Department Of Agriculture Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Department Of Agriculture - DoA Tender

Works
Eprocure
Opening Date18 Mar 2021
Closing Date23 Mar 2021
Tender Amount₹ 13,79,956 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in Soft Rock with boulders including stacking the material as directed with lead upto 15 m. & lift upto 1.5 m. including dressing

135.23

-

55.3

... More
Fulling cut of trench with slected materil obtained from borrow area including transportinf the meteral up to lead of 15 m and lift up 1.5m including laying in layers leveling the work breaking clods including watering and consolidation including royalty of materials etc complate lead of water up to One km

49.8

-

31.45

... More
Providing & constructing 230 MM thick dry Rubble stone pitching using stones & stone chips from approved source from borrow area including cost of material,labour,hand packing stone chips, finishing etc completed with lead up to 50 m & all lifts Excluding royalty of material

110

-

254.85

... More
Providing and laying in situ cement concrete of grade M-15 (40 MSA) of trap / granite / quartzite / graded metal for foundation and bedding,with concrate Mixer compacting and curing . Including royalty of material ets.complete with an initial lead of 50 m. lift of 1.5 m. (CSR-17-18)

109.8

-

3272.15

... More
Providing and laying in situ cement concrete of grade M-15 (40 MSA) of trap / granite / quartzite / graded metal for Sub & Super Structure,with concrate Mixer compacting and curing . Including royalty of material ets.complete with an initial lead of 50 m. lift of 1.5 m. (CSR-17-18)

96.05

-

3973.75

... More
Providing and fixing deformed temperature steel in weir section of IS 456:2000 reinforcement bars as per design & drawing including cutting, bending , hooking and binding with G.I. Wires with all leads & lifts etc complete as directed and as per specification

270.76

-

406.75

... More
Providing and fixing deformed temperature steel in weir section of IS 456:2000 reinforcement bars as per design & drawing including cutting, bending , hooking and binding with G.I. Wires with all leads & lifts etc complete as directed and as per specification

0.66

-

40250

... More
Cement -

53.53

-

108.86

... More
Steel -

0.66

-

108.86

... More
Sand -

92.63

-

679.43

... More
Metal -

183.2

-

679.43

... More
Water -

205.85

-

21.15

... More
Stone-

29.1

-

831.22

... More
Royalty

1

-

43099

... More
Providing fixing in position name board/Notice board as per standard design including painting & lettering as directed etc. complete

1

-

11365

... More
Photo

1

-

2000

... More
Provision For Work Labour Welfare Charge at 1% of work cost

1

-

11986

... More
Provision For Work Insurance Charge at 1% of work cost

1

-

11986

... More
GST 12 % Charge on Total Work Cost of Work

1

-

143829



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.