West Central Railway Tender

... More
Know all about the latest MP tenders along with the tender details and downloadable document on BidAssist. Here, on this page, we shall help you search for every MPtender posted on the official website of mptenders.gov.in according to authority, district, etc. Be it an irrigation tender or MP PWD tender, and we will tell you how to bid for these and more.

West Central Railway - WCR Tender

Works
Civil And Construction
Civil Works Others
Ireps
Opening Date24 Feb 2025
Closing Date21 Mar 2025
Tender Amount₹ 78,27,184 
Notes
Download

Costs

Summary

Modification To Existing Ohe Including Design, Supply , Dismantling, Erection, Testing And Commissioning Of Ohe And Portal In Dgd Yard

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
31(a) Modification to erected equipment :Transfer of equipment from one mast or support to another.

-

-

108875

... More
3e)(i) Supply and erection of Guy rod assembly . 6

-

-

44864

... More
31(k) Modification to erected equipment: Dismantling of Guy Rod with Termination. 16

-

-

3900

... More
16(a)(i) Supply & erection of structure Bond.

-

-

24315

... More
3(b)(iii) Supply of special fabricated and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii). 4

-

-

169689

... More
26(c)(ii): Supply & erection of solid copper bus-bar connectors: Bus splice(6320).

-

-

15045

... More
3(b)(ii) Supply and erection of Structure steel (traction masts) fabricated and galvanized of all Type : B-Series Mast.(Some steel will be supplied by Railway store i.e. Bhopal or else.)

-

-

116844

... More
9(a) Supply without Insulator and erection of anticreep with galavanized steel wire. 11

-

-

29661

... More
5(ax)(i) Supply of 9-Tonne Porcelain insulators (CD-1050mm) for item 5a)I, 5b) & 5c) of Schedule-4

-

-

14860

... More
11(a)(i) Supply without Insulator and erection of cut-in (9Tonne) Insulator. 7

-

-

12792

... More
31(j) Modification to erected equipment: Dismantling of Portal/TTC boom. 15

-

-

38955

... More
8(b)(i) Supply without insulator and erection of material for termination of Single conductor of Over head equipment or terminating wire.

-

-

6973

... More
2(a)i) Concrete for foundation and plinth: In hard soil. 2

-

-

138570

... More
4(bx)(i) Supply of 9-Tonne Porcelain Insulators (CD -1050mm )for item 4b)i&4b)iii of Schedule-3

-

-

7430

... More
4(ax)(iv) Supply of bracket Porcelain(CD-1050 mm) Insulators for item 4a)i & 4a)iii of Schedule-3

-

-

63350

... More
16(c)Supply & erection of a transverse and special bond. 14

-

-

20150

... More
26(c)(i)Supply & erection of solid copper bus-bar connectors: Bus terminal (6310). 9

-

-

13660

... More
2(b) Concrete for foundation and plinth: In other than hard soil and rock.

-

-

668400

... More
4(ax)(i)Supply of Stay Arm Porcelain (CD-1050 mm) Insulators for item 4a)i & 4a)iii of Schedule-3

-

-

73575

... More
5) Breaking of existing concrete foundation and concrete at other places and resurfacing. 2

-

-

41300

... More
5(a)(i) Supply without insulator and erection of mounting arrangements for span wire.

-

-

46782

... More
3(b)(i) Supply of fabricated and galvanized structures (O,N & R type portals) with all necessary components other than masts.

-

-

2118090

... More
31(l) Modification to erected equipment: Dismantling of Mast/Upright by gas cutting.

-

-

11796

... More
26a)(ii) Supply & erection of Solid copper bus-bars 18mm. 8

-

-

83430

... More
31(d) Modification to erected equipment :Dismantling of overhead equipment.

-

-

6832.5

... More
31(i) Modification to erected equipment :Dismantaling of an Isolator 14

-

-

1326

... More
15(a)(i) Supply & erection of large copper jumpers. 4

-

-

19016

... More
15) Supply & Erection of 55KV DP Isolator complete with SPS.

-

-

126180

... More
8(b)(iii) Supply without Insulator and erection of material for termination of all aluminium 25KV Feeder / return conductor (Single SPIDER). 6

-

-

7407

... More
3(i) Supply and erection of 25KV Caution Boards/Plates. 7

-

-

425

... More
11(ax)(i)Supply of 9-Tonne Porcelain insulators (CD-1050 mm) for Item no. 11a)i , & 11a)ii of Schedule-1 8

-

-

78015

... More
1(a) Preparation of designs and drawings for overhead equipment. 2

-

-

40234

... More
11(b) Supply without Insulator and erection of 25 kV Post Insulator.

-

-

20655

... More
9(ax)(i)Supply of 9-Tonne Porcelain insulators (CD-1050 mm) for Item 9a,9b, 9c, 9d ,of Schedule-1

-

-

7430

... More
5(az)(ii)Supply and erection of span wire. 2

-

-

509700

... More
31 o) Modification to erected equipment: Dismantling of existing cantilever assembly.

-

-

33950

... More
31(n) Modification to erected equipment: Dismantling of Post/Pedestal Insulator 19

-

-

2155

... More
13) 100% Extra on erection rates for work done under power block for schedule items.

-

-

500000

... More
6) Provision of new dropper and readjustment. 3

-

-

68955

... More
14) Erection of portal booms/fabricated portal booms etc. by Road crane arranged by contractor at his own cost. 6

-

-

59463

... More
6(az)Supply and erection of Over Head equipment only. 3

-

-

98315

... More
31(m) Modification to erected equipment: Dismantling of ATD (Regulating Equipment) with counter weights. 18

-

-

13690

... More
17(e)Supply and erection of 8 SWG G.I. wire for earthing.

-

-

240

... More
8(bx)(i)Supply of 9-Tonne Porcelain insulators (CD-1050 mm) for item 8b)I , 8b)ii , 8b)iii , 8b)iv & 13 of Schedule-3

-

-

7430

... More
11(bx) Supply of 25 KV Post Insulator for Item no.11b) of Schedule-1

-

-

112095

... More
11(a)(ii) Supply without Insulator and erection of a suspension (9 Tonne) Insulator. 8

-

-

29025

... More
2(a)ii) Concrete for foundation and plinth: In rocky soil. 3

-

-

765000

... More
17(a)Supply & erection of a single earth electrode. 15

-

-

4155

... More
31(b) Modification to erected equipment :Provision of an additional bracket assembly/ assemblies on a mast or support. 11

-

-

4598

... More
3(c) Supply only of fabricated steel other than masts. 5

-

-

814970

... More
8(b)(ii)Supply without Insulator and erection of materials for termination of Double conductor. 10

-

-

22898

... More
16(b)Supply and erection of a longitudinal bond. 13

-

-

10210

... More
15(az)(iii)Supply & erection of copper jumpers. 6

-

-

2140

... More
12) Transportation charges for OHE material 4

-

-

12000

... More
8(a)(xii) Marking/painting of temperature & 'Y'- Measurement of OHE mast at BWA locations.

-

-

272

... More
15(a)(ii)Supply & erection of small copper jumpers. 5

-

-

17290

... More
31(e) Modification to erected equipment :Dismantling of Feeder/Return conductor 13

-

-

12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.