Department Of Agriculture Tender
... More
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Department Of Agriculture Tender
Civil And Construction
Building Construction
Eprocure
Opening Date18 Mar 2025
Closing Date21 Mar 2025
Tender Amount₹ 12,89,202
Costs
EMD
₹ 12,892Document Cost
₹ 590Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_DOA_1155176_2Bid Award Id
ViewTender No
1ATender Authority
Department Of Agriculture ViewPurchaser Address
-Website
http://http://krishi.maharashtra.gov.in/1001/Home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in soft rock without blasting l including boulders up to 0.6 m diameter(0.113 cum)for canal,seating of embarkment,filter drains/catch water drains etc and placing the excavated soft rock neatly in dump area or for formation of service road/embarkment including cost of materials,machinery,labour,dressing bed and sides to required level andprofile etc complete with lead up to 15 m and all lifts as directed.
122.61
69
8577.8
... More
Providing cut off trench filling using selected impervious soil directly available from material of excavation including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor including cost of water etc. complete with lead up to1 km for water and all lifts as directed.
68.73
63
4347.3
... More
cleaning cutting thorny shrubs bushes,grass with 15m. Lead and all lifts etc. complete as directed.
233.48
4
1078.68
... More
providing and laying in situ cement concrete of grade m-15 of trap/granite/gneiss/quartzite/graded metal for pcc with or without surface renforcement/rcc concreting for work of piers,abutments ets.with concrete mixer concidering lead of 50m with shutterig and scaffolding,placing ,compecting, curing etc complete with an initial lead of 50m and left of 1.5 m.
84.83
7260
615954.5
... More
cutting,bending,hooking,laying in position and tying m.s./hysd/tmt/ bars for reinforcement of R.C.C. work as per detailed drawing etc.complete as directed.
0.35
83460
29211.09
... More
providing and constrcting dry rubble rock toe using rubble and stone chips from approved source includind cost of all materials,machinery,labour,hand packing rubble and stone chips, finishing top and sides to required slopes etc complete with lead up to 50 m and all lift as directed.
41.4
3665
151751.7
... More
providing and consructing 230 mm thick dry rubble stone pitching using stones and chips from approved source from borrow area including cost of all materials, labours, hand packing/wedging stone chips,finishing etc complete with lead up to 50 m and all lifts as directed.
60
369
22174.2
... More
Parchase of Galvanized Wire mesh hot dipped
15 x 15 cm 3 mm, 1.22 Kg/ Sqm
199.00+ fixing 3% = 6.00/ Sqm
162.29
225
36596.4
... More
Providing, erecting and laying steel shuttering formwork for making surface suitable for concreting including dismantling etc. complete as directed.
337.41
535
180581.83
... More
Difference in cement rate
441
50
22050
... More
Difference in steel rate
0.35
3797
1328.95
... More
Add G S T amount 18%
1
198169
198169
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements