)
275.31
49499
179.8