Chandrapur Cancer Care Foundation Tender
Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.
Chandrapur Cancer Care Foundation Tender
Plastic and Rubber
Eprocure
Opening Date26 Oct 2023
Closing Date29 Nov 2023
Tender Amount₹ 1,34,54,870 This is an estimated amount, exact amount may vary.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CHDPR_957400_1Bid Award Id
ViewTender No
D2_Vinyl_Flooring/01-2023Tender Authority
Chandrapur Cancer Care Foundation ViewPurchaser Address
-Website
http://mahatenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Extra for providing and fixing coving of suitable material for PVC flooring including the cost of labour and materials for coving. Length of coving shall be measured for payment.
900
-
-
... More
Providing and laying minimum 5mm thick heavy duty self levelling epoxy based flooring suitable for clean room applications with surface preparation, priming, laying of screed and top coat all as per the manufacturer's specifications. The floor to provide a joint less and smooth flooring, dust free and having excellent chemical resistance to most chemicals, and should also provide a tough floor topping to withstand foot traffic etc. completed.
Rate to be inclusive of 150mm high skirting with coving. Mode of measurement to be plan area only.
2472.89
-
-
... More
Providing and appyling 150 micron thick epoxy based paint suitable with surface preparation, priming, laying of screed and top coat all as per the manufacturer's specifications. Rate to be inclusive of wall putty, primer etc complete as per manufactures specifications.
2500
-
-
... More
A 37 screed installation - 25mm thickness Surface preparation:- Providing and cleaning all floor surface to make it free from dirt, dust, loose particles, wax, polish, efflorescence, laitance, curing compound and other contaminants by using wire brush, grinding all sharp edges to make it flush with the surface, etc and complete as per manufacturer's specification.
Note: All new substrate shall be allowed to cure and dry completely according to
standard practice. The base should be hard & strong (minimum tensile strength of 1.5 N/Sqmm). The base should be free from random cracking and potholes. Flatness of the base should be checked for level to ensure that the specified thickness of treatment can be applied over the whole area. All the expansion & movement joints should be properly cut and maintained for terminations. The preferred method of surface preparation is by mechanical means. This product shall not be applied on the floors that are known to have rising moisture at the time application. All application shall be not carried out where temperature less than 10 Deg C or where the ambient relative humidity is greater than 85%.Bonding slurry:- Providing and applying primer by mixing P 51, water, A37 and sand (0-4mm) in ratio of 1:2:2:2, etc and complete as per manufacturer's specification.
Note: The bonding slurry shall be prepared simultaneously while the screed mix is being ready. The screed shall be applied whilst the P 51 bonding slurry is wet. Any dried slurry is again recoated with P 51 slurry. Installation of screed:- Providing and installing screed by mixing 25 Kg of A 37, screed cement made up of high quality additives and superior polymer, to 125 Kg of screed sand with water by mechanical means, including installing level buttons, spreading the screed using straight edge, compacting at required thickness over the wet bonding slurry, continuing the day end joints or joints due to delay by applying bonding slurry, etc. and complete as per manufacturer's specification.
2500
-
-