Department Of Agriculture Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Department Of Agriculture Tender
Construction Material
Eprocure
Opening Date7 Dec 2024
Closing Date27 Dec 2024
Tender AmountRefer Documents
Costs
EMD
Refer DocumentsDocument Cost
₹ 1,000Tender Fee
₹ 500
Summary
Construction Of Silo Platform 2000 Mt With Accessories, Material And Machineries Of Silo
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DOAWB_1122004_1Tender No
Nagar/Goods/Punyashlok/2024Tender Authority
Department Of Agriculture ViewPurchaser Address
-Website
http://mahatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 meters, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 m to 3.0 m) by Mechanical Means
1
-
-
... More
Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiseling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 meters from the building area including dewatering and back filling with available earth/ murum watering, ramming etc. complete, (Lift from 1.5m To 3.0 m) by Mechanical Means.
1
-
-
... More
Providing and laying Cast in situ/ Ready Mix cement concrete in Mix- 10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with Ordinary Concrete mixer, etc. complete. With fine aggregate (Crushed sand V.S.I. Grade).
41
-
-
... More
Providing and laying in situ/ ready mix M-25 controlled reinforced cement concrete of trap metal for raft slab including "V" haunches, formwork, scaffolding, compaction by vibrating, finishing curing etc. complete, RCC Grade with reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. with fine aggregates of required specifications (VSI sand finely washed etc.)
57
-
-
... More
Providing and laying in situ/ ready mix M-25 plain cement concrete of trap/ granite/ quartzite/ gneiss metal for cast in citu piers, abutment, returns, wings etc. including provision of "V" shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete, including plywood/ steel form work centering, excluding dewatering by means of pump and including bailing out water and curing, finishing in CM 1:3 etc. complete, as directed by engineer in charge, for height upto 5 M, with fully automatic micro processor based PLC with SCADA enabled Batch Mix Plant, with fine aggregates of required specifications (VSI sand finely washed etc.) The basic rate shall be increased for height above 5.00 m in following manner (A) Depth to 10 m percent extra for rate for, (B) Depth upto 15 m Add 40 percent extra for rate, (C) Depth upto 20 m Add 60 percent extra for rate, (D) Depth upto 20 m Add 100 percent extra
65
-
-
... More
Providing and laying in situ/ Ready Mix cement concrete M-25 of trap/ granite/quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, formwork, laying/ pumping cover blocks, compaction and curing roughening the surface if special finish is to be provided, (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled Reversible Drum Type mixer/ concrete Batch Mix plant (Pan mixer) etc. complete, with fine
16
-
-
... More
Providing and laying Cast in situ/ Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. Pardi of required thickness including centering, formwork, cover blocks, laying/ pumping, compacting, curing, finishing and roughening them if special finish is to be provided and curing complete, (Excluding reinforcement and structural steel) with fully automatic micro processor based PLC with SCADA enabled Reversible Drum Type mixer/ concrete Batch Mix plant (Pan mixer) etc. complete, with fine aggregate (Crushed sand V.S.I. Grade).
10
-
-
... More
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap /quartzite/granite /gneiss metal for R.C.C. Waist slab, and steps of staircases as per detailed design and drawings or as directed including steel centering, plywood/ steel formwork, steel props, laying/pumping, compaction, finishing uneven and
honeycombed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening the surface if special finish is to be provided and curing etc. complete. (Excluding enforcement, including cover block).(Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc.) with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
45
-
-
... More
Providing and fixing in position TMT FE -500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules, including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete
19
-
-
... More
Providing and laying Cast in situ/ Ready Mix cement concrete M-25 of trap/ granite/quartzite/ gneiss metal for R.C.C. Beams and Lintels as per detailed designs and drawings or as directed including centering, formwork, cover blocks, laying/ pumping, compaction and roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel), with fully automatic micro processor based PLC with SCADA enabled Reversible Drum Type mixer/ concrete Batch Mix plant (Pan mixer) etc. complete with fine aggregate (Crushed sand V.S.I. Grade).
1
-
-
... More
Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm. thick in cement mortar 1:4 using waterproofing compound at 1 kg per cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm. thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc. complete.
139
-
-
... More
Providing fine cement finish 1.5 mm. thick over green plaster surface including scaffolding curing etc. complete
131
-
-
... More
Filling in plinth and floors with approved excavated materials in 15 cm to 20 cm layers including watering & compaction complete.
172
-
-
... More
Providing dry trap rubble stone soling 15cm to 20cm thick including hand packing and compacting complete.
155
-
-
... More
Providing and applying two coats of exterior acraylic emulsion paint conforming to corresponding I.S. of approved manufacture and of approved colour to the plastered surfaces including cleaning, preparing the plaster surface, applying primer coat, scaffolding if necessary and watering the surface for two days etc. complete.
139
-
-
... More
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
1
-
-
... More
Royalty Charges
-
-
-
... More
Royalty Charges Rubble and Hard Murum
155.08
-
-
... More
Material Test Charges
-
-
-
... More
M-25 for RCC Raft with VSI Sand. CONCRETE Compressive Strength OF Cement Concrete Cube (Set of 3 cubes) test.
2
-
-
... More
Concrete Mix Design (With all Tests on basic materials).
1
-
-
... More
BASIC TEST OF AGGREGATE. Flakiness Index/ Elongation Index test.
1
-
-
... More
FINE AGGREGATES. Fineness Modulus (Sieve Analysis),Silt& Clay Content test.
1
-
-
... More
Batch Mix M25 for Piers, Abutments, Returns with V.S.I. Sand.CONCRETE Compressive Strength OF Cement Concrete Cube (Set of 3 cubes) test. CONCRETE Compressive Strength OF Cement Concrete Cube (Set of 3 cubes) test
1
-
-
... More
M-25 for R.C.C. Columns with Crushed Sand V.S.I. Grade CONCRETE Compressive Strength OF Cement Concrete Cube (Set of 3 cubes) tes
2
-
-
... More
M-25 for R.C.C. Pardi 75 mm thick, with Crushed Sand V.S.I. GradeCONCRETE Compressive Strength OF Cement Concrete Cube (Set of 3 cubes) test.
2
-
-
... More
TMT FE-500 bar reinforcement for R.C.C. 19.10 Metric Tonne Steel 1.00000 19.10 72 STEEL BAR TESTING Upto 16 mm (Set of 3 Bars) 1 Test per 5 M.T. 4 1340.00 5360.00 5-Bd-F :
4
-
-
... More
STEEL BAR TESTING Above 16 mm (Set of 3 Bars) (Tensile strength, %, Elongation, Yield
1
-
-
... More
Filling in plinth and floors with approved excavated materials. SOIL / MURUM Compaction Test (Proctor Density).
1
-
-
... More
SOIL / MURUM Liquid limit & plastic Limit test.
1
-
-
... More
Supply,Installation,Testingand And Commissioning Of Silo Machinery
-
-
-
... More
Supply,Installation,Testingand And Commissioning Of Chaine Conveyor 38 Mtrs,Elevator Tower With Platform,Bucket Elevator, Online Weighing Load Cells (Detailed Specification Mentioned In Tender Document)
1
-
-
... More
Installation And Commissioning Charges
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%