Department Of Heavy Industry Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Department Of Heavy Industry - DHI Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date19 Jul 2024
Closing Date30 Jul 2024
Tender AmountRefer Documents
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DHI_764725_1Tender No
ID-95-PR-20011210Tender Authority
Department Of Heavy Industry ViewPurchaser Address
-Website
http://https://dhi.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Installation and testing of compressed air piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed inside TC #1, which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. Piping to be painted with one coat of primer and two coats of oil enamel paint. Painting material to be supplied by vendor.
Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: GI
Piping size: 1 inch
40
-
-
Installation and testing of compressed air piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed inside TC #1, which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. Piping to be painted with one coat of primer and two coats of oil enamel paint. Painting material to be supplied by vendor.
Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: GI
Piping size: 1/2 inch
20
-
-
Installation and testing of fuel system piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed inside TC #1, which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. All SS piping joints to be cleaned using buffing wheel. Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: SS
Piping size: 1/2 inch
10
-
-
Installation and testing of fuel system piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed inside TC #1, which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. All SS piping joints to be cleaned using buffing wheel. Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: SS
Piping size: 3/4 inch
10
-
-
Installation and testing of exhaust system piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed inside TC #1 and plant room, which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. All SS piping joints to be cleaned using buffing wheel. Exhaust piping to be insulated using rockwool of minimum 50 mm thickness, and further 24 gauge GI cladding. Insulation, cladding material to be supplied by vendor.
Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: SS
Piping size: 12 inch
15
-
-
Installation and testing of exhaust system piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed inside TC #2 and plant room, which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. All SS piping joints to be cleaned using buffing wheel.
Exhaust piping to be insulated using rockwool of minimum 50 mm thickness, and further 24 gauge GI cladding. Insulation, cladding material to be supplied by vendor.
Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: SS
Piping size: 10 inch
5
-
-
Installation and testing of fuel dump system piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed above engine corridor entry shutter, , which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. All SS piping joints to be cleaned using buffing wheel.
Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: SS
Piping size: 1-1/2 inch
15
-
-
Installation and testing of fuel dump system piping with all fittings like, tee, elbow, flanges, etc. along with its MS supports installed above engine corridor entry shutter, which was removed earlier. Piping to be laid as per finalised layout as per directions of engineer in charge. All joints to be welded properly. Proper MS supports to be provided for piping. All SS piping joints to be cleaned using buffing wheel.
Any additional pipe, fittings, support material if required, will be provided by ARAI. However machining, fabrication, installation, welding to be done by vendor.
Billing will be done as per actual site measurements of installed piping.
After installation of piping, same is to be pressure tested for confirmation of zero leakage.
Piping MOC: MS
Piping size: 3 inch
10
-
-
Installation and testing of overflow switch in fuel dump pipe. Overflow switch of flanged end connections will be provided by ARAI. Also corresponding flanges, gaskets, nut bolts will be provided by ARAI. Existing pipe to be cut and flanges to be welded for installation of overflow switch. Pipe MOC is MS and Size is 3 inch.
2
-
-