Bhabha Atomic Research Centre Tender
... More
The BARC has issued a formal invitation for competitive bids for the Bhabha Atomic Research Centre project, for Health Assessment And Repair Of Civil Structure For Engineering Hall-7 And Fisbe Building At Sea Side Buildings, North Site, Barc, Trombay, Mumbai in Mumbai, Maharashtra, with an estimated contract value of Rs. 25,45,000. The bid opening date for this tender is 06-02-2025 and the last date for bid submission is 11-03-2025. Interested bidders for Bhabha Atomic Research Centre tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Bhabha Atomic Research Centre - BARC Tender
Civil And Construction
Building Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date6 Feb 2025
Closing Date11 Mar 2025
Tender Amount₹ 25,45,000
Costs
EMD
₹ 60,062Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BARC_847701_1Bid Award Id
ViewTender No
BARC/CED/ET/53/2024-2025 Dated 20/01/2025Tender Authority
Bhabha Atomic Research Centre ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and repairing to external plastering in cement mortar 1:4 (using crushed sand) of thickness 12 mm to 20 mm in patches of area up to 2.5 sq metres including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls ncluding admixtured with approved Water proofing compound @ 2% by weight of cement used and as per manufacturer's specifications ,sieving of sand to required fineness complete including disposal of rubbish to the dumping ground within 50 metres lead
100
-
-
... More
Conducting profometer scan at specified location of the structure for reinforcement steel location, size and cover measurement, etc. complete.
50
-
-
... More
Providing, centering ,shuttering Form work using PVC film faced plywood to get a neat form finish surface for all types of structures including necessary strutting, proping, staging, supports etc and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels.
-
-
-
... More
Conducting ultra sonic pulse velocities tests, at all locations prepared after chipping the plaster, on columns, beams and portal frames to assess the integrity of concrete as per BIS/ASTM specifications etc. complete.
60
-
-
... More
Debris Beyond 1 Km but up to and including 2 km. Note: The rates in respect of this item is applicable for NET Quantities arrived at after making deduction for voids @ 30% from corresponding TRUCK Measurement.
100
-
-
... More
Providing and applying wall painting two coats on new work with premium plastic emulsion paint of approved brand to give an even shade, including a coat of approved cement primer, including preparation of the surfaces, scaffolding complete. as per specifications and as directed by the Engineer-in-charge.
3000
-
-
... More
For Super Structure.
500
-
-
... More
Extraction and testing of concrete drill dust samples from the structure. Three drill dust samples from depths 0-15mm, 15-30mm and 30-45mm shall be colleted from each location. The samples shall be tested for chlorides, sulphates, PH and alkalinity.
30
-
-
... More
Preparation and submission of two copies of draft report as specified followed by five copies of final report along with a soft copy of the same on diskete covering Non Destructive test observations, analysis, interpretations and conclusions of NDT observations, drawing out measures for durability make up, estimation of repair quantities, rate, rate anlysis for major repair items. Note: 1. The building height is approx. 20 height of highbay area. The rates quoted for item No. 1 to 8 shall include preparation of test area, making good the areas with polymer modified mortar, disposing of debris and necessary scaffolding arrangements for testing.
1
-
-
... More
Structural repairs works with pre-packed dual shrinkage controlled (volume stable in wet & hardened state), single-component ready-to-use, structural grade high build, alkali-resistant, fibre reinforced, thixotropic polymer modified repair mortar having excellent bond strength to old damaged concrete structures / surfaces by the following process: 1) Removal of loose/spalled or damaged concrete by chipping and cleaning the concrete surface to open up to 20mm behind the reinforcement steel with wire brush and with clean water including removal of dirt, paint, wax, oil, grease, laitance, foreign substances, etc. Mechanically profile and prepare concrete surfaces by abrasive blasting, water jetting or other engineer approved methods 2) Cleaning the rebars with Acetone for complete rust removal and washing with water to make the surface clean. Ensure that the concrete substrate and ambient temperatures are between (10°C and 35°C) before application 3) Applying protective coat / bond coat using Styrene Butadiene Rubber (SBR) polymer and cement in the proportion of 1: 1 (1 part of polymer : 1 parts of cement). 4) Mixing full 25 Kg bag with clean potable water in water to product ratio of 0.12 to 0.18, mixed by heavy-duty slow speed (300 to 600 rpm) drill with spiral mixing paddle or forced action pan mixer pan for 3 minutes to achieve uniform lump free mortar consistency. 5) Applying polymer modified mortar with trowel & float. The polymer modified mortar shall have the following properties /technical parameters:(A) Properties / technical parameters of pre-packed Polymer Modified Mortar: i) Compressive strength 1 day: Min. 20 MPa (as per BS:6319 : Part 2) ii) Compressive strength 7 days: Min. 35 MPa (as per BS:6319 : Part 2) iii) Compressive strength 28 days: Min. 45 MPa (as per BS:6319 : Part 2) iv) Flexural strength in 28 days: Min. 7 Mpa (as per BS:6319 : Part 3) v) Tensile strength in 28 days: Min. 2.5 MPa (as per BS:6319 : Part 7) vi) Bond strength: Min. 5 MPa (as per ASTM : C881) vii) Water permeability: less than 1% (as per ASTM : C881) viii) Drying shrinkage in 28 days: less than 1000 microstrain (as per ASTM C 157-93) ix) Potential Alkali Reactivity - : 0.1% Expansion % ( ASTM C1260)
(B) Properties / technical parameters of SBR polymer bond coat material: i) Meets the requirements of BS 6319 part 2:1983 & ASTM C 190-85 standards ii) Total solids % by mass at 105°C: 38 + 1 iii) pH value: 7.5 to 9.5 iv) Specific gravity at 27.5°C: 1 to 1.05 v) Coverage: 4.2 - 4.5 sq.m/kg per coat Notes:- (a)Placing and finishing the same with trowel / hand packing carefully compacting the same around the rebars and finishing to bring it in line with existing concrete surface on the beams, slabs, columns, etc. (b) If thickness of repair exceeds 20mm , after every 20 mm thick repair, bond coat as per process no. (3) mentioned above in the BOQ item, to be applied and further thickness of repair to be continued for each layer. (c) The surface preparation & method of application shall be as per manufacturer's technical data sheet. (d) The double tubular steel scaffolding will be paid separately in relevant item. (e) Sampling and testing of cube specimen for compressive strength test shall be as per BS 6319 - Part-2.Other tests mentioned above shall be carried out if required as per the direction of the EIC and the cost of which shall be deemed to be included in the quoted rate (f) For each batch of mortar mixed, following records, i.e Quantity of mortar (kg) mixed, Amount of water added to the mix, Location of application and the area covered.(g) Payment will be paid on the basis of actual consumption of PMM & Reinforcement will be paid in the relevant item. (h) Safety Precuations:- Use wear tight-fitting, dust-resistant, chemical splash goggles and dust respirator, if airborne dust is generated, wear protective rubber hand gloves, wear appropriate clothing to prevent any possibility of skin contact. The above item of work is inclusive of all materials, labour, machinery, tools & tackels, consumables, trasportation, loading & unloading, safety PPEs etc. all complete as directed by Engineer-incharge at site using approved pre-packed polymer modified mortar suitable for structural repair works. Tentative / suggested make for the guidance of the bidder(s): M/s. BASF, Pidilite, FOSROC or equivalent.
1250
-
-
... More
Dismantling of RCC works carefully manually without damaging adjacent structures excluding cutting of reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200 m lead as per direction of Engineer-in-charge.
10
-
-
... More
Extra for cutting of reinforcement in RCC, stacking the same and returning the steel scrap to the departmental stores all as per direction of Engineer-in-charge.
5
-
-
... More
Conducting Linear Polarisation Resistance test at all locations to assess the risk of corrosion including exposing the reinforcement for carrying out the test. The test shall be conducted as per BIS/ASTM specifications. The quoted rate shall include charges for filling back areas chipped for exposing the reinforcement with polymer modified mortar and submission of test reports. 5(Five) potential observations taken at one location will form a unit for measurement purposes.
20
-
-
... More
Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated G.I.binding wire all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings. Steel Supplied by the Contractor.
-
-
-
... More
Using TMT bars of specified grades all dia bars confirming to IS 1786. All test reports to be provided along with the supply of the materials.
0.5
-
-
... More
Conducting carbonation depth test study on the structure.
30
-
-
... More
Conducting rebound hammer test as per BIS/ASTM standards etc. complete.
60
-
-
... More
Conducting half-cell potential meter test at all locations to access the risk of corrosion including exposing the reinforcement for carrying out the test. The test shall be conducted as per BIS/ASTM specification. The quoted rate shall include charges for filling back areas chipped for exposing the reinforcement with polymer modified mortar. 5(Five) potential observations taken at one location will form a unit for measurement purposes.
30
-
-
... More
Dismantling old plaster / skirting carefully , raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead.
300
-
-
... More
Supplying of unskilled man power / labour for loading / unloading, area cleaning and miscellaneous civil works etc including cost of equipment whichever is required at site.
200
-
-
... More
Extraction of concrete (75mm dia) cores from locations specified and testing for crushing strength, water absorption & unit weight. The quoted rate shall include charges for filling back the core with polymer modified mortar and finishing etc. complete.
40
-
-
... More
Lead charges for Lead Exceeding 1 KM but not exceeding 2 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
-
-
-
... More
Providing and fixing double tubular scaffolding system using H- frames/APS system or (cup lock type) on the exterior side upto seven storey made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevational area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding.
1200
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements