Dredging Corporation Of India Limited Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Dredging Corporation Of India Limited - DCI Tender

Works
Eprocure
Opening Date8 Jul 2021
Closing Date16 Aug 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Section A to B (In depth 15.6 Mtrs)

5000000

-

-

... More
Section B to C (In depth 15.4 Mtrs)

1500000

-

-

... More
Section C to D (In depth 14.6 Mtrs)

3000000

-

-

... More
Section D to E (In depth 14.4 Mtrs)

500000

-

-

... More
Emergency Anchorage (In depth 14.60 / 16.2 Mtrs)

2000000

-

-

... More
To carry out maintenance dredging of JN Port in the following sections as per drawing and dumping the dredged spoil at designated dumping ground DS-3 as indicated in the drawing including mobilisation and demobilization of Trailer Suction Hopper Dredger(s) and WID/Bed Leveler, Surveys etc complete in all respects.

-

-

-

... More
Section E to F (In depth 14.4 Mtrs)

2000000

-

-

... More
EF Berth Pockets (a width of (78.0 Mtrs) (In depth 16.2 Mtrs)

200000

-

-

... More
Lagoon Area & Box area of 100 x 100 m in Lagoon. (In depth 10.70 Mtrs & 9.2 Mtrs)

200000

-

-

... More
LB-2 Berth Pocket &Maneuvering area (In depth 11.2 Mtrs)

100000

-

-

... More
BMCT Area (In depth 12.80 / 14.4 Mtrs)

600000

-

-

... More
BMCT Berth Pockets (a width of 70.00 Mtrs ) (In depth of 16.2 Mtrs)

400000

-

-

... More
JNPT New anchorage near Uran (In depth of 11.2 Mtrs)

500000

-

-

... More
Sub Total of BOQ-I (Total of items 1 .2 to 2.7) excluding GST

1

-

-

... More
Name of the work : Chartering of dredgers on Cubic Meter basis for the work of Maintenance dredging at Mormugao Port for the year 2021-22 and 2022-23 at MPT. (BOQ-II)

-

-

-

... More
NOTE : a) The Quantity mentioned in the BOQ-II is for 2021-22 only. b) The quantities mentioned in the above BOQ -II is only indicative, it may vary +/-20% . However, the actual quantities to be dredged will be ascertained from joint Pre dredge surveys. c) The actual quantity certified by MPT will be paid on back to back to basis (Upon receipt of payment from MPT) d) The quoted rates inclusive of Mobilization & Demobilization, Fuel, Lube oil, men and material, watch keeping, repair cost, spares cost, all taxes, but excluding GST.

-

-

-

... More
Carrying out maintenance dredging of Navigational channel, approach to and alongside berth Nos 4, 5A, 6A, 8, 10,11, Break water and Mole berths, Inner Turning circle, Outer Turning circle, Outer channel from A1 to A5 areas, Mooring Dolphins MD1 to MD3 areas and dumping the dredged spoil in the designated offshore dumping area which is from 3 to 4 nautical miles from the break water including mobilization & demobilization of dredger fuel, etc complete, in all respects.

2200000

-

-

... More
Sub Total of BOQ-II (Total of items 3.2) excluding GST

1

-

-

... More
Name of the work : Chartering of dredgers on Cubic Meter basis for the work of Post Monsoon Maintenance dredging at New Mangalore Port for the year 2021-22 and 2022-23 at NMPT. (BOQ III)

-

-

-

... More
NOTE : a) The Quantity mentioned in the BOQ-III is per each year. b) The quantities mentioned in the above BOQ -III is only indicative, it may vary +/-20% . However, the actual quantities to be dredged will be ascertained from joint Pre dredge surveys. c) The actual quantity certified by NMPT will be paid on back to back to basis (Upon receipt of payment from NMPT) d) The quoted rates inclusive of Mobilization & Demobilization, Fuel, Lube oil, men and material, watch keeping, repair cost, spares cost, all taxes, but excluding GST.

-

-

-

... More
Maintenance dredging on In-situ basis by deploying Trailer suction hopper dredger in the areas of Outer approach channel, Lagoon (The drawing of the dredging area enclosed) including Oil Dock arm, Turning circle and KIO Berth (Extension Lagoon). The areas required to be dredged from the existing levels to their minimum designed depths as detailed below. During the course of dredging if any hard strata encountered, the contractor has to deploy cutter suction dredgers/ Bucket Ladder dredgers or any suitable equipment to clear these hard patches. Up to a depth of (-) 8.00 Mtrs CD at Berth No. 1, and in front of Berth No.1 up to centre line of OAC, (-) 12.00 M CD at Berth No.2, (-) 11.00 M CD at Berth No3, (-) 10.50 M CD t Berth No.4 to 7 in the ODA, & 14(E), (-)14.00 M CD at B. No.8& 12, (-)12.50 M CD at Berth No. 9, (-) 15.10 M CD at Berth Nos. 14(W), 15, 16, 10, 11 & 13. The Outer approach channel is of total length 7500. Mtrs (Towards Sea which depends upon the shifting of the (-)15.4 M contour due to siltation. Maintenance dredging of all these areas involves dredging in all types of soil comprising of fine silt, sand hard/stiff clay, any hard strata encountered due to settlement of fine silt, sand etc. The material so dredged is to be transported and dumped at the designated dumping ground located at a distance of 7.00 KMs towards North west direction from the intersection point of the outer approach channel with (-)15.40M contour line including Mobilization & Demobilization charges for TSHD including survey launch, Routine boat and hire charges of all plant & equipment, cost of labor, materials and consumables etc, complete for the satisfaction completion of Dredging work.

6500000

-

-

... More
Dredging on In-situ basis by using special dredging equipment Viz Grab/ Cutter / Bucket/Plough etc with allied equipments to dredge/clear the area within 0 to 7 Mtrs from the berth face whenever berth is vacant without affeting the Port operations from the existing levels in all types of soils comprising of sand, silt deposits spillage of iron ore / mines, fallen wooden logs , tyres, fenders, boulders, rock/ concrete pieces , debris , steel plates , chains , wire ropes , cement bags , tarpaulins etc. Upto a depth of (-) 8.00 Mtrs CD at Berth No. 1, and in front of Berth No.1 up to centre line of OAC , (-) 12.00 M CD at Berth No.2, (-) 11.00 M CD at Berth No3, (-) 10.50 M CD at Berth No.4 to 7 in the ODA, & 14(E),(-)14.00 M CD at B. No.8& 12, (-)12.50 M CD at Berth No. 9, (-) 15.10 M CD at Berth Nos. 14(W), 15, 16 , 10, 11 & 13. Without damaging the existing structures, fenders etc. and dumping the dredged material at deeper areas away from the berth face and the same shall be dredged / cleared simultaneously by TSHD and dumped the same at the designated dumping ground located at a distance about 7.00 KMs towards North-west direction from the intersection point channel with (-)15.4 M contour in the centre line of the outer approach channel including channel including Mobilization &Demobilization charges for TSHD including survey launch , Routine boat and hire charges of all plant & equipment, cost of labour, materials and consumables etc, and transporting and dumping the dredged material in the designated dumping ground. For satisfaction completion of the Dredging work. Please check

52000

-

-

... More
Diving charges to collect sea bed samples

12

-

-

... More
Dredging all types of below the deck soils including sand , silt , loose clay and hard / stiff clay below the deck structure area of pump house No. 1,2 and 3 from the existing level to (-) 6.0 0 MCD for 1 &2 and (-) 10.00 MCD for pump house No. 3 with a tolerance of +0.5 Mtrs including slope and to discharge dredged material to the dock arm areas uniformly beyond a lead of 150 Mtrs as directed by the Engineer –In-charge by a deploying a circle pump dredger 250 Cumper hour output or a suction pump dredger or any other suitable method including cost of labour , mobilization , demobilization etc complete for successful completion of work.

10900

-

-

... More
Sub Total of BOQ-III (Total of items 4.2 to 7) excluding GST

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.