Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Bridge And Roof Company India Limited Tender

Works
Paints and Enamels
Eprocure
Opening Date30 Dec 2023
Closing Date5 Feb 2024
Tender Amount₹ 9,35,74,535 
Notes
Download

Costs

Summary

Preparing The Surface For Painting (sspc-sp-10)and Supply And Application Of Pre-erection/shop Primer And Finish Paints On Steel Structures And Cs Pipes Including Supply Of All Materials,consumables,tools And Tackles, Plant,equipment And Machineries

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and applying FIELD PAINT SYSTEM of approved quality and shade as per Sl. No. 9.3.2 of Table 9.3 of EIL Specification No. B378-000-02-42-PCS-0001, Rev.2 (or as per Job Specifications, wherever applicable) over the coat of shop primer already applied, including storage, surface preparation, degreasing, cleaning, drying, providing necessary arrangement for access, testing etc. including touching up of shop primer coat as per Sl. No. 9.1.1 of Table 9.1 of EIL Specification No. B378-000-02-42-PCS-0001, Rev.2 (or as per Job Specifications, wherever applicable), for steel structures (excluding hand rails) at all location & levels inside / outside plant boundary, all complete as specified, in OFFISTE (COASTAL) areas as well as UNIT (COSTAL) areas considering environmental classification as INDUSTRIAL MARINE. (SUPPLY OF ALL MATERIAL IN CONTRACTOR'S SCOPE). (Unit rate based on Structural steel weight).

7255

48245750

6650

... More
FINAL Painting (Handrail): Supplying and applying COATING (Post-erection/ Field) of approved quality and shade as per Sl. No. 9.2.1 of Table 9.2 of EIL Specification No. B378-000-02-42-PCS-0001, Rev.2 (or as per Job Specifications, wherever applicable) for painting over the coat of shop primer & galvanisation already applied, including storage, surface preparation, degreasing, cleaning, drying, providing necessary arrangement for access, testing etc. including touching up of shop primer coat, for HAND RAILS at all location & levels, all complete as specified. (SUPPLY OF ALL MATERIALS IN CONTRACTOR'S SCOPE). (Unit rate based on weight of the hand rail Pipe and Structural steel weight).

112

744800

6650

... More
Painting of Hand Railing

-

-

-

... More
Painting of Hand railing assembly 1000 mm High: Supply of paints/primers, surface preparation including Repair of the damaged areas of galvanized coatings due to welding/during erection by cold galvanization (P-7) and applying primer (1 coat of P6 @ 40 micron DFT) as per Sl. No. 9.2.1 of Table 9.2 of EIL Specification No. B378-000-02-42-PCS-0001, Rev.2 (or as per Job Specifications, wherever applicable), etc. all complete as specified, shown and directed. (SUPPLY OF ALL MATERIALS IN CONTRACTOR'S SCOPE). (Complete handrail work shall be measured as length of top rail only and not length of each element fixed). (Hand Rail SKETCH attached for reference).

9000

2137500

237.5

... More
Painting of Hand railing assembly 500 mm High: Supply of paints/primers, surface preparation including Repair of the damaged areas of galvanized coatings due to welding/during erection by cold galvanization (P-7) and applying primer (1 coat of P6 @ 40 micron DFT) as per Sl. No. 9.2.1 of Table 9.2 of EIL Specification No. B378-000-02-42-PCS-0001, Rev.2 (or as per Job Specifications, wherever applicable), etc. all complete as specified, shown and directed. (SUPPLY OF ALL MATERIALS IN CONTRACTOR'S SCOPE). (Complete handrail work shall be measured as length of top rail only and not length of each element fixed). (Hand Rail SKETCH attached for reference).

30

5700

190

... More
Supplying and applying FIELD PAINT SYSTEM of approved quality and shade as per Sl. No. 9.3.2 of Table 9.3 of EIL Specification No. B378-000-02-42-PCS-0001, Rev.2 (or as per Job Specifications, wherever applicable) over the coat of shop primer already applied, including storage, surface preparation, degreasing, cleaning, drying, providing necessary arrangement for access, testing etc. including touching up of shop primer coat as per Sl. No. 9.1.1 of Table 9.1 of EIL Specification No. B378-000-02-42-PCS-0001, Rev.2 (or as per Job Specifications, wherever applicable), for all types of un insulated piping and insulated piping as specified including all pipes, fittings, flanges, supports, valves etc. at all location & levels, all complete as specified, in OFFISTE (COASTAL) areas as well as UNIT (COSTAL) areas considering environmental classification as INDUSTRIAL MARINE. Identification (Line numbering), lettering, colour bands, colour coding etc. as specified is including in contractor's scope. Notes: 1. All joints (fabrication as well as erection joints) shall be left unpainted till hydro testing. 2. No extra payment shall be made for identification (line numbering etc.) of insulated and uninsulated line 3. SUPPLY OF ALL MATERIAL IN CONTRACTOR'S SCOPE.

-

-

-

... More
For Following CS pipe sizes

-

-

-

... More
( Dia - .75 Inch )

5

285

57

... More
( Dia - 2 Inch )

1

133

133

... More
( Dia - 3 Inch )

1

190

190

... More
( Dia - 4 Inch )

2

475

237.5

... More
( Dia - 6 Inch )

22

7733

351.5

... More
( Dia - 8 Inch )

18

8208

456

... More
( Dia - 10 Inch )

10

5700

570

... More
( Dia - 12 Inch )

132

51414

389.5

... More
( Dia - 0.75 Inch )

5

285

57

... More
( Dia - 1.5 Inch )

3

313

104.5

... More
For Following VALVE sizes

-

-

-

... More
( Dia - 8 Inch )

9

5814

646

... More
( Dia - 4 Inch )

2

646

323

... More
( Dia - 6 Inch )

2

988

494

... More
Providing the following personel to B AND R with required experience and qualification for the purpose of B AND R's work on monthly basis. Note: 1. Contractor shall pay the wages, ESI and EPF to the personel mentioned below. 2. Contractor shall be capable to pay the wages as per tender document timely before 10th of every month from his own resources. 3. The contractor shall be liable for any issues arising in relation to EPF, ESI and shall deal with it taking responsibility of the related procedures. 4. The Contractor has to submit the CV/Resume/Bio-data of the peronel to be deployed for B AND R's works and shall deploy the personel only after approval of Engineer-in-Charge. 5. In case, the person employed by the contractor commits any act of omission/commission that amounts to misconduct/indiscipline/ incompetence, the contractor shall be liable to take appropriate disciplinary action against such persons, including their removal from the site of work. 6. The Contractor shall replace immediately any of its personnel found unacceptable to this office because of security risks, incompetence, conflict of interest, improper conduct etc. upon receiving a notice

-

-

-

... More
Safety Supervisor Qualification Criteria: Person possessing Graduation Degree in Science with Physics & Chemistry and degree or or a Diploma in Engg. or Tech. with minimum Two years of practical experience in construction work environment and should possess requisite skills to deal with construction safety & fire related day-to-day issues.

36

855000

23750

... More
Discipline Engineer (Mechanical) Qualification Criteria: Degree or Diploma in Engineering with following experience- Degree holders : 3 yrs of construction experience Diploma holders : 6 yrs of construction experience

36

1026000

28500

... More
Mechanical QA/QC Engineer Qualification Criteria: Degree or Diploma in Engineering with following experience- Degree holders : 10 yrs of construction experience of which minimum 3 years in QA/QC Diploma holders : 13 yrs of construction experience of which minimum 6 years in QA/QC

48

1824000

38000

... More
"NOTE:- THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST."

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.