Airports Authority Of India Tender

Search from over 12139+ business opportunities that have been announced from the biggest Mahatenders, e tender Maharashtra, Maharashtra government tenders, and the Online Tender Notices posted on Maharashtra e tenders till date. Find opportunities that have come in from the multiple corporations, Maharashtra government departments, State PSUs, and Private companies from the state.

Airports Authority Of India - AAI Tender

Works
Security and Emergency Services
Eprocure
Opening Date3 Dec 2024
Closing Date23 Dec 2024
Tender Amount₹ 36,53,770 
Notes
Download

Costs

Summary

Provision Of Fire Supression System For Cns/atm Facilities At Kolhapur Airport

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Design, Supply, Installation, Testing & Commissioning of Clean Agent Gas Flooding System for following areas, complete using Gas Agent as per NFPA 2001. Supply of Cylinder UL listed/FM/VDS/LPCB/CCOE(PESO) Approved, complete with valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc,electronic control head/Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap. Gas-Quantity would be as per the design volume and as per the necessary codal specifications UL Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head, Discharge Hoseand Gas discharge Warning sign, Nozzles including providing, installing, testing and commissioning of Gas Release Panel complete with timer, battery backup, Gas Release/Gas Abort Switch etc. complete system as required. item also includes Fire alarm system for crosszoning and supply & laying of Fire survival cable, detector & panels. Note: The Individual system will be provided in specified areas only. The contractor will design the system as per NFPA 2001. The contractor will get the design approved by AAI before execution. Statutory Approvals will be taken from concerned authorities. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/distributors shall be submitted prior to starting of the works. (Area, Volume mentioned here are approx. values and given for indicative purpose, agency has to design for actual measurments at site and as per drawings) (Individual system) - Battery room, FF, ATC Building Surface area:-13.5 (Approx.) Total volume:- 47.60 cubic mtr (Approx.)

1

-

-

... More
Design, Supply, Installation, Testing & Commissioning of Clean Agent Gas Flooding System for following areas, complete using Gas Agent as per NFPA 2001. Supply of Cylinder UL listed/FM/VDS/LPCB/CCOE(PESO) Approved, complete with valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc,electronic control head/Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap. Gas-Quantity would be as per the design volume and as per the necessary codal specifications UL Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head, Discharge Hoseand Gas discharge Warning sign, Nozzles including providing, installing, testing and commissioning of Gas Release Panel complete with timer, battery backup, Gas Release/Gas Abort Switch etc. complete system as required. item also includes Fire alarm system for crosszoning and supply & laying of Fire survival cable, detector & panels. Note: The Individual system will be provided in specified areas only. The contractor will design the system as per NFPA 2001. The contractor will get the design approved by AAI before execution. Statutory Approvals will be taken from concerned authorities. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/distributors shall be submitted prior to starting of the works. (Area, Volume mentioned here are approx. values and given for indicative purpose, agency has to design for actual measurments at site and as per drawings) (Individual system) - UPS Room, FF, ATC Building Surface area:-12 Sqmtr. (Approx.) Total volume:- 42.00 cubic mtr (Approx.)

1

-

-

... More
Design, Supply, Installation, Testing & Commissioning of Clean Agent Gas Flooding System for following areas, complete using Gas Agent as per NFPA 2001. Supply of Cylinder UL listed/FM/VDS/LPCB/CCOE(PESO) Approved, complete with valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc,electronic control head/Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap. Gas-Quantity would be as per the design volume and as per the necessary codal specifications UL Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head, Discharge Hoseand Gas discharge Warning sign, Nozzles including providing, installing, testing and commissioning of Gas Release Panel complete with timer, battery backup, Gas Release/Gas Abort Switch etc. complete system as required. item also includes Fire alarm system for crosszoning and supply & laying of Fire survival cable, detector & panels. Note: The Individual system will be provided in specified areas only. The contractor will design the system as per NFPA 2001. The contractor will get the design approved by AAI before execution. Statutory Approvals will be taken from concerned authorities. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/distributors shall be submitted prior to starting of the works. (Area, Volume mentioned here are approx. values and given for indicative purpose, agency has to design for actual measurments at site and as per drawings) (Individual system) - Equipment room, FF, ATC Building Surface area:-53.5 Sqmtr (Approx.) Total volume:-186.5 cubic mtr (Approx.)

1

-

-

... More
Design, Supply, Installation, Testing & Commissioning of Clean Agent Gas Flooding System for following areas, complete using Gas Agent as per NFPA 2001. Supply of Cylinder UL listed/FM/VDS/LPCB/CCOE(PESO) Approved, complete with valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc,electronic control head/Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap. Gas-Quantity would be as per the design volume and as per the necessary codal specifications UL Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head, Discharge Hoseand Gas discharge Warning sign, Nozzles including providing, installing, testing and commissioning of Gas Release Panel complete with timer, battery backup, Gas Release/Gas Abort Switch etc. complete system as required. item also includes Fire alarm system for crosszoning and supply & laying of Fire survival cable, detector & panels. Note: The Individual system will be provided in specified areas only. The contractor will design the system as per NFPA 2001. The contractor will get the design approved by AAI before execution. Statutory Approvals will be taken from concerned authorities. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/distributors shall be submitted prior to starting of the works. (Area, Volume mentioned here are approx. values and given for indicative purpose, agency has to design for actual measurments at site and as per drawings) Providing, Fixing,Testing and commissioning ISI marked portable type fire extinguishers of 6 Kg capacity ABC Dry Powder type as per IS‐ 15683 complete as per specification and fixed / install as per site condition, as required.

10

-

-

... More
Design, Supply, Installation, Testing & Commissioning of Clean Agent Gas Flooding System for following areas, complete using Gas Agent as per NFPA 2001. Supply of Cylinder UL listed/FM/VDS/LPCB/CCOE(PESO) Approved, complete with valve assembly and arrangement for supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc,electronic control head/Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap. Gas-Quantity would be as per the design volume and as per the necessary codal specifications UL Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head, Discharge Hoseand Gas discharge Warning sign, Nozzles including providing, installing, testing and commissioning of Gas Release Panel complete with timer, battery backup, Gas Release/Gas Abort Switch etc. complete system as required. item also includes Fire alarm system for crosszoning and supply & laying of Fire survival cable, detector & panels. Note: The Individual system will be provided in specified areas only. The contractor will design the system as per NFPA 2001. The contractor will get the design approved by AAI before execution. Statutory Approvals will be taken from concerned authorities. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/distributors shall be submitted prior to starting of the works. (Area, Volume mentioned here are approx. values and given for indicative purpose, agency has to design for actual measurments at site and as per drawings) Providing, Fixing,Testing and commissioning ISI marked portable type fire extinguishers of CO2 type 4.5 kg capacity as per IS‐ 15683 complete as perspecification and fixed / install as per site condition, as required.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.